Overview
Registration Date2026-01-28
RERA NumberUPRERAPRJ819615/01/2026
Promoter IDUPRERAPRM162275
Proposed Start2022-01-01
Proposed Completion2026-10-31
Location
DistrictGautam Buddha Nagar
TehsilGautam Buddha Nagar
VillageSECTOR-128
LocalityNOIDA
AddressB-56
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units30
Unit Types2
Blocks1
Floors10
Khasra records (1)
- B-56, SECTOR-128, NOIDA· Plot· 4028 m²
Inventory
Apartments (32 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| A | BSMNT | OTHER | 0 | 0 | 0 | — |
| A | GF | OTHER | 0 | 0 | 0 | — |
| A | 1 | 4 BHK | 1 | 223.03 | 6 | — |
| A | 1 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 1 | 4 BHK | 1 | 229.49 | 6 | — |
| A | 1 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 2 | 4 BHK | 1 | 223.03 | 6 | — |
| A | 2 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 2 | 4 BHK | 1 | 229.49 | 6 | — |
| A | 2 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 3 | 4 BHK | 1 | 223.03 | 6 | — |
| A | 3 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 3 | 4 BHK | 1 | 229.49 | 6 | — |
| A | 3 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 4 | 4 BHK | 1 | 223.03 | 6 | — |
| A | 4 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 4 | 4 BHK | 1 | 229.49 | 6 | — |
| A | 4 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 5 | 4 BHK | 1 | 223.02 | 6 | — |
| A | 5 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 5 | 4 BHK | 1 | 229.49 | 6 | — |
| A | 5 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 6 | 4 BHK | 1 | 223.03 | 6 | — |
| A | 6 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 6 | 4 BHK | 1 | 229.49 | 6 | — |
| A | 6 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 7 | 4 BHK | 1 | 223.03 | 6 | — |
| A | 7 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 7 | 4 BHK | 1 | 229.49 | 6 | — |
| A | 7 | 4 BHK | 1 | 179.25 | 3 | — |
| A | 8 | 4 BHK | 1 | 249.09 | 1 | — |
| A | 8 | 4 BHK | 1 | 249.09 | 1 | — |
Permits & Approvals
Permit No2021/04/07/4285
Permit Date2021-11-25
Valid Until2026-11-24
Extendable Until2029-11-23
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2025-11-18)View
- Commencement Certificate#New(2025-10-13)View
- Other Plan(If Any)#New(2025-11-18)View
- Proforma of Application Form#New(2025-10-13)View
- Proforma of Allotment Letter#New(2025-10-13)View
- Proforma of Conveyance Deed#New(2025-10-13)View
- Waste Disposal Plan#New(2025-10-13)View
- Water Supply Plan#New(2025-10-13)View
- Electricity Supply Plan#New(2025-10-13)View
- Development Work Plan#New(2025-10-13)View
- Affidavit (Form-B)#New(2025-10-13)View
- CA CERTIFICATE#New(2025-10-13)View
- ARCHITECT CERTIFICATE#New(2025-10-13)View
- ENGINEERS CERTIFICATE#New(2025-10-13)View
- Other#New(2025-10-13)View
- Proforma of Agreement for Sale#New(2025-10-13)View
Project Team
Architect AddressF-1, FIRST FLOOR, MIRA CORPORATE SUITES, ISHWAR NAGAR, DELHI-110065
Engineer Address503, SACHDEVA CORPORATE TOWER, SECTOR-08, ROHINI, DELHI-110085
Developer & Contact
Developer
Promoter NamePAGE3 BUILDTECH PRIVATE LIMITED
Promoter AddressA2/0701, 7TH Floor, Tower- Aspire- 2, Supertech Emarald Court, Noida Sector 93A Noida Gautam Buddha Nagar UP 201301 IN
Company TypeCompany
Mobile8860093611
Emailinfopage3noida@homeandsoul.in
Registered AddressA2/0701, 7TH Floor, Tower- Aspire- 2, Supertech Emarald Court, Noida Sector 93A Noida Gautam Buddha Nagar UP 201301 IN
Contractor AddressSHAKTI KHAN III/50/1 GF, INDIRAPURAM, GHAZIABAD, U.P.-201011I
Bank Accounts
Account Typecollection
Account Number10246937211
Account NamePAGE3 BUILDTECH PVT LTD COLLECTION A/C FOR PAGE3 NOIDA
Bank NameIDFC FIRST BANK
BranchNOIDA SECTOR 144
Branch AddressGROUND FLOOR, UNIT NO.106 & 107, TOWER-A, GULSHAN DYNASTY, PLOT NO. GH-03-D, SECTOR-144, NOIDA G B NAGAR, U.P.
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCIDFB0021336
Branch Emailnoida.sc144.21336@idfcfirstbank.com
Account Typeseparate
Account Number50015111113
Account NamePAGE3 BUILDTECH PVT LTD SEPARATE BANK A/C FOR PAGE3 NOIDA
Bank NameIDFC FIRST BANK LIMITED
BranchNOIDA SECTOR 144
Branch AddressGROUND FLOOR, UNIT NO. 106, 107, TOWER-A, GULSHAN DYNASTY, PLOT NO. GH-03-D, SECTOR-144, NOIDA, G B NAGAR, U.P.
