Registered
Total units
173
Overview
Registration Date2023-05-10
RERA NumberUPRERAPRJ591602
Promoter IDUPRERAPRM218114
Proposed Start2022-12-15
Proposed Completion2027-11-02
Location
DistrictAligarh
TehsilKoil
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units173
Unit Types2
Blocks1
Floors8
Khasra records (1)
- 1,2,3,4,5,6· Plot· 798558 m²
Inventory
Apartments (135 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| G | GF | SHOP | 1 | 81.83 | 0 | — |
| G | GF | SHOP | 1 | 35.79 | 0 | — |
| G | GF | SHOP | 1 | 35.01 | 0 | — |
| G | GF | SHOP | 1 | 43.99 | 0 | — |
| G | GF | SHOP | 1 | 47.24 | 0 | — |
| G | GF | SHOP | 1 | 38.29 | 0 | — |
| G | GF | SHOP | 1 | 29.56 | 0 | — |
| G | GF | SHOP | 1 | 29.11 | 0 | — |
| G | GF | SHOP | 1 | 39.87 | 0 | — |
| G | GF | SHOP | 1 | 32.24 | 0 | — |
| G | GF | SHOP | 1 | 31.12 | 0 | — |
| G | GF | SHOP | 1 | 34.23 | 0 | — |
| G | GF | SHOP | 1 | 38.49 | 0 | — |
| G | GF | SHOP | 1 | 38.04 | 0 | — |
| G | GF | SHOP | 1 | 53.13 | 0 | — |
| G | GF | SHOP | 1 | 50.68 | 0 | — |
| G | GF | SHOP | 1 | 43.53 | 0 | — |
| G | GF | SHOP | 1 | 42.58 | 0 | — |
| G | GF | SHOP | 1 | 53.5 | 0 | — |
| G | GF | SHOP | 1 | 47.23 | 0 | — |
| G | GF | SHOP | 1 | 39.04 | 0 | — |
| G | GF | SHOP | 1 | 32.62 | 0 | — |
| G | GF | SHOP | 1 | 32.13 | 0 | — |
| G | GF | SHOP | 1 | 43.14 | 0 | — |
| G | GF | SHOP | 1 | 53.12 | 0 | — |
| G | GF | SHOP | 1 | 39.57 | 0 | — |
| G | GF | SHOP | 1 | 40.16 | 0 | — |
| G | GF | SHOP | 1 | 58.6 | 0 | — |
| G | GF | SHOP | 1 | 72.28 | 0 | — |
| G | GF | SHOP | 1 | 55.15 | 0 | — |
| G | GF | SHOP | 1 | 43.9 | 0 | — |
| G | GF | SHOP | 1 | 44.87 | 0 | — |
| G | GF | SHOP | 1 | 52.25 | 0 | — |
| G | GF | SHOP | 1 | 54.95 | 0 | — |
| G | GF | SHOP | 1 | 34.23 | 0 | — |
| G | GF | SHOP | 1 | 31.12 | 0 | — |
| G | GF | SHOP | 1 | 32.24 | 0 | — |
| G | GF | SHOP | 1 | 39.87 | 0 | — |
| G | GF | SHOP | 1 | 29.11 | 0 | — |
| G | GF | SHOP | 1 | 29.56 | 0 | — |
| G | GF | SHOP | 1 | 38.29 | 0 | — |
| G | GF | SHOP | 1 | 47.24 | 0 | — |
| G | GF | SHOP | 1 | 43.99 | 0 | — |
| G | GF | SHOP | 1 | 35.01 | 0 | — |
| G | GF | SHOP | 1 | 35.79 | 0 | — |
| G | GF | SHOP | 1 | 81.83 | 0 | — |
| G | 1 | SHOP | 1 | 24.56 | 0 | — |
| G | 1 | SHOP | 1 | 14.73 | 0 | — |
| G | 1 | SHOP | 1 | 31.48 | 0 | — |
| G | 1 | SHOP | 1 | 29.96 | 0 | — |
| G | 1 | SHOP | 1 | 29.54 | 0 | — |
| G | 1 | SHOP | 1 | 36.03 | 0 | — |
| G | 1 | SHOP | 1 | 38.02 | 0 | — |
| G | 1 | SHOP | 1 | 30.97 | 0 | — |
| G | 1 | SHOP | 1 | 24.56 | 0 | — |
| G | 1 | SHOP | 1 | 23.96 | 0 | — |
| G | 1 | SHOP | 1 | 32.32 | 0 | — |
| G | 1 | SHOP | 1 | 27.55 | 0 | — |
| G | 1 | SHOP | 1 | 26.59 | 0 | — |
| G | 1 | SHOP | 1 | 29.21 | 0 | — |
| G | 1 | SHOP | 1 | 29.7 | 0 | — |
| G | 1 | SHOP | 1 | 31.91 | 0 | — |
| G | 1 | SHOP | 1 | 45.96 | 0 | — |
| G | 1 | SHOP | 1 | 45.53 | 0 | — |
| G | 1 | SHOP | 1 | 37.94 | 0 | — |
| G | 1 | SHOP | 1 | 37.41 | 0 | — |
| G | 1 | SHOP | 1 | 45.64 | 0 | — |
| G | 1 | SHOP | 1 | 38.02 | 0 | — |
| G | 1 | SHOP | 1 | 30.97 | 0 | — |
| G | 1 | SHOP | 1 | 27.79 | 0 | — |
| G | 1 | SHOP | 1 | 27.12 | 0 | — |
| G | 1 | SHOP | 1 | 36.57 | 0 | — |
| G | 1 | SHOP | 1 | 46.49 | 0 | — |
| G | 1 | SHOP | 1 | 34.47 | 0 | — |
| G | 1 | SHOP | 1 | 35.32 | 0 | — |
| G | 1 | SHOP | 1 | 51.23 | 0 | — |
| G | 1 | SHOP | 1 | 62.88 | 0 | — |
| G | 1 | SHOP | 1 | 46.92 | 0 | — |
| G | 1 | SHOP | 1 | 38.46 | 0 | — |
| G | 1 | SHOP | 1 | 39.01 | 0 | — |
| G | 1 | SHOP | 1 | 46.81 | 0 | — |
