Registered
Total units
58
Overview
Registration Date2024-08-26
RERA NumberUPRERAPRJ764470/08/2024
Promoter IDUPRERAPRM280426
Proposed Start2024-07-15
Proposed Completion2029-07-14
Location
DistrictLucknow
TehsilLucknow
VillageVibhuti Khand
LocalityGomti Nagar, Lucknow
AddressGH Plot no 04, Phase 1, Vibhuti Khand, Gomti Nagar, Lucknow
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units58
Unit Types3
Blocks1
Floors15
Khasra records (1)
- Plot No. GH-4· Plot· 2937 m²
Inventory
Apartments (58 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| TOWER A | GF | 4 BHK | 1 | 149.68 | 1 | — |
| TOWER A | GF | 4 BHK | 1 | 150.51 | 1 | — |
| TOWER A | GF | SHOP | 1 | 32.48 | 0 | — |
| TOWER A | GF | OTHER | 1 | 110.33 | 0 | — |
| TOWER A | 1 | 4 BHK | 1 | 146.57 | 5 | — |
| TOWER A | 1 | 4 BHK | 1 | 145.83 | 5 | — |
| TOWER A | 1 | 4 BHK | 1 | 146.65 | 5 | — |
| TOWER A | 1 | 4 BHK | 1 | 145.73 | 5 | — |
| TOWER A | 2 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 2 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 2 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 2 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 3 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 3 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 3 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 3 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 4 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 4 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 4 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 4 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 5 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 5 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 5 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 5 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 6 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 6 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 6 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 6 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 7 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 7 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 7 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 7 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 8 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 8 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 8 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 8 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 9 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 9 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 9 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 9 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 10 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 10 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 10 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 10 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 11 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 11 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 11 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 11 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 12 | 4 BHK | 1 | 150.52 | 6 | — |
| TOWER A | 12 | 4 BHK | 1 | 149.69 | 6 | — |
| TOWER A | 12 | 4 BHK | 1 | 150.51 | 6 | — |
| TOWER A | 12 | 4 BHK | 1 | 149.68 | 6 | — |
| TOWER A | 13 | OTHER | 1 | 104.07 | 3 | — |
| TOWER A | 13 | OTHER | 1 | 102.93 | 3 | — |
| TOWER A | 13 | 4 BHK | 1 | 191.18 | 6 | — |
| TOWER A | 14 | OTHER | 1 | 103.02 | 5 | — |
| TOWER A | 14 | OTHER | 1 | 104.08 | 4 | — |
| TOWER A | 14 | 4 BHK | 1 | 191.64 | 8 | — |
Permits & Approvals
Permit NoGroup Housing/12470/LDA/BP/24-25/0991/26062024
Permit Date2024-07-15
Valid Until2029-07-14
Extendable Until2032-07-14
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2024-07-17)View
- Commencement Certificate#New(2024-07-17)View
- Proforma of Application Form#New(2024-07-18)View
- Proforma of Allotment Letter#New(2024-07-18)View
- Proforma of Conveyance Deed#New(2024-07-18)View
- Waste Disposal Plan#New(2024-07-17)View
- Water Supply Plan#New(2024-07-17)View
- Electricity Supply Plan#New(2024-07-17)View
- Development Work Plan#New(2024-07-18)View
- Affidavit (Form-B)#New(2024-07-18)View
- CA CERTIFICATE#New(2024-07-19)View
- ARCHITECT CERTIFICATE#New(2024-07-19)View
- ENGINEERS CERTIFICATE#New(2024-07-19)View
- Other#New(2024-07-18)View
- Proforma of Agreement for Sale#New(2024-07-18)View
Land documents
- Registry Document#6742(2023-07-10)View11653877534.pdf
Project Team
Architect Address17-A, First Floor, Jopling Road, Lucknow 226001
Engineer AddressSector-H, B1/53, Aliganj, Lucknow 226004
Developer & Contact
Developer
Promoter NameArpit Yadav
Company TypeIndividual
Mobile9236454212
Emailradicalrealinvestments@gmail.com
Registered Address2/115, Vinay Khand, Gomti Nagar, Lucknow - 226010
Contractor AddressF-2, Rajni Khand, Sharda Nagar, Lucknow - 226002
Bank Accounts
Account Typecollection
Account Number120029857434
Account NameARPIT YADAV YASHARTH VIKRAM COLL AC NRI RETREAT APT
Bank NameCanara Bank
BranchMohanlal Ganj, Lucknow
Branch AddressMishra Bldg Ist Floor Raibareilly Road Mohanlal Ganj, Lucknow
Branch DistrictLucknow
Branch StateSelect
IFSCCNRB0018502
Branch Emailcb18502@canarabank.com
Account Typeseparate
Account Number120029855877
Account NameARPIT YADAV YASHARTH VIKRAM SEP AC NRI RETREAT APT
Bank NameCanara Bank
BranchMohanlal Ganj, Lucknow
Branch AddressMishra Bldg Ist Floor Raibareilly Road Mohanlal Ganj, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCCNRB0018502
Account Typetransaction
Account Number120029742525
Account NameARPIT YADAV YASHARTH VIKRAM TRANS AC NRI RETREAT APT
Bank NameCanara Bank
BranchMohanlal Ganj, Lucknow
Branch AddressMishra Bldg Ist Floor Raibareilly Road Mohanlal Ganj, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCCNRB0018502
Development & Facilities
Development works
Demarcation Of PlotsWe have one plot of size 2937 sq. mtr.having 1 main entrance gate from the 18 m wide front road.
Boundary Wall2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
Road WorkWe will provide R.C.C. road all along the periphery for vehicular traffic.
FootpathsWe will provide 1.5 mtr. Footpath along road.
Water Supply Including Drinking Water FacilitiesTwo boreholes 300 ft. Deep. Water pumped to overhead tanks & supplied to units through gravity. The system will be part and parcel of the UGWST to be provided for fire fighting system.
Sewer SystemSewage & waste water from the units shall be taken through inspection chamber & underground sewer line to the main sewer provided by Development Authority.
DrainStorm Water from hard surfaces at the rate of 100 percent & 20 percent from the green areas shall be used for rain water harvesting & surplus water shall be drained to the network provided by Development Authority.
ParksParks shall be provided at appropriate places with grass & seasonal flowers vertical plantations shall be developed along boundary walls.
Tree PlantingRequired numbers of trees shall be planted along with the boundary wall giving shade to the parked cars.
Design For Electric Supply Including Street LightingElectric supply shall be harnessed from the board. Transformer, HT & LT panels shall be designed with DG back up for all services and units.
Community BuildingsThere is no separate community building as such but community spaces like club, cafeteria, gym, swimming pool etc will be provisioned and will be available to residents on demand.
Treatment And Disposal System Of Sewage And Sullage WaterSewage & waste water from the units shall be taken through inspection chamber & underground sewer line to the main sewer provided by Development Authority.
Solid Waste Management And Disposal SystemSolid waste shall be bagged & collected floor wise. Collected waste shall be taken up to the point of collection from where it shall be taken to the disposal site by the arrangement of Development Authority.
Water Conservation SystemAll appliances provided shall be of low water consumption. Surface drainage shall be taken to first level through rainwater harvesting system.
Energy Management System Including Use Of Renewable EnergyAll equipments to be used in the complex shall be of the low energy consumption. LED lights & solar lights along with solar energy shall be as per government rules.
Fire Protection And Fire Safety SystemAll provision stipulated by NBC-16 shall be followed. Sprinkler system shall be used in basement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesArea shall be marked on ground where people can collect in case of emergency
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)20000
Project Duration (months)60