Registered
Total units
107
Overview
Registration Date2024-01-09
RERA NumberUPRERAPRJ439692
Promoter IDUPRERAPRM256985
Proposed Start2023-10-15
Proposed Completion2028-06-30
Location
DistrictLucknow
TehsilSarojini Nagar
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units107
Unit Types4
Blocks2
Floors13
Khasra records (1)
- 6C- GH-05, Vrindavan Yojna, Lucknow· Plot· 4157 m²
Inventory
Apartments (80 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| 1 | GF | SHOP | 2 | 30.43 | 0 | — |
| 1 | 14 | OTHER | 1 | 203.47 | 0 | — |
| T | 1 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 1 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 1 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 1 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 1 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 1 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 2 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 2 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 2 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 2 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 2 | 2 BHK | 1 | 99.43 | 2 | — |
| T | 2 | 2 BHK | 1 | 98.22 | 2 | — |
| T | 3 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 3 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 3 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 3 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 3 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 3 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 4 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 4 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 4 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 4 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 4 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 4 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 5 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 5 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 5 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 5 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 5 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 5 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 6 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 6 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 6 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 6 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 6 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 6 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 7 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 7 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 7 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 7 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 7 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 7 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 8 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 8 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 8 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 8 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 8 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 8 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 9 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 9 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 9 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 9 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 9 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 9 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 10 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 10 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 10 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 10 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 10 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 10 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 11 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 11 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 11 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 11 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 11 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 11 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 12 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 12 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 12 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 12 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 12 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 12 | 3 BHK | 1 | 98.22 | 2 | — |
| T | 13 | 3 BHK | 2 | 118.24 | 2 | — |
| T | 13 | 3 BHK | 2 | 116.37 | 2 | — |
| T | 13 | 3 BHK | 1 | 92.33 | 1 | — |
| T | 13 | 2 BHK | 1 | 89.79 | 1 | — |
| T | 13 | 3 BHK | 1 | 99.43 | 2 | — |
| T | 13 | 3 BHK | 1 | 98.22 | 2 | — |
Permits & Approvals
Permit NoHigh Risk/UPAVP/BP/22-23/0705/08072023
Permit Date2023-09-28
Valid Until2028-09-27
Extendable Until2031-09-26
Documents
Filing documents
- Commencement Certificate
- Other Plan(If Any)
- Proforma of Conveyance Deed
- Proforma of Completion Certificate(Occupancy)
- Water Supply Plan
- CA CERTIFICATE
- ARCHITECT CERTIFICATE
- ENGINEERS CERTIFICATE
- Other
- Details of Encumbrances#New(2023-10-29)View
- Commencement Certificate#New(2023-11-21)View
- Other Plan(If Any)#New(2023-11-21)View
- Proforma of Application Form#New(2023-09-29)View
- Proforma of Allotment Letter#New(2023-09-29)View
- Proforma of Conveyance Deed#New(2023-10-12)View
- Waste Disposal Plan#New(2023-09-29)View
- Water Supply Plan#New(2023-10-24)View
- Electricity Supply Plan#New(2023-09-29)View
- Development Work Plan#New(2023-09-29)View
- Affidavit (Form-B)#New(2023-10-29)View
- CA CERTIFICATE#New(2023-10-13)View
- ARCHITECT CERTIFICATE#New(2023-10-13)View
- ENGINEERS CERTIFICATE#New(2023-10-12)View
- Other#New(2023-10-30)View
- Proforma of Agreement for Sale#New(2023-11-21)View
Project Team
Architect Address13/540 Indira Nagar , Lucknow -226016
Engineer Address1/353 Vinarma Khand, Gomti Nagar, Lucknow
Developer & Contact
Developer
Promoter NameShivani Gangajali LLP
Promoter AddressB-1/283 Sector -H, LDA Colony, Kanpur Road , Lucknow -226012
Company TypeProprietorship Firm
Mobile9711773812
Emailsgheights22@gmail.com
Registered AddressB-1/283 Sector -H, LDA Colony, Kanpur Road , Lucknow -226012
Contractor Address13/540 Indira Nagar, Lucknow -226016
Development & Facilities
Development works
Demarcation Of PlotsPlot No- 6C/GH-05, Vrindavan Yojna, Lucknow North - Plot No- 6C/Gh-03, South - 24 mtr wide road, East - Green Belt, West - 12 mtr wide road
Boundary Wall1.6 mtr height RCC framed column based with brick panels boundary wall all around the plot area . Running meter of boundary wall is 265 RMT.
Road Work6.0 mtr wide 100 mm thick RCC M-25 with nominal steel road network all around the block- Quantity - 1104 Sqm
Footpaths50 mm thick Paver blocks along the park area with 75 mm thick PCC with sand filling
Water Supply Including Drinking Water FacilitiesUGT tanks of capacity 1.0 lakh litr with 50 ,000 litr 02 nos overhead tanks
Sewer System300 mtr length 300 mm dia NP2 RCC hume pipe network with main holes at 30 mtr c/c
Drain250 mtr length 600 mm width drain by brick work along the boundary wall
Parks2 nos parks total area under green is more than 10 percent of plot area, Park 1 area - 204 Sqm and Park-2 area - 214 Sqm
Tree Planting30 nos flowering trees with height 6 feet height
Design For Electric Supply Including Street LightingMain power supply through UPPCL from high tension lines . Dedicated transformer as per design capacity through electrical panels and Street lighting 30m c/c
Community BuildingsClub building at 14th floor of built-up area of 229.00 Sqm
Treatment And Disposal System Of Sewage And Sullage WaterSewer Collection tank having connection with trunk sewer of Awas Vikas
Solid Waste Management And Disposal SystemGarbage Chute
Water Conservation System2 nos Rain Water Harvesting pits as per design
Energy Management System Including Use Of Renewable Energy25 percentage of roof top area is dedicated to solar panels
Fire Protection And Fire Safety SystemAs per provisional Fire NOC with 1.0 lakh litrs of fire tank and terrace tanks and required numbers wet riser and 30 mtrs hose reels etc.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFire Stair case
Other Miscellaneous WorkMain Gate
Financials
Registration Fee (₹)26000
Project Duration (months)57