Registered
Total units
152
Overview
Registration Date2022-06-15
RERA NumberUPRERAPRJ249398
Promoter IDUPRERAPRM165554
Proposed Start2022-04-13
Proposed Completion2027-04-12
Location
DistrictGhaziabad
TehsilGhaziabad
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units152
Unit Types1
Blocks1
Floors5
Khasra records (3)
- 7C/ COM- 09· Plot· 72048 m²
- 7C/ COM-10· Plot· 58014 m²
- 7C/ COM- 11· Plot· 71834 m²
Inventory
Apartments (39 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Opus | BSMNT | SHOP | 2 | 24.66 | 0 | — |
| Opus | BSMNT | SHOP | 2 | 5.13 | 0 | — |
| Opus | BSMNT | SHOP | 4 | 15.5 | 0 | — |
| Opus | BSMNT | SHOP | 2 | 15.96 | 0 | — |
| Opus | BSMNT | SHOP | 2 | 16.77 | 0 | — |
| Opus | BSMNT | SHOP | 4 | 18.29 | 0 | — |
| Opus | BSMNT | SHOP | 4 | 16.95 | 0 | — |
| Opus | BSMNT | SHOP | 2 | 18.53 | 0 | — |
| Opus | BSMNT | SHOP | 4 | 20.22 | 0 | — |
| Opus | BSMNT | SHOP | 8 | 18.45 | 0 | — |
| Opus | GF | SHOP | 2 | 24.66 | 0 | — |
| Opus | GF | SHOP | 6 | 16.77 | 0 | — |
| Opus | GF | SHOP | 6 | 16.63 | 0 | — |
| Opus | GF | SHOP | 12 | 16.95 | 0 | — |
| Opus | GF | SHOP | 2 | 5.13 | 0 | — |
| Opus | GF | SHOP | 4 | 15.5 | 0 | — |
| Opus | GF | SHOP | 2 | 15.96 | 0 | — |
| Opus | 1 | SHOP | 2 | 10.15 | 0 | — |
| Opus | 1 | SHOP | 2 | 13.68 | 0 | — |
| Opus | 1 | SHOP | 2 | 5.13 | 0 | — |
| Opus | 1 | SHOP | 4 | 15.5 | 0 | — |
| Opus | 1 | SHOP | 2 | 15.96 | 0 | — |
| Opus | 1 | SHOP | 6 | 16.77 | 0 | — |
| Opus | 1 | SHOP | 6 | 16.63 | 0 | — |
| Opus | 1 | SHOP | 12 | 16.95 | 0 | — |
| Opus | 2 | SHOP | 2 | 10.15 | 0 | — |
| Opus | 2 | SHOP | 2 | 13.68 | 0 | — |
| Opus | 2 | SHOP | 2 | 5.13 | 0 | — |
| Opus | 2 | SHOP | 4 | 15.5 | 0 | — |
| Opus | 2 | SHOP | 2 | 15.96 | 0 | — |
| Opus | 2 | SHOP | 6 | 16.77 | 0 | — |
| Opus | 2 | SHOP | 6 | 16.63 | 0 | — |
| Opus | 2 | SHOP | 12 | 16.95 | 0 | — |
| Opus | 3 | SHOP | 4 | 9.86 | 0 | — |
| Opus | 3 | SHOP | 2 | 10.17 | 0 | — |
| Opus | 3 | SHOP | 2 | 31.86 | 0 | — |
| Opus | 3 | SHOP | 1 | 43.05 | 0 | — |
| Opus | 3 | SHOP | 2 | 18.6 | 0 | — |
| Opus | 3 | SHOP | 1 | 21.06 | 0 | — |
Permits & Approvals
Permit NoRetail Shop/03667/UPAVP/BP/21-22/1644/24032022
Permit Date2022-04-13
Valid Until2027-04-12
Extendable Until2030-04-12
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2022-04-28)View
- Commencement Certificate#New(2022-04-28)View
- Proforma of Application Form#New(2022-05-20)View
- Proforma of Allotment Letter#New(2022-05-20)View
- Proforma of Conveyance Deed#New(2022-04-28)View
- Waste Disposal Plan#New(2022-04-28)View
- Water Supply Plan#New(2022-05-21)View
- Electricity Supply Plan#New(2022-04-28)View
- Development Work Plan#New(2022-04-28)View
- Affidavit (Form-B)#New(2022-04-28)View
- CA CERTIFICATE#New(2022-04-28)View
- ARCHITECT CERTIFICATE#New(2022-04-28)View
- ENGINEERS CERTIFICATE#New(2022-04-28)View
- Other#New(2022-04-28)View
Project Team
Architect AddressP-129, Sector 39, Gurugram, Haryana
Engineer AddressRDA Civil Engineering Systems Private Limited, N-43, Srinivas Puri, New Delhi, 110065
Developer & Contact
Developer
Promoter NameJindalsons Infratex Pvt. Ltd.
