Omaxe Cassia GH II, Phase I
by Omaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited)
Lucknow, Uttar Pradesh · UPRERAPRJ344049/07/2024
Total units
318
Overview
Registration Date2024-07-10
RERA NumberUPRERAPRJ344049/07/2024
Promoter IDUPRERAPRM5708
Proposed Start2024-07-08
Proposed Completion2029-04-08
Location
DistrictLucknow
TehsilSarojini Nagar
VillageKalli Paschim
AddressGroup Housing II, Omaxe Metro City, Lucknow U.P.
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units318
Unit Types2
Blocks4
Floors13
Khasra records (6)
Show all 6 khasra rows
- 629· Khasra· 5600 m²
- 630· Khasra· 520 m²
- 2291· Khasra· 150 m²
- 2293· Khasra· 400 m²
- 2294· Khasra· 4920 m²
- 2292· Khasra· 1891 m²
Inventory
Apartments (159 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Tower - 3 | GF | 3 BHK | 2 | 106 | 4 | — |
| Tower - 3 | GF | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | GF | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | GF | 3 BHK | 2 | 106 | 4 | — |
| Tower - 3 | 1 | 3 BHK | 2 | 106 | 4 | — |
| Tower - 3 | 1 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 1 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 1 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 2 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 2 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 2 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 2 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 3 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 3 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 3 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 3 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 4 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 4 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 4 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 4 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 5 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 5 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 5 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 5 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 6 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 6 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 6 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 6 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 7 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 7 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 7 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 7 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 8 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 8 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 8 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 8 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 9 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 9 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 9 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 9 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 10 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 10 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 10 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 10 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 11 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 11 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 11 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 11 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 12 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 3 | 12 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 12 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 3 | 12 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | GF | 3 BHK | 2 | 106 | 4 | — |
| Tower - 4 | GF | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | GF | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | GF | 3 BHK | 2 | 106 | 4 | — |
| Tower - 4 | 1 | 3 BHK | 2 | 106 | 4 | — |
| Tower - 4 | 1 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 1 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 1 | 3 BHK | 2 | 106 | 4 | — |
| Tower - 4 | 2 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 2 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 2 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 2 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 3 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 3 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 3 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 3 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 4 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 4 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 4 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 4 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 5 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 5 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 5 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 5 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 6 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 6 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 6 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 6 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 7 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 7 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 7 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 7 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 8 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 8 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 8 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 8 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 8 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 9 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 9 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 9 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 9 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 10 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 10 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 10 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 10 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 11 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 11 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 11 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 11 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 12 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 12 | 3 BHK | 2 | 116 | 4 | — |
| Tower - 4 | 12 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 4 | 12 | 3 BHK | 2 | 107 | 4 | — |
| Tower - 5 | 1 | 2 BHK | 2 | 62 | 1 | — |
| Tower - 5 | 1 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | GF | 2 BHK | 2 | 62 | 1 | — |
| Tower - 5 | GF | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 2 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 2 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 3 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 3 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 4 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 4 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 5 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 5 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 6 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 6 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 7 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 7 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 8 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 8 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 8 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 9 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 9 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 10 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 10 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 11 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 11 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 5 | 12 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 5 | 12 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | GF | 2 BHK | 2 | 62 | 1 | — |
