Nilansh Celeste

by NSSN INFRA PRIVATE LIMITED

Lucknow, Uttar Pradesh · UPRERAPRJ911971/09/2024

Registered

Total units

633

Overview

Registration Date2024-09-30
RERA NumberUPRERAPRJ911971/09/2024
Promoter IDUPRERAPRM191514
Proposed Start2024-10-06
Proposed Completion2029-07-28

Location

DistrictLucknow
TehsilLucknow
VillageAishbagh
LocalityLucknow
AddressPart of Plot no. 4, Mill Road, Aishbagh, Lucknow
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units633
Unit Types5
Blocks7
Floors15

Khasra records (1)

  • Part of Plot no. 4· Plot· 3137914

Inventory

Apartments (219 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
Tower AGFOTHER000
Tower A13 BHK488.323
Tower A12 BHK276.32
Tower A12 BHK268.32
Tower A23 BHK488.323
Tower A22 BHK276.32
Tower A22 BHK268.32
Tower A33 BHK488.323
Tower A32 BHK276.32
Tower A32 BHK268.32
Tower A43 BHK488.323
Tower A42 BHK276.32
Tower A42 BHK268.32
Tower A53 BHK488.323
Tower A52 BHK276.32
Tower A52 BHK268.32
Tower A63 BHK488.323
Tower A62 BHK276.32
Tower A62 BHK268.32
Tower A73 BHK488.323
Tower A72 BHK276.32
Tower A72 BHK268.32
Tower A83 BHK488.323
Tower A82 BHK276.32
Tower A82 BHK268.32
Tower A93 BHK488.323
Tower A92 BHK276.32
Tower A92 BHK268.32
Tower A103 BHK488.323
Tower A102 BHK276.32
Tower A102 BHK268.32
Tower A113 BHK488.323
Tower A112 BHK276.32
Tower A112 BHK268.32
Tower A123 BHK488.323
Tower A122 BHK276.32
Tower A122 BHK268.32
Tower A133 BHK488.323
Tower A132 BHK276.32
Tower A132 BHK268.32
Tower A143 BHK488.323
Tower A142 BHK276.32
Tower A142 BHK268.32
Tower BGFOTHER000
Tower B14 BHK4127.684
Tower B13 BHK4104.473
Tower B13 BHK4105.113
Tower B24 BHK4127.684
Tower B23 BHK4104.473
Tower B23 BHK4105.113
Tower B34 BHK4127.684
Tower B33 BHK4104.473
Tower B33 BHK4105.113
Tower B44 BHK4127.684
Tower B43 BHK4104.473
Tower B43 BHK4105.113
Tower B54 BHK4127.684
Tower B53 BHK4104.473
Tower B53 BHK4105.113
Tower B64 BHK4127.684
Tower B63 BHK4104.473
Tower B63 BHK4105.113
Tower B74 BHK4127.684
Tower B73 BHK4104.473
Tower B73 BHK4105.113
Tower B84 BHK4127.684
Tower B83 BHK4104.473
Tower B83 BHK4105.113
Tower B94 BHK4127.684
Tower B93 BHK4104.473
Tower B93 BHK4105.113
Tower B103 BHK4104.473
Tower B103 BHK4105.113
Tower B113 BHK4104.473
Tower B113 BHK4105.113
Tower B124 BHK4127.684
Tower B123 BHK4104.473
Tower B123 BHK4105.113
Tower B134 BHK4127.684
Tower B133 BHK4104.473
Tower B133 BHK4105.113
Tower B144 BHK4127.684
Tower B143 BHK4104.473
Tower B143 BHK4105.113
Tower CGFOTHER000
Tower C13 BHK488.323
Tower C12 BHK276.32
Tower C12 BHK268.32
Tower C23 BHK488.323
Tower C22 BHK276.32
Tower C22 BHK268.32
Tower C33 BHK488.323
Tower C32 BHK276.32
Tower C32 BHK268.32
Tower C43 BHK488.323
Tower C42 BHK276.32
Tower C42 BHK268.32
Tower C53 BHK488.323
Tower C52 BHK276.32