Promoter Address08 CSC, Vigyaan Vihar Delhi - 110092
Company TypeCompany
Mobile9999129995
Emailinfo.jindalsonsinfratex@gmail.com
Registered Address08 CSC, Vigyaan Vihar Delhi - 110092
Contractor AddressGround Floor, 13, Indira Nagar, Meerut, Uttar Pradesh, 250002
Bank Accounts
Account Typecollection
Account Number922020016518477
Account NameJindalsons Infratex Private Limited Collection Account for Opus
Bank NameAxis Bank
BranchSahibabad
Branch AddressSahibabad, Ghaziabad
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCUTIB0001263
Account Typeseparate
Account Number922020018589334
Account NameJindalson Infratex Private Limited RERA Account for Opus
Bank NameAxis Bank
BranchSahibabad
Branch AddressSahibabad, Ghaziabad
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCUTIB0001263
Account Typetransaction
Account Number922020027052278
Account NameJindalsons Infratex Private Limited - Transaction account for Opus
Bank NameAxis Bank
BranchSahibabad
Branch AddressSahibabad, Ghaziabad
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCUTIB0001263
Development & Facilities
Development works
Demarcation Of PlotsPlot Nos. Comm. 9,10 and 11, Sector 11, Siddhath Vihar, Ghaziabad allotted by Uttar Pradesh Awas Evam Vikas Parishad. Having plot size of 720.48 sq.m, 580.14 sq m. and 718.34 sq.m respectively (total 2018.96 sq.m.). The composite plot bounded on the three sides by road and one side by other property.
Boundary WallOnly rear side boundary wall 1.8 meters high with brick of 150 mm thickness and plaster between two R.C.C columns approximately 4.5 meters centre to centre. Length of boundary wall shall be 66.84 meter. The boundary wall shall be earthquake resistant.
Road WorkAll roads in the complex will be in combination of concrete pavers of different colours, shape and thickness. 60 mm thick pavers will be laid over 50 mm sand with 200 mm WMM.
FootpathsAll footpaths in the complex will be in combination of concrete/ granite pavers of different colours, shape and thickness of 60 mm and 80 mm. 60 mm thick pavers will be laid over 50 mm sand with 200m mm WMM.
Water Supply Including Drinking Water FacilitiesProvided central water supply for all required areas as given in the drawing. Water supply shall be given by the Municipal Authority. Water supply received in under ground tank of 24 KL capacity and pumped to overhead tank of 15 KL capacity from where it will be distributed.
Sewer SystemThe sewage will be collected through a soil pipeline (size 400 to 200 mm) arrangements, bends and inspection chambers leading to the municipal sewage line.
DrainRain water shall be collected in drains connected to the underground cement concrete pipeline of size 400 to 200 mm. For discharge, water will be collected in manholes to be constructed in periphery of building block and these manholes are connected with 01. no of ground water recharge pits. Over flow water will be connected with the drain of local Authority.
ParksNot Applicable
Tree PlantingThe trees (24 no.) will be planted at all suitable locations of the Project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage in the Project.
Design For Electric Supply Including Street Lighting11 KVA Electricity supply provided through 11 KW/ 0.415 KV transformers provide 1 no. DG set of 380 KVA and another is 250 KVA, 415 Volts with accostic incloser for stand by power supply. External street lighting shall be provided as per building norms.
Community BuildingsNot Applicable
Treatment And Disposal System Of Sewage And Sullage WaterSewage shall be treated in sewage treatment plant (STP) and thereafter treated water to be used for flushing and irrigation.
Solid Waste Management And Disposal SystemDedicated garbage sorting and disposal area is planned in the building premises for 100 kg per day. Non recyclable waste shall be disposed of through the vendors approved by local authority.
Water Conservation SystemRain water harvesting pits (01 nos) shall be provided for ground water recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing. Each water harvesting pit shall be of (2M x 6M) dimesions.
Energy Management System Including Use Of Renewable EnergyAll high side equipment are proposed very energy efficient, LED lights shall be provided.
Fire Protection And Fire Safety SystemFire Fighting system shall be provided for building as per the prevailing requirements of the National Building Code. Fire doors shall be provided in common areas. Water supply to sprinklers and hydrants shall be from over head fire water tank located on terrace.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPublic sitting, toilets ( 1 no. for female and 1 no. for Differently abled person toilet for each floor) and drinking water facility (1 nos) has been planned and provisioned in common areas.
Emergency Evacuation ServicesEmergency evacuation system complying to NBC norms is being installed in complete premises, (1 no.) Fire staircase and 1 common staircase shall be provided as per the approved fire drawing for evacuation to open areas.
Other Miscellaneous WorkNot Applicable.
Financials
Registration Fee (₹)31000
Project Duration (months)60