PMAY Sector I, Basantkunj Part-B

by Lucknow Development Authority

Lucknow, Uttar Pradesh · UPRERAPRJ131961

Registered

Total units

720

Overview

Registration Date2022-01-06
RERA NumberUPRERAPRJ131961
Promoter IDUPRERAPRM10102
Proposed Start2022-01-01
Proposed Completion2026-08-20

Location

DistrictLucknow
TehsilLucknow
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units720
Unit Types1
Blocks15
Floors4

Khasra records (1)

  • 504, 512, 523, 524, 525.· Khasra· 15982

Inventory

Apartments (60 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
Block 13GF1 BHK1224.721
Block 1311 BHK1224.721
Block 1321 BHK1224.721
Block 1331 BHK1224.721
Block 14GF1 BHK1224.721
Block 1411 BHK1224.721
Block 1421 BHK1224.931
Block 1431 BHK1224.721
Block 15GF1 BHK1224.721
Block 1511 BHK1224.721
Block 1521 BHK1224.721
Block 1531 BHK1224.721
Block 16GF1 BHK1224.721
Block 1611 BHK1224.721
Block 1621 BHK1224.721
Block 1631 BHK1224.721
Block 17GF1 BHK1224.721
Block 1711 BHK1224.721
Block 1721 BHK1224.721
Block 1731 BHK1224.721
Block 18GF1 BHK1224.721
Block 1811 BHK1224.721
Block 1821 BHK1224.721
Block 1831 BHK1224.721
Block 19GF1 BHK1224.721
Block 1911 BHK1224.721
Block 1921 BHK1224.721
Block 1931 BHK1224.721
Block 20GF1 BHK1224.721
Block 2011 BHK1224.721
Block 2021 BHK1224.721
Block 2031 BHK1224.721
Block 21GF1 BHK1224.721
Block 2111 BHK1224.721
Block 2121 BHK1224.721
Block 2131 BHK1224.721
Block 22GF1 BHK1224.721
Block 2211 BHK1224.721
Block 2221 BHK1224.721
Block 2231 BHK1224.721
Block 23GF1 BHK1224.721
Block 2311 BHK1224.721
Block 2321 BHK1224.721
Block 2331 BHK1224.721
Block 24GF1 BHK1224.721
Block 2411 BHK1224.721
Block 2421 BHK1224.721
Block 2431 BHK1224.721
Block 25GF1 BHK1224.721
Block 2511 BHK1224.721
Block 2521 BHK1224.721
Block 2531 BHK1224.721
Block 26GF1 BHK1224.721
Block 2611 BHK1224.721
Block 2621 BHK1224.721
Block 2631 BHK1224.721
Block 47GF1 BHK1224.721
Block 4711 BHK1224.721
Block 4721 BHK1224.721
Block 4731 BHK1224.721

Permits & Approvals

Permit NoFile No.821/Dated- 21-08-2021
Permit Date2021-08-21
Valid Until2026-08-20
Extendable Until2029-08-20

Documents

Filing documents

  • Details of Encumbrances
  • Other Plan(If Any)
  • Waste Disposal Plan
  • Details of Encumbrances#New(2021-12-29)
    View
  • Commencement Certificate#New(2021-12-30)
    View
  • Other Plan(If Any)#New(2021-12-30)
    View
  • Proforma of Application Form#New(2021-11-15)
    View
  • Proforma of Allotment Letter#New(2021-11-15)
    View
  • Proforma of Conveyance Deed#New(2021-11-15)
    View
  • Proforma of Completion Certificate(Occupancy)#New(2021-11-15)
    View
  • Waste Disposal Plan#New(2021-12-30)
    View
  • Water Supply Plan#New(2021-12-30)
    View
  • Electricity Supply Plan#New(2021-12-30)
    View
  • Development Work Plan#New(2021-12-30)
    View
  • Affidavit (Form-B)#New(2021-12-29)
    View
  • CA CERTIFICATE#New(2021-11-22)
    View
  • ARCHITECT CERTIFICATE#New(2021-12-30)
    View
  • ENGINEERS CERTIFICATE#New(2021-11-15)
    View

Land documents

  • Extract of Khatauni#0000(1900-01-01)
    3344026405Goverment Gazette (U P).pdf
    View
  • Extract of Khatauni#1428-1433(1900-01-01)
    3344024052barikala khasra.pdf
    View
  • Extract of Khatauni#1425-1430(1900-01-01)
    3344027205baeawankhurd khasra.pdf
    View

