Registered
Overview
Registration Date2023-09-13
RERA NumberUPRERAPRJ478529
Promoter IDUPRERAPRM245276
Proposed Start2023-03-31
Proposed Completion2028-03-15
Location
DistrictMoradabad
TehsilMoradabad
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Plots21
Khasra records (12)
Show all 12 khasra rows
- 481/1· Khasra· 120 m²
- 309/1· Khasra· 7000 m²
- 309/1· Khasra· 500 m²
- 315/1· Khasra· 3313 m²
- 481/1· Khasra· 190 m²
- 310MI· Khasra· 200 m²
- 288/3· Khasra· 5100 m²
- 288/3· Khasra· 2290 m²
- 312· Khasra· 300 m²
- 310MI· Khasra· 2230 m²
- 309/1· Khasra· 655 m²
- 311MI· Khasra· 600 m²
Inventory
Plots
| Type | Size range | Count |
|---|---|---|
| Plot | Above 500 sqm | 1 |
| Plot | 250 to 500 sqm | 20 |
Permits & Approvals
Permit NoMBDA/LD/22-23/0023
Permit Date2023-03-24
Valid Until2028-03-27
Extendable Until2029-03-26
Documents
Filing documents
- Details of Encumbrances
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Water Supply Plan
- Other
- Details of Encumbrances#New(2023-07-31)View
- Commencement Certificate#New(2023-07-12)View
- Proforma of Application Form#New(2023-07-16)View
- Proforma of Allotment Letter#New(2023-07-16)View
- Proforma of Conveyance Deed#New(2023-07-16)View
- Waste Disposal Plan#New(2023-07-12)View
- Water Supply Plan#New(2023-08-01)View
- Electricity Supply Plan#New(2023-07-12)View
- Development Work Plan#New(2023-07-12)View
- Affidavit (Form-B)#New(2023-07-16)View
- CA CERTIFICATE#New(2023-07-17)View
- ARCHITECT CERTIFICATE#New(2023-07-16)View
- ENGINEERS CERTIFICATE#New(2023-07-16)View
Land documents
- Registry Document#4452(2021-04-17)View8013622318REGISTRYcompressed.pdf
Project Team
Architect AddressPANDIT SHANKAR DUTT SHARMA MARG,,CIVIL LINES,MORADABAD
Engineer AddressCIVIL LINES,MORADABAD
Developer & Contact
Developer
Promoter NameJUPITER LAMINATORS PRIVATE LIMITED
Promoter Address25/33.IIIRD FLOOR,EAST PATELNAGAR NEW DELHI -110008
Company TypeCompany
Mobile9412245317
Emailjupiterlaminators9@gmail.com
Registered Address25/33.IIIRD FLOOR,EAST PATELNAGAR NEW DELHI -110008
Contractor AddressD-14,RAM GANGA VIHAR,PHASE-II,BEHIND MADAN NURSING HOME,MORADABAD
Bank Accounts
Account Typecollection
Account Number923020034348222
Account NameJUPITER LAMINATORS PRIVATE LIMITED COLLECTION ACCOUNT FOR PEARL RESIDENCY
Bank NameAXIS BANK
BranchMORADABAD
Branch AddressKH NO. 431, GROUND,FIRST,SECOND FLR AND BASEMENT,WARD NO. 8,CHAWNI CIVIL LINES,MORADABAD 244001
Branch DistrictMoradabad
Branch StateUttar Pradesh
IFSCUTIB0000282
Account Typeseparate
Account Number923020036862036
Account NameJUPITER LAMINATORS PRIVATE LIMITED SEPARATE BANK ACCOUNT FOR PEARL RESIDENCY
Bank NameAXIS BANK
BranchMORADABAD
Branch AddressKH NO. 431, GR,FIRST, SECOND FLR AND BASEMENT,WARD NO. 8, CHAWNI CIVIL LINES,MORADABAD 244001
Branch DistrictMoradabad
Branch StateUttar Pradesh
IFSCUTIB0000282
Account Typetransaction
Account Number923020034520848
Account NameJUPITER LAMINATORS PRIVATE LIMITED RERA TRANSACTION ACCOUNT FOR PEARL RESIDENCY
Bank NameAXIS BANK
BranchMORADABAD
Branch AddressKH NO. 431,GR,FIRST, SECOND FLR AND BASEMENT, WARD NO. 8, CHAWNI CIVIL LINES,MORADABAD 244001
Branch DistrictMoradabad
Branch StateUttar Pradesh
IFSCUTIB0000282
Development & Facilities
Development works
Demarcation Of PlotsDemarcation will be done as per approved layout . Total no. of plots . are 21 .
Boundary WallBoundary wall is 3 m high, built in 230 mm thick brick work .
Road WorkInternal roads are 12 m wide Road ,and 9 m wide Road .
FootpathsFootpaths are 1.5 m wide .
Water Supply Including Drinking Water FacilitiesWater supply will be provided by developer through pump Room .
Sewer SystemS.T.P ( Sewer Treatment plant ) is proposed by developer . 150 mm - 300 mm diameter sewer pipes are laid on site..
DrainStorm lines have been provided by developer along with Roads . ( 150 - 300 mm ) diameter pipes are laid .
ParksLand has been reserved for park as per Layout .
Tree PlantingTree planting will be done as per along with roads as per layout.
Design For Electric Supply Including Street LightingElectrical substation are proposed by developer for electric supply .
Community BuildingsN/A
Treatment And Disposal System Of Sewage And Sullage WaterSTP system has been proposed by developer for Treatment and disposal system of sewage and sewage water .
Solid Waste Management And Disposal SystemSolid waste Management and Disposal system has been provided by developer as per requirement .
Water Conservation SystemRain water harvesting plants will be constructed on site for water conservation .
Energy Management System Including Use Of Renewable EnergyN/A
Fire Protection And Fire Safety SystemN/A
Social Infrastructure And Other Public Amenities Including Public Health ServicesN/A
Emergency Evacuation ServicesN/A
Other Miscellaneous WorkN/A
Financials
Registration Fee (₹)81500
Project Duration (months)60