| Tower - 6 | GF | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 1 | 2 BHK | 2 | 62 | 1 | — |
| Tower - 6 | 1 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 2 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 2 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 3 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 3 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 4 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 4 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 5 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 5 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 6 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 6 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 7 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 7 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 7 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 8 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 8 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 9 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 9 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 10 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 10 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 11 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 11 | 2 BHK | 2 | 85 | 1 | — |
| Tower - 6 | 12 | 2 BHK | 2 | 82 | 2 | — |
| Tower - 6 | 12 | 2 BHK | 2 | 85 | 1 | — |
Permits & Approvals
Permit NoLDA/BP/23-24/4232/26022024
Permit Date2024-04-09
Valid Until2029-04-08
Extendable Until2032-04-07
Documents
Filing documents
- Proforma of Application Form
- Proforma of Allotment Letter
- Proforma of Conveyance Deed
- Proforma of Completion Certificate(Occupancy)
- Affidavit (Form-B)
- CA CERTIFICATE
- ARCHITECT CERTIFICATE
- ENGINEERS CERTIFICATE
- ENGINEERS CERTIFICATE
- ENGINEERS CERTIFICATE
- ENGINEERS CERTIFICATE
- ENGINEERS CERTIFICATE
- Other
- Proforma of Agreement for Sale
- Details of Encumbrances#New(2024-05-27)View
- Commencement Certificate#New(2024-05-27)View
- Other Plan(If Any)#New(2024-05-27)View
- Proforma of Application Form#New(2024-06-21)View
- Proforma of Allotment Letter#New(2024-06-21)View
- Proforma of Conveyance Deed#New(2024-06-21)View
- Waste Disposal Plan#New(2024-05-27)View
- Water Supply Plan#New(2024-05-27)View
- Electricity Supply Plan#New(2024-05-27)View
- Development Work Plan#New(2024-05-24)View
- Affidavit (Form-B)#New(2024-06-21)View
- CA CERTIFICATE#New(2024-06-25)View
- ARCHITECT CERTIFICATE#New(2024-05-28)View
- ENGINEERS CERTIFICATE#New(2024-06-26)View
- Other#New(2024-06-21)View
- Proforma of Agreement for Sale#New(2024-06-21)View
Land documents
- Sale Deed#15315(2012-08-16)View10788787283.pdf
- Sale Deed#10504(2013-06-07)View10788782610.pdf
- Sale Deed#13060(2013-07-11)View10788786575.pdf
- Sale Deed#14356(2013-07-27)View10788787078.pdf
- Sale Deed#9096(2015-05-12)View10788786942.pdf
- Extract of Khatauni#1429-1432(1900-01-01)View10788788694.pdf
- Extract of Khatauni#1429-1434(1900-01-01)View10788781064.pdf
- Extract of Khatauni#1429-1434(1900-01-01)View10788783571.pdf
- Extract of Khatauni#1429-1434(1900-01-01)View10788789834.pdf
- Extract of Khatauni#1429-1434(1900-01-01)View10788783152.pdf
- Extract of Khatauni#1429-1434 (630,2291)(1900-01-01)View10788787193.pdf
- Sale Deed#6787(2012-04-10)View10788781210.pdf
- Lease Deed#8611(2011-06-15)View10788787708.pdf
- Extract of Khatauni#1429-1432(1900-01-01)View10788786041.pdf
- Extract of Khatauni#1429-1432(1900-01-01)View10788788728.pdf
Project Team
Architect Address10, LSC, Kalka ji, New Delhi
Engineer AddressI-1738, Lower Ground Floor, CR park New Delhi-19
Developer & Contact
Developer
Promoter NameOmaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited)
Promoter Address10, Local Shopping Centre, Kalkaji, New Delhi - 110019, Delhi, INDIA
Company TypeCompany
Mobile8795333302
Emailgarv@omaxe.com
Registered Address10, Local Shopping Centre, Kalkaji, New Delhi - 110019, Delhi, INDIA
Contractor Address10 LSC, Kalkaji, New Delhi
Bank Accounts
Account Typecollection
Account Number0277102000010645
Account NameOMAXE GARV COLLECTION ACCOUNT GH-2 OMAXE CASSIA PH-1
Bank NameIDBI BANK
BranchIDBI BANK, INDIRA NAGAR
Branch AddressIDBI BANK, INDIRA NAGAR LUCKNOW
Branch DistrictLucknow
Branch StateSelect
IFSCIBKL0000277
Branch Emailibkl0000277@idbi.co.in
Account Typeseparate
Account Number0277102000010627
Account NameOMAXE GARV SEPARATE ACCOUNT GH-2 OMAXE CASSIA PH-1
Bank NameIDBI BANK
BranchIDBI BANK, INDIRA NAGAR
Branch AddressIDBI BANK, INDIRA NAGAR, LUCKNOW
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCIBKL0000277
Account Typetransaction
Account Number0277102000010636
Account NameOMAXE GARV RERA TRANSACTION ACCOUNT GH-2 OMAXE CASSIA PH-1
Bank NameIDBI BANK
BranchIDBI BANK, INDIRA NAGAR
Branch AddressIDBI BANK, INDIRA NAGAR, LUCKNOW
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCIBKL0000277
Development & Facilities
Development works
Demarcation Of PlotsDemarcation of project to be done at site.
Boundary WallBoundary wall will be constructed by brick work/MS railing as per requirement and designed by promoter.
Road WorkInternal drive way 6 mtr wide, will be developed by RCC/Interlocking paver/Bitumen as per approved layout, as per requiremet and designed by promoter.
FootpathsBoth side of road, Footpath will be developed, width 1.0 to 1.5 mtr, as per requirement and designed by promoter.
Water Supply Including Drinking Water FacilitiesWater supply including drinking water facilities will be provided by promoter through roof tank/bore well.
Sewer SystemCommon S.T.P will be constructed by promoter, for GH-2, at site for Sewer disposal.
DrainDrainage system will be developed and connected with RWH over flow will be connected with Exiting Drains.
ParksCommon parks/green area approx 2300 sqm will be planted in GH-2 within parks, road side and boundary, as per requirment and norms.
Tree PlantingRequired Tree approx 100-120 nos, will be planted in GH-2 within parks, road side and boundary, as per requirement and norms.
Design For Electric Supply Including Street LightingCommon ESS developed for metrocity township. electric supply will be provided from ESS. Street light wil be fixed at road berms as per requirement and design.
Community BuildingsCommon community building as per approved layout, will be provided for GH-2
Treatment And Disposal System Of Sewage And Sullage WaterS.T.P will be constructed for GH-2, and treated water will be use in Irrigation of green areas and as per Govt. norms.
Solid Waste Management And Disposal SystemSolid waste management and disposal system will be provided as per requirement and Govt. norms
Water Conservation Systemwater conservation system will be provided as per Govt. Norms
Energy Management System Including Use Of Renewable EnergyEnergy management system will be provided as per Govt. Norms
Fire Protection And Fire Safety SystemFire safety system will be provided as per approval, design Norms
Social Infrastructure And Other Public Amenities Including Public Health ServicesN/A
Emergency Evacuation ServicesAs per Norms
Other Miscellaneous WorkAs per specification finalize by approved map all works will be developed.
Financials
Registration Fee (₹)72500
Project Duration (months)58