Project Team

Architect AddressPradhikaran Bhawan Vipinkhand Gomtinagar Lucknow
Engineer AddressPradhikaran Bhawan Vipinkhand Gomtinagar Lucknow

Developer & Contact

Developer

Promoter NameLucknow Development Authority
Promoter AddressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Company TypeCompetent authority
Mobile9918005512
Emailvicechairmanlda@gmail.com
Registered AddressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Contractor AddressPradhikaran Bhawan Vipinkhand Gomtinagar Lucknow

Bank Accounts

Account Typecollection
Account Number50100148826131
Account NameSECRETARY LDA LKO PMAY SEC I PART B - CLN
Bank NameHDFC Bank Ltd.
BranchLUCKNOW- ALIGANJ
Branch AddressA-1/21, SECTOR-B OPP. NEHRU BAL VATIKA, ALIGANJ, LUCKNOW, UTTAR PRADESH- 226024
Branch DistrictLucknow
IFSCHDFC000412
Account Typeseparate
Account Number50100174390280
Account NameSECRETARY LDA LKOPMAY SEC I PART B
Bank NameHDFC BANK LTD.
BranchLUCKNOW- ALIGANJ
Branch AddressA-1/21, SECTOR-B OPP. NEHRU BAL VATIKA , ALIGANJ LUCKNOW,-226024
Branch DistrictLucknow
IFSCHDFC0000412
Account Typetransaction
Account Number50100477267380
Account NameSECRETARY LDA LKO PMAY BASANT KUNJ SEC I
Bank NameHDFC BANK LTD.
BranchLUCKNOW- ALIGANJ
Branch AddressA-1/21, SECTOR-B, OPP. NEHRU BAL VATIKA ALIGANJ, LUCKNOW
Branch DistrictLucknow
IFSCHDFC0000412

Development & Facilities

Development works

Demarcation Of PlotsNot Applicable
Boundary WallThere is no boundary wall is proposed for the project
Road WorkRoads of width 9.0 or more has to be constructed with base concrete having carriage way width 3.75m. Space between drain and both eadges of road will remain kachcha and flower-trees like amaltash or kusum will be planted on one side of road. Roads having width less than 9.0 m( i.e 6. 0m and 7.50m) has to be constructed with base concrete having 3.50 m wide carriage way. Space between drain and both eadges of road will remain kachcha. Road having width less than 4.50 m has to be constructed with 80 mm thick rubber molded tile with concrete base. CC roads of scheme have to be constructed with Ready Mix Concrete as per provisions of IRC: SP: 62 – 2014. The passage between building block and road will be made with 80 mm thick rubber moulded tile with base of concrete.
FootpathsInterlocking paver block is proposed for footpaths.
Water Supply Including Drinking Water FacilitiesAll water supply line from out let of pump house has to be laid of HDPE pipe of required size as per design.
Sewer Systemhas to be laid as per the design and standards with DWC-HDPE pipe.
DrainDrain system also will be constructed as per sanctioned plan and site requirements.
Parksthe parks boundary will be made with grill-wall with RCC Column upto 90cm height from ground level. And RCC plinth level will remain 45 cm maximum. No path-way or jogging track will be made within park and only grass will be planted. 80 mm thick interlocking tile with sand base has to laid round the building blocks between the building blocks. Parking space for each house has to be provided as per building-bye-laws, with 80mm thick interlocking paver blocks with concrete base. All work has to carried out with required specifications of PMAY-(U) Guidelines, UPPWD, Building Bylaws and NBC Guidelines.
Tree PlantingNot Applicable.
Design For Electric Supply Including Street Lightingfor residential blocks, work as per the design. Electrification work includes connection fron LT line to meter panel in staircase of building block and from meter panel through MCB and bus bar to each house has to be done.
Community BuildingsNot Applicable.
Treatment And Disposal System Of Sewage And Sullage WaterSewage will be dispose in STP in Basantkunj Youjna
Solid Waste Management And Disposal SystemAfter completion of the project infrastructure will be handed over to the local municipal corporation.
Water Conservation SystemRain Water Harvesting is proposed for water conservation system.
Energy Management System Including Use Of Renewable EnergyNot Applicable.
Fire Protection And Fire Safety SystemAs per Fire department and NBFC norms the houses is less than 30m of the heights so fire protection and fire safety works is not applicable for the project
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable.
Emergency Evacuation ServicesNot Applicable.
Other Miscellaneous WorkNot Applicable.

Financials

Registration Fee (₹)85000
Project Duration (months)56