Tower C52 BHK268.32
Tower C63 BHK488.323
Tower C62 BHK276.32
Tower C62 BHK268.32
Tower C73 BHK488.323
Tower C72 BHK276.32
Tower C72 BHK268.32
Tower C83 BHK488.323
Tower C82 BHK276.32
Tower C82 BHK268.32
Tower C93 BHK488.323
Tower C92 BHK276.32
Tower C92 BHK268.32
Tower C103 BHK488.323
Tower C102 BHK276.32
Tower C102 BHK268.32
Tower C113 BHK488.323
Tower C112 BHK276.32
Tower C112 BHK268.32
Tower C123 BHK488.323
Tower C122 BHK276.32
Tower C122 BHK268.32
Tower C133 BHK488.323
Tower C132 BHK276.32
Tower C132 BHK268.32
Tower C143 BHK488.323
Tower C142 BHK276.32
Tower C142 BHK268.32
Tower DGFOTHER000
Tower D13 BHK4110.314
Tower D13 BHK2104.413
Tower D13 BHK2105.233
Tower D23 BHK4110.314
Tower D23 BHK2104.413
Tower D23 BHK2105.233
Tower D33 BHK4110.314
Tower D33 BHK2104.413
Tower D33 BHK2105.233
Tower D43 BHK4110.314
Tower D43 BHK2104.413
Tower D43 BHK2105.233
Tower D53 BHK4110.314
Tower D53 BHK2104.413
Tower D53 BHK2105.233
Tower D63 BHK4110.314
Tower D63 BHK2104.413
Tower D63 BHK2105.233
Tower D73 BHK4110.314
Tower D73 BHK2104.413
Tower D73 BHK2105.233
Tower D83 BHK4110.314
Tower D83 BHK2104.413
Tower D83 BHK2105.233
Tower D93 BHK4110.314
Tower D93 BHK2104.413
Tower D93 BHK2105.233
Tower D103 BHK4110.314
Tower D103 BHK2104.413
Tower D103 BHK2105.233
Tower D113 BHK4110.314
Tower D113 BHK2104.413
Tower D113 BHK2105.233
Tower D123 BHK4110.314
Tower D123 BHK2104.413
Tower D123 BHK2105.233
Tower D133 BHK4110.314
Tower D133 BHK2104.413
Tower D133 BHK2105.233
Tower D143 BHK4110.314
Tower D143 BHK2104.413
Tower D143 BHK2105.233
Tower EGFOTHER000
Tower E13 BHK488.323
Tower E12 BHK276.32
Tower E12 BHK268.32
Tower E23 BHK488.323
Tower E22 BHK276.32
Tower E22 BHK268.32
Tower E33 BHK488.323
Tower E32 BHK276.32
Tower E32 BHK268.32
Tower E43 BHK488.323
Tower E42 BHK276.32
Tower E42 BHK268.32
Tower E53 BHK488.323
Tower E52 BHK276.32
Tower E52 BHK268.32
Tower E63 BHK488.323
Tower E62 BHK276.32
Tower E62 BHK268.32
Tower E73 BHK488.323
Tower E72 BHK276.32
Tower E72 BHK268.32
Tower E83 BHK488.323
Tower E82 BHK276.32
Tower E82 BHK268.32
Tower E93 BHK488.323
Tower E92 BHK276.32
Tower E92 BHK268.32
Tower E103 BHK488.323
Tower E102 BHK276.32
Tower E102 BHK268.32
Tower E113 BHK488.323
Tower E112 BHK276.32
Tower E112 BHK268.32
Tower E123 BHK488.323
Tower E122 BHK276.32
Tower E122 BHK268.32
Tower E133 BHK488.323
Tower E132 BHK276.32
Tower E132 BHK268.32
Tower E143 BHK488.323
Tower E142 BHK276.32
Tower E142 BHK268.32
Convenient ShopsGFSHOP1414.90
Convenient Shops1SHOP114.90
Tower B104 BHK4127.684
Tower B114 BHK4127.684
Club BuildingGFOTHER1376.40
Club Building1OTHER1377.030

Permits & Approvals

Permit NoGroup Housing/12293/LDA/BP/23-24/0158/04062024
Permit Date2024-07-29
Valid Until2029-07-28
Extendable Until2032-07-28

