Park View - The Park 33
by Vinayakkripa Abhaydata Ventures LLP
Prayagraj, Uttar Pradesh · UPRERAPRJ995416
Total units
65
Overview
Registration Date2021-12-09
RERA NumberUPRERAPRJ995416
Promoter IDUPRERAPRM156617
Proposed Start2021-11-01
Proposed Completion2026-08-31
Location
DistrictPrayagraj
TehsilAllahabad **
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units65
Unit Types5
Blocks2
Floors13
Khasra records (1)
- 59/103, Dayanand Marg (Thornhill road), Allahabad· Plot· 6105 m²
Inventory
Apartments (67 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| A | GF | OTHER | 0 | 0 | 0 | — |
| A | 1 | 3 BHK | 1 | 172.85 | 2 | — |
| A | 1 | 3 BHK | 1 | 172.04 | 2 | — |
| A | 2 | 3 BHK | 1 | 176.14 | 4 | — |
| A | 2 | 3 BHK | 1 | 175.34 | 4 | — |
| A | 3 | 3 BHK | 1 | 176.14 | 4 | — |
| A | 3 | 3 BHK | 1 | 175.34 | 4 | — |
| A | 4 | 3 BHK | 1 | 176.14 | 4 | — |
| A | 4 | 3 BHK | 1 | 175.34 | 4 | — |
| A | 5 | 4 BHK | 1 | 362.71 | 7 | — |
| B | GF | OTHER | 0 | 0 | 0 | — |
| B | 1 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 1 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 1 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 1 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 1 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 2 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 2 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 2 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 2 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 2 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 3 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 3 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 3 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 3 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 3 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 4 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 4 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 4 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 4 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 4 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 5 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 5 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 5 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 5 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 5 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 6 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 6 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 6 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 6 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 6 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 7 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 7 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 7 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 7 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 7 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 8 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 8 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 8 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 8 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 8 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 9 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 9 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 9 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 9 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 9 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 10 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 10 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 10 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 10 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 10 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 11 | 5 BHK | 1 | 284.55 | 5 | — |
| B | 11 | 3 BHK | 1 | 165.26 | 6 | — |
| B | 11 | 2 BHK | 1 | 137.85 | 4 | — |
| B | 11 | 2 BHK | 1 | 141.19 | 4 | — |
| B | 11 | 4 BHK | 1 | 238.73 | 7 | — |
| B | 12 | 4 BHK | 1 | 395.27 | 0 | — |
Permits & Approvals
Permit NoGroup housing/00813/PDA/BP/21-22/0178/01092021
Permit Date2021-10-27
Valid Until2026-10-26
Extendable Until2029-10-26
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2021-11-25)View
- Commencement Certificate#New(2021-11-25)View
- Other Plan(If Any)#New(2021-11-25)View
- Proforma of Application Form#New(2021-11-25)View
- Proforma of Allotment Letter#New(2021-11-25)View
- Proforma of Conveyance Deed#New(2021-11-25)View
- Waste Disposal Plan#New(2021-11-25)View
- Water Supply Plan#New(2021-11-25)View
