Residential Plots (314 Nos) in Sector 8C GFT Ayodhya

by U.P. Awas Evam Vikas Parishad

Ayodhya, Uttar Pradesh · UPRERAPRJ823517/06/2025

Registered

Overview

Registration Date2025-06-12
RERA NumberUPRERAPRJ823517/06/2025
Promoter IDUPRERAPRM4243
Proposed Start2025-05-01
Proposed Completion2030-03-24

Location

DistrictAyodhya
TehsilSadar(Faizabad)
VillageSector-8C
AddressBhoomi Vikas Grihsthan Evam Bazar Yojna
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Plots314

Khasra records (1)

  • 587, 640, 650 to 659, 665 to 674, 674/1405, 675 to 699, 702 to 705, 708 and 709· Khasra· 86286

Inventory

Plots

TypeSize rangeCount
PlotUPTO 100 sqm110
Plot100 to 150 sqm113
Plot150 to 200 sqm91

Permits & Approvals

Permit NoAPD/U-3/PART LOP SEC-8C/G.F.T./AYO/CD AYO-01/SE-AYO/RERA-11/131/H.C.
Permit Date2025-03-25
Valid Until2030-03-24
Extendable Until2032-03-24

Documents

Filing documents

  • Other Plan(If Any)
  • Other
  • Details of Encumbrances#New(2025-04-26)
    View
  • Commencement Certificate#New(2025-04-08)
    View
  • Other Plan(If Any)#New(2025-04-26)
    View
  • Proforma of Application Form#New(2025-03-27)
    View
  • Proforma of Allotment Letter#New(2025-03-27)
    View
  • Proforma of Conveyance Deed#New(2025-03-27)
    View
  • Proforma of Completion Certificate(Occupancy)#New(2025-03-27)
    View
  • Waste Disposal Plan#New(2025-03-27)
    View
  • Water Supply Plan#New(2025-03-27)
    View
  • Electricity Supply Plan#New(2025-03-27)
    View
  • Development Work Plan#New(2025-03-27)
    View
  • Affidavit (Form-B)#New(2025-05-26)
    View
  • CA CERTIFICATE#New(2025-04-08)
    View
  • ARCHITECT CERTIFICATE#New(2025-04-08)
    View
  • ENGINEERS CERTIFICATE#New(2025-04-08)
    View
  • Other#New(2025-05-26)
    View
  • Proforma of Agreement for Sale#New(2025-03-27)
    View

Land documents

  • Extract of Khatauni#1430-1435(1900-01-01)
    14935803293.pdf
    View
  • Allotment Letter issued by Competent Authority#261/2023(2023-11-01)
    14935802726.pdf
    View
  • Allotment Letter issued by Competent Authority#155/LAC/HQ(2021-06-25)
    14935803900.pdf
    View
  • Registry Document#13443(2022-12-09)
    14935802251.pdf
    View
  • Extract of Khatauni#1425-1430(1900-01-01)
    14935809201.pdf
    View
  • Extract of Khatauni#1425-1430(1900-01-01)
    14935802210.pdf
    View

Project Team

Architect AddressNeelgiri Complex Indira nagar Lucknow
Engineer AddressNeelgiri Complex Indira Nagar Lucknow

Developer & Contact

Developer

Promoter NameU.P. Awas Evam Vikas Parishad
Promoter Address104 Mahatma Gandhi Marg, Lucknow
Company TypeCompetent authority
Mobile8189081725
Emailupavp-rera@upavp.com
Registered Address104 Mahatma Gandhi Marg, Lucknow
Contractor Address104 Mahatma Gandhi Marg Lucknow

Bank Accounts

Account Typecollection
Account Number029001004003
Account NameUPAVP Collection Account for Residential Plots (314 Nos) in Sector 8C GFT Ayodhya
Bank NameICICI Bank Limited
BranchNiyawah Faizabad
Branch Address19, 22 Nahar Bagh, Niyawah Faizabad
Branch DistrictAyodhya
Branch StateSelect
IFSCICIC0000290
Branch EmailAshutosh.s@icicibank.com
Account Typeseparate
Account Number029001004004
Account NameUPAVP-Separate Account for Residential Plots (314 Nos) in Sector 8C GFT, Ayodhya
Bank NameICICI Bank Limited
BranchNiyawah Faizabad
Branch Address19, 22 Nahar Bagh Niyawah Faizabad Uttar Pradesh 224001
Branch DistrictAyodhya
Branch StateUttar Pradesh
IFSCICICI0000290
Account Typetransaction
Account Number029001004005
Account NameUPAVP-Transection Account for Residential Plots (314 Nos) in Sector 8C, GFT Ayodhya
Bank NameICICI Bank Limited
BranchNiyawah Faizabad
Branch Address19, 22 Nahar Bagh Niyawah Faizabad Uttar Pradesh 224001
Branch DistrictAyodhya
Branch StateUttar Pradesh
IFSCICICI0000290

Development & Facilities

Development works

Demarcation Of PlotsAs per Approved Plan.
Boundary WallNot Provided
Road WorkRoad shall be constructed as per specification U.P. Avas Evam Vikas Parishad and U.P. PWD
FootpathsFootpath will be constructed as per road Cross section approved from competant Authority
Water Supply Including Drinking Water FacilitiesIt Shall be provided in accordance with U.P. Jalnigam specifications. The Distribution netwrok consist of sectorial water line connected to O.H.T./U.G.R.
Sewer SystemThe Underground sewer network with mainhols and chambers shall be provided in accordance with U.P. Jalnigam specifications
DrainDrainage Network shall be provided in line with the guidelines of drainage manual of U.P. Jalnigam/ Government of India.
ParksParks shall be developed as per U.P. Avas Evam Vikas Parishad specifications.
Tree PlantingWill be done in parks and along the roads.
Design For Electric Supply Including Street LightingWell design Electrical distribution network will be provided as per the load calculation in accordence with UPPCL and National Electricity Code. Streel Light will be provided.
Community BuildingsNot applicable
Treatment And Disposal System Of Sewage And Sullage WaterSewer network will be provided and the effluent will be treated in common STP proposed for the whole scheme.
Solid Waste Management And Disposal SystemWill be done in accordence to solid waste management manual/Government Orders.
Water Conservation SystemNot applicable
Energy Management System Including Use Of Renewable EnergyNot applicable
Fire Protection And Fire Safety SystemIntegrated fire fighiting system for the entire township. the same shall be contstructed by the pramoter
Social Infrastructure And Other Public Amenities Including Public Health ServicesThe Integrated township shall have all kind of land use such as rasidential, commercial, Educational, Institutional, Hospital and Mutts etc. to have a complete socially sustainable township.
Emergency Evacuation ServicesThe township is part of Distt. Ayodhya Disaster mitigation plan. The Fire Department of Government of U.P. shall look after this. The lay out is opened towards all direction so that easy evacuation take place during urgency/ Emergencty.
Other Miscellaneous WorkNot applicable

Financials

Registration Fee (₹)436500
Project Duration (months)59