Registered
Total units
80
Overview
Registration Date2021-05-20
RERA NumberUPRERAPRJ165029
Promoter IDUPRERAPRM12024
Proposed Start2021-02-01
Proposed Completion2025-02-01
Location
DistrictChandauli
TehsilChandauli
AddressARAZI NO.-512, MAUZA- GODHANA, PARGANA-DHUS DISTT.- CHANDAULI, MUGHALSARAI (DDU)
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units80
Unit Types3
Blocks1
Floors11
Khasra records (1)
- Arazi No. - 512, Mauza-Godhana, Pargana - Dhus, Distt. Chandauli· Khasra· 23010 m²
Inventory
Apartments (81 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Block-C Tower-3 | GF | OTHER | 0 | 0 | 0 | — |
| Block-C Tower-3 | 1 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 1 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 1 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 2 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 2 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 2 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 2 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 2 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 2 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 2 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 2 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 3 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 3 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 3 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 3 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 3 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 3 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 3 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 3 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 4 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 4 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 4 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 4 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 4 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 4 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 4 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 4 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 5 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 5 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 5 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 5 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 5 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 5 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 5 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 5 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 6 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 6 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 6 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 6 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 6 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 6 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 6 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 6 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 7 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 7 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 7 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 7 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 7 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 7 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 7 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 8 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 8 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 8 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 8 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 8 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 8 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 8 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 8 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 9 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 9 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 9 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 9 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 9 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 9 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 9 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 10 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 10 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 10 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 10 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 10 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 10 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 10 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 10 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 1 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 1 | 3 BHK | 1 | 73.27 | 3 | — |
| Block-C Tower-3 | 1 | 2 BHK | 1 | 47.26 | 2 | — |
| Block-C Tower-3 | 1 | 2 BHK | 1 | 53.64 | 2 | — |
| Block-C Tower-3 | 1 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 9 | 3 BHK | 1 | 72.28 | 2 | — |
| Block-C Tower-3 | 7 | 2 BHK | 1 | 47.26 | 2 | — |
Permits & Approvals
Permit No5
Permit Date2020-11-23
Valid Until2025-11-22
Extendable Until2028-11-22
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- Details of Encumbrances#New(2021-03-18)View
- Commencement Certificate#New(2021-03-18)View
- Other Plan(If Any)#New(2021-03-18)View
- Proforma of Application Form#New(2021-03-18)View
- Proforma of Allotment Letter#New(2021-03-18)View
- Proforma of Conveyance Deed#New(2021-03-18)View
- Waste Disposal Plan#New(2021-03-18)View
- Water Supply Plan#New(2021-03-18)View
- Electricity Supply Plan#New(2021-03-18)View
- Development Work Plan#New(2021-03-18)View
- Affidavit (Form-B)#New(2021-03-18)View
- CA CERTIFICATE#New(2021-04-08)View
- ARCHITECT CERTIFICATE#New(2021-04-08)View
- ENGINEERS CERTIFICATE#New(2021-04-08)View
Land documents
- Registry Document#8267(2013-07-16)View23447726058267.pdf
- Extract of Khatauni#1426-1431(2013-07-16)View2344779463Extract of khatauni.pdf
- Extract of Khatauni#Reply against objection received(1900-01-01)View2344772393Reply against objection received.pdf
- Registry Document#8979(2011-12-01)View23447795318979.pdf
- Extract of Khatauni#Partners Resolution(1900-01-01)View2344779416Partners Resolution.pdf
- Extract of Khatauni#Affidavit- Form RA-1(1900-01-01)View2344776786Affidavit RA-1.pdf
- Registry Document#8260(2013-07-16)View23447793738260 COMPRESSED.pdf
Project Team
Architect AddressRudra House, 15/63, Civil Lines Opposite, green park stadium, Gate no.-2, Kanpur
Engineer AddressG-70, 2nd Floor, Jaswant Plaza, Near kalandi kunj, main sarita vihar road okhla, New Delhi, 110025
Developer & Contact
Developer
Promoter NameMM AGROTECH AND DEVELOPERS
Promoter AddressRUDRA HOUSE C-27/273, C-13, INDIAN PRESS COLONY, MALDAHIYA, VARANASI 221001
Company TypePartnership Firm
Mobile7607780131
Emailrera.mmagrol@rudra.net.in
Registered AddressRUDRA HOUSE C-27/273, C-13, INDIAN PRESS COLONY, MALDAHIYA, VARANASI 221001
Contractor Address207, Gali-01, Sarvodya nagar, Gaziabad, U.P.-201009
Bank Accounts
Account Typecollection
Account Number039943298245
Account NameMM AGROTECH -COLL. A/C FOR RUDRA GARDEN CITY PH II
Bank NameState Bank of India
BranchSPL COMMERICAL BRANCH VARANASI
Branch AddressSME BRANCH, CLUB ROAD, VARANASI 221002
Branch DistrictVaranasi
Branch StateUttar Pradesh
IFSCSBIN0009252
Branch Emailsbi.09252@sbi.co.in
Account Typeseparate
Account Number39943298631
Account NameMM AGROTECH AND DEVELOPERS
Bank NameState Bank of India
BranchSME Branch
Branch AddressClub road, Varanadsi-221002
Branch DistrictVaranasi
Branch StateUttar Pradesh
IFSCSBIN0009252
Account Typetransaction
Account Number039943299113
Account NameMM AGROTECH-RERA TRANS A/c FOR RUDRA GARDEN CITY PH II
Bank NameState Bank of India
BranchSPL COMMERICAL BRANCH VARANASI
Branch AddressSME BRANCH, CLUB ROAD, VARANASI 221002
Branch DistrictVaranasi
Branch StateUttar Pradesh
IFSCSBIN0009252
Branch Emailsbi.09252@sbi.co.in
Development & Facilities
Development works
Demarcation Of PlotsThis is single plot ploygon shaped, having total 1 no. of entry gate and 1 no. of exit gate from the 46m wide front road, site is surrounded by other plots of farmers form three sides.