- Electricity Supply Plan#New(2021-11-25)View
- Development Work Plan#New(2021-11-25)View
- Affidavit (Form-B)#New(2021-11-25)View
- CA CERTIFICATE#New(2021-11-25)View
- ARCHITECT CERTIFICATE#New(2021-11-25)View
- ENGINEERS CERTIFICATE#New(2021-11-25)View
Project Team
Architect Address216, ASHIRWAD COMPLEX, 2ND FLOOR, SECTOR 53, NOIDA (U.P.) 201301
Engineer AddressB-501, SETHI, MAX ROYAL, SECTOR-76, NOIDA, UTTAR PRADESH (201301)
Developer & Contact
Developer
Promoter NameVinayakkripa Abhaydata Ventures LLP
Promoter AddressHouse No. 265/316, Old Katra, Prayagraj Allahabad UP 211002 IN
Company TypePartnership Firm
Mobile7408111222
Emailalankar_tandon@hotmail.com
Registered AddressHouse No. 265/316, Old Katra, Prayagraj Allahabad UP 211002 IN
Contractor AddressC-5 PUSHPENDRA APARTMENTS, ELGIN ROAD PRAYAGRAJ 211001
Bank Accounts
Account Typecollection
Account Number13920200013922
Account NameVINAYAKKRIPA ABHAYDATA VENTURES LLP- COLLECTION A/C FOR PARK VIEW
Bank NameTHE FEDERAL BANK LIMITED
BranchPRAYAGRAJ BRANCH
Branch AddressPRAYAGRAJ BRANCH
Branch DistrictPrayagraj
IFSCFDRL0001392
Account Typeseparate
Account Number13920200013930
Account NameVINAYAKKRIPA ABHAYDATA VENTURES LLP- SEPARATE BANK A/C FOR PARK VIEW
Bank NameTHE FEDERAL BANK LIMITED
BranchPRAYAGRAJ BRANCH
Branch AddressPRAYAGRAJ BRANCH
Branch DistrictPrayagraj
IFSCFDRL0001392
Account Typetransaction
Account Number13920200013948
Account NameVINAYAKKRIPA ABHAYDATA VENTURES LLP- RERA TRANSACTION A/C FOR PARK VIEW
Bank NameTHE FEDERAL BANK LIMITED
BranchPRAYAGRAJ BRANCH
Branch AddressPRAYAGRAJ BRANCH
Branch DistrictPrayagraj
IFSCFDRL0001392
Development & Facilities
Development works
Demarcation Of PlotsThe proposed development is a housing scheme therefore no demarcation of plot is required.
Boundary WallBoundary wall shall be RCC framed with brick and electrical work to secure all site and shall be as per municipal building bye laws.
Road WorkRoad work shall be tremix along with hardscape with appropriate slope and drainage works.
FootpathsIt shall be done on the eastern and southern side of Block b. it would be approximately 4"-0" wide to be done in tiles and tremix.
Water Supply Including Drinking Water FacilitiesWater supply shall be stored in domestic water tank in basement and shall be pumped to the overhead tanks. the portable water shall then be supplied to all residential units by gravity.
Sewer SystemThe sewerage shall be done underground RCC pipes connected with manholes at appropriate locations and it shall be deposited off to municipal sewer.
DrainSite drainage shall be done via drains all the road side. the terrace water shall be drained to the rain water harvesting system and excess of it shall be drained along with site drainage
Parks11.71 percentage green at 715.38 sq. mt. has been proposed.
Tree Planting36 no. of trees shall be placed as required by building bye laws.
Design For Electric Supply Including Street LightingElectric supply shall be done via cable from main supply. a transformer along with meter room and DC has been proposed in the site layout.
Community BuildingsCommunity building with an area of 307.97 sq. mt. has been proposed.
Treatment And Disposal System Of Sewage And Sullage WaterSeweage and waste water shall be disposed of the municipal sewer.
Solid Waste Management And Disposal SystemBlock-A block A has 9 flats in 5 floors, 2 flats on 4 floors and a penthouse on the 5th floor. the garbage shall be handpicked from each flat. each flat shall have 2 disposed bins for wet waste and dry waste shall be collected seperately. block-B block B has 56 flats in 12 floors with 5 flats on each floor. a vertical garbage chute is proposed which leads to the garbage collection in the basement. the garbage from the basement shall be collected by municipal corporation. the waste collected from block A and block B shall be disposed off at waste disposal site earmarked for same.
Water Conservation SystemFor water conservation RWH (rain water harvesting system) proposed on site.
Energy Management System Including Use Of Renewable EnergySolar pannels are proposed on roof terrace provided as per building bye laws.
Fire Protection And Fire Safety SystemIt shall be as per NBC 2016
Social Infrastructure And Other Public Amenities Including Public Health ServicesCommunity facilities with isolation room proposed.
Emergency Evacuation ServicesFire escape staircase with fire lifts proposed as per NBC 2016
Other Miscellaneous WorkProposed as per building byelaws and NBC 2016
Financials
Registration Fee (₹)36000
Project Duration (months)58