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCIDFB0021336
Account Typetransaction
Account Number10246937222
Account NamePAGE3 BUILDTECH PVT LTD RERA TRANSACTION BANK AC PAGE3 NOIDA
Bank NameIDFC FIRST BANK LIMITED
BranchNOIDA SECTOR 144
Branch AddressGROUND FLOOR, UNIT NO. 106,107, TOWER-A, GULSHAN DYNASTY, PLOT NO.GH-03-D, SECTOR-144, NOIDA, G B NAGAR, U.P.
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCIDFB0021336
Development & Facilities
Development works
Demarcation Of PlotsNumbers of plots -1, size per plot- 4028 Sqm, total area demarcated; method of demarcation, survey accuracy- As Per Site Plan and Possession Plan
Boundary WallLength- 226 mtr, height- 7mtr+, material used; type (brick, RCC, fencing) - RCC and MS FENCE, apperance- Stonewall, safety features- CCTV and Additional Height of MS Fence
Road WorkTotal road length- 57 mtr and Motorable Green and width- 6 mtr -7.5 mtr, number of lanes- 1 and 2 on the Ramp/Road in Slope; type of pavement- PAVERS, drainage- As per Fire Tender Movement
FootpathsLength- 160 mtr, width- 1.35m, number of crossings- None; material used- Stone and Pavers, accessibility- Ramp, safety design- Compilance with Safety Standards
Water Supply Including Drinking Water FacilitiesNumber of water connections- 2 (Treatment Water + Domestic), tank capicity- UGT (215 KL including Fire Tank) + Overhead Tank (33 KL including Fire, Flushing and Domestic), hydrants Yard hydrants (5 nos); source of water- Township, treatment method- Township STP will be used for Treatment, compilance with quality standards - YES
Sewer SystemLength of sewer lines- 25 mtr External, pipe size- 250mm dia, manholes- 3; type (gravity/pressure) - Gravity, material used- DWC HDPE Pipes, network design- Piping Design Network connected to External Sewerage System of Township
DrainLength- 480 MTR [Storm Drain 280 running meter and Surface Drain 200 running mtr], width- 150mm and 250mm dia pipe in External Storm Drain and Internal 160mm dia, number of open/covered drains- ALL COVERED DRAINS; type (storm/surface)- BOTH - Storm Drain in External Area and Surface Drain in Basement, material- STORM in Brickworks with waterproofing and Surface in RCC with Tiling, disposal method- RWH and Drain Connecting to Township
ParksArea- 1102 sqm, number of parks- 3, number of trees/plants- 32; landscaping features- Water Body, Gezebo, Green wall, types od parks- Childrens Park, Celebration lawn, Gazebo Park, public amenities- Swings, Seating Area, Lighting
Tree PlantingNumber of trees- 32, type/species, spacing; native/exotic trees - Mainly Native with a couple of Exotic Trees, maintenance plan- Gardening AMC- (Details As per Landscape Plan)
Design For Electric Supply Including Street LightingNumber of poles- 21, lights- 180 approx, tranformer units- 2; type of lighting (LED/solar) - LED, illumination design- Bollard, Street Poles, Uplighter and Wall washer Lights.
Community BuildingsNo- Ground Floor of Tower Area , area per building- 1024 sqm, capicity; purpose- Club/Community Centre and Lift Lobby for Towers, construction type- RCC (Ground floor of Tower Area) , facilities Gymnasium, Cafetaria, Indoor Games, Soft Play Area, Swimming Pool and Health Spa
Treatment And Disposal System Of Sewage And Sullage WaterSTP capacity (KLD), number of treatment units; type of STP, treated water use, regulatory compilance- WILL BE USING OF TOWNSHIP
Solid Waste Management And Disposal SystemEstimated waste (kg/day) , number of bins/collection points- 30; segregation- Inside Flat, composting/recycling- Encouraging Residents, collection method- Conventional
Water Conservation SystemNumber and size of harvesting pits- , recharge wells; water-efficient fixtures, reuse/recharge strategy, system efficiency. - Independent Rainwater collecting System from roofs/terrace/balconies and connecting to Township
Energy Management System Including Use Of Renewable Energy(Renewable Energy) Solar capacity (kW) , number of pannels; type of renewable energy used, grid integration, backup provision - 1 Percent of TOTAL DEMAND LOAD SHALL BE GENERATED AND FED BY SOLAR PV SYSTEM as per ENVIORNMENT MANDATORY REQUIREMENT
Fire Protection And Fire Safety SystemNumber of hydrants - 5 , fire exits- 2 (One in each Tower), sprinklers- Automatic Sprinkler System in Basement; system type (manual/automatic)- AUTOMATIC, NBC compilance- YES, fir safety training - YES
Social Infrastructure And Other Public Amenities Including Public Health ServicesNumber/area of amenities- 4 toilets (toilets, health units); type of services offered- TOILET, inclusiveness, accessibility.
Emergency Evacuation ServicesNumber of evacuation points- 2, road widths- 6 mtr, signage count; route plan- Escape Route with Emergency Backed up Lighting, safety measures- Hooters, Manual Call Points, Talk Back System with telephone Jacks, public awareness system- Signages, Drills and Regular Updates.
Other Miscellaneous WorkWork based on the nature of work (e.g., number of CCTV units, benches); beautification efforts, signage, aesthetic and utility elements - CCTV- 40 approx; Benches, Water Body along Front Tower Profile to enhance beauty of Landscape, Aesthetic Lighting, Green wall with Creepers/Climbers to enrich the Boundary wall.
Financials
Registration Fee (₹)25500
Project Duration (months)58