Boundary Wall1.8-2.1 meter high and 200 mm thick boundary all designed. Brick work of 9 inch and rcc work in column and beam may be used as per design. MS board entrance and exit gate are developed with boundary.
Road WorkTrimix road will be used as per design suggested by the architect for internal road.
FootpathsAll internal road will have narrow footpath with matt finish tiles pavers or equivalent finishes.
Water Supply Including Drinking Water FacilitiesGround water may also be used, also end user shall be used their individual RO system as per their requirement. Overhead tank shall be provide on building terrace for distribution through gravity.
Sewer SystemCentralized Sewerage system shall be provided. All sewerage water shall be go to the STP for treatment. after treatment, water shall be recycled and it will use in gardening, flush tanks nad vehicle washing, overflow form the STP shall be connect with the municipal sewerage system in future or a seasonal natural drain dunning along the site boundary.
DrainStrome water system shall be provided. Strome water shall from road and other landscape area shall be connect to the strom water drain channel and go to rain water harvesting pit for recharge the ground water and overflow shall be connect with municipal drain line.
ParksThere are many green/ landscape area in front/ side of building including green parks, play area for the children and recreational activity.
Tree PlantingThere are different type of tree plantation is proposed at site in order to maintain greenery and natural view.
Design For Electric Supply Including Street LightingWe have design the system as per local electricity board and consider centralization transformer, HT penal, LT penal, feeder pillar and DG back for common service like external lighting , HTP, pump room etc.
Community BuildingsClub house/community center id provide, swimming pool with sitting area and garden.
Treatment And Disposal System Of Sewage And Sullage WaterCentralized sewerage system shall be provided . All sewerage water shall be go to STP for treatment, after treatment water shall be recycle and it will be use in gardening, flush tanks and vehicle washing, overflow from STP shall be connect with municipal sewerage system in future or A seasonal natural drain running along the site boundary.
Solid Waste Management And Disposal SystemThere are a paper garbage collection area provide for the solid waste management.
Water Conservation Systemwe have design rain water harvesting system shall be provided for the whole building complex to conserve water.
Energy Management System Including Use Of Renewable EnergyWe will use LED light fitting in external area as well as solar light. In STP and pump room all the equipment shall have energy efficiency motor. Terrace will be provided with solar voltaic penal to provide renewable source of energy for common areas in building complex.
Fire Protection And Fire Safety SystemSince the building is less than 45m in height all the fire norms shall be followed as NBC and approval of fire department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSewerage, storm water and water supply system shall be provided. we have proposed common pump room with the primary filtration, transfer to fill the domestic overhead tank. Water for domestic use and flushing go down through gravity from domestic as well as flushing tank. All sewerage shall be go to the STP gravity from domestic as well as flashing tanks. All sewerage shall be go to the STP for recycling the water. Strom water for roof, road and other area shall be connect to the storm water drain channel and go to the rain water harvesting pit for recharge the ground water and overflow shall be connect with municipal drain or a seasonal natural drain running along the site boundary.
Emergency Evacuation ServicesFire staircase is provided in the each building, with fire resistant doors, basement have one access and exit in case of emergency.
Other Miscellaneous WorkLuxurious entrance lobby in each block, convenience store for day to day small purchasing, lush green shrubs at every vacant space on ground.
Financials
Registration Fee (₹)25000
Project Duration (months)70