Documents

Filing documents

  • Details of Encumbrances
  • Other Plan(If Any)
  • Proforma of Completion Certificate(Occupancy)
  • Affidavit (Form-B)
  • Details of Encumbrances#New(2024-08-21)
    View
  • Commencement Certificate#New(2024-08-05)
    View
  • Proforma of Application Form#New(2024-08-06)
    View
  • Proforma of Allotment Letter#New(2024-08-06)
    View
  • Proforma of Conveyance Deed#New(2024-08-06)
    View
  • Waste Disposal Plan#New(2024-08-05)
    View
  • Water Supply Plan#New(2024-08-05)
    View
  • Electricity Supply Plan#New(2024-08-05)
    View
  • Development Work Plan#New(2024-08-05)
    View
  • Affidavit (Form-B)#New(2024-08-05)
    View
  • CA CERTIFICATE#New(2024-08-07)
    View
  • ARCHITECT CERTIFICATE#New(2024-08-06)
    View
  • ENGINEERS CERTIFICATE#New(2024-08-06)
    View
  • Other#New(2024-08-07)
    View
  • Proforma of Agreement for Sale#New(2024-08-06)
    View

Land documents

  • Lease Deed#3007(2023-03-28)
    11885572097.pdf
    View
  • Extract of Khatauni#RLDA Letter for Repayment of Installments(1900-01-01)
    11885573071.pdf
    View

Project Team

Architect Address5/171, Viram Khand, Gomti Nagar, Lucknow, UP
Engineer Address1/353, Vinamra Khand, Gomti Nagar, Lucknow, UP

Developer & Contact

Developer

Promoter NameNSSN INFRA PRIVATE LIMITED
Promoter AddressPINKI APARTMENT, 93-N DALIBAGH, LUCKNOW, UTTAR PRADESH, INDIA-226001
Company TypeCompany
Mobile9935580008
Emailnssninfra27082019@rediffmail.com
Registered AddressPINKI APARTMENT, 93-N DALIBAGH, LUCKNOW, UTTAR PRADESH, INDIA-226001
Contractor Address93-N, Dalibagh, Lucknow, UP- 226001

Bank Accounts

Account Typecollection
Account Number7177002900002959
Account NameNSSN Infra Private Limited Collection Account Nilansh Celeste
Bank NamePunjab National Bank
BranchAshok Marg Lucknow
Branch Address10, Ashok Marg, Hazratganj, Lucknow
Branch DistrictLucknow
Branch StateSelect
IFSCPUNB0717700
Branch Emailbo7177@pnb.co.in
Account Typeseparate
Account Number7177002100010541
Account NameNSSN Infra Private Limited Separate Account Nilansh Celeste
Bank NamePunjab National Bank
BranchAshok Marg Lucknow
Branch Address10, Ashok Marg, Hazratganj, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCPUNB0717700
Account Typetransaction
Account Number7177002900002968
Account NameNSSN Infra Private Limited Transaction Account Nilansh Celeste
Bank NamePunjab National Bank
BranchAshok Marg Lucknow
Branch Address10, Ashok Marg, Hazratganj, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCPUNB0717700

Development & Facilities

Development works

Demarcation Of PlotsWe have one plot of size 31379.14 sq. mtr.having 04 main entrance gate from the 45 m wide front road.
Boundary Wall1.80 m high and 230 & 115 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
Road Work9.0 M/7.50M & 6.0 Meter wide driveways have been provided all along the building blocks as per LDA/Fire norms.
FootpathsWe would not provide any footpath
Water Supply Including Drinking Water FacilitiesWe will provide Two nos. of pump for the requirement of blocks through underground pipelines.
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
ParksWe will provide green area with the different activities and the green area will have gaming facilities for kids.
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.
Community BuildingsClub building with GYM/Party Hall, Swimming pool, Play Areas and convinient shops as per norms have been provided.
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemWe will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesWe will have staircases which will be provided with emergency exit doors and emergency exit gates
Other Miscellaneous WorkNA

Financials

Registration Fee (₹)158500
Project Duration (months)58