| G | 1 | SHOP | 1 | 47.25 | 0 | — |
| G | 1 | SHOP | 1 | 33.57 | 0 | — |
| G | 1 | SHOP | 1 | 27.6 | 0 | — |
| G | 1 | SHOP | 1 | 25.13 | 0 | — |
| G | 1 | SHOP | 1 | 26.03 | 0 | — |
| G | 1 | SHOP | 1 | 32.32 | 0 | — |
| G | 1 | SHOP | 1 | 23.96 | 0 | — |
| G | 1 | SHOP | 1 | 24.56 | 0 | — |
| G | 1 | SHOP | 1 | 30.97 | 0 | — |
| G | 1 | SHOP | 1 | 38.02 | 0 | — |
| G | 1 | SHOP | 1 | 36.03 | 0 | — |
| G | 1 | SHOP | 1 | 29.54 | 0 | — |
| G | 1 | SHOP | 1 | 29.96 | 0 | — |
| G | 1 | SHOP | 1 | 31.48 | 0 | — |
| G | 1 | SHOP | 1 | 24.56 | 0 | — |
| G | 1 | SHOP | 1 | 14.73 | 0 | — |
| G | 2 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 2 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 2 | 5 BHK | 2 | 118.57 | 2 | — |
| G | 2 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 2 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 2 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 2 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 2 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 3 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 3 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 3 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 3 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 3 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 3 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 3 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 3 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 4 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 4 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 4 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 4 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 4 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 4 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 4 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 4 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 5 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 5 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 5 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 5 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 5 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 5 | 5 BHK | 2 | 145.72 | 2 | — |
| G | 5 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 6 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 6 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 6 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 6 | 5 BHK | 2 | 121.1 | 2 | — |
| G | 7 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 7 | 5 BHK | 2 | 145.72 | 1 | — |
| G | 5 | 5 BHK | 2 | 121.1 | 2 | — |
Permits & Approvals
Permit NoGroup Housing/01256/AGDA/BP/21-22/0338/19072022
Permit Date2022-12-02
Valid Until2027-12-01
Extendable Until2030-12-01
Documents
Filing documents
- Details of Encumbrances
- Other Plan(If Any)
- Proforma of Conveyance Deed
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- ARCHITECT CERTIFICATE
- Other
- Details of Encumbrances#New(2023-04-26)View
- Commencement Certificate#New(2023-04-07)View
- Other Plan(If Any)#New(2023-04-26)View
- Proforma of Application Form#New(2023-04-07)View
- Proforma of Allotment Letter#New(2023-04-07)View
- Proforma of Conveyance Deed#New(2023-04-26)View
- Waste Disposal Plan#New(2023-04-26)View
- Water Supply Plan#New(2023-04-26)View
- Electricity Supply Plan#New(2023-04-26)View
- Development Work Plan#New(2023-04-26)View
- Affidavit (Form-B)#New(2023-04-07)View
- CA CERTIFICATE#New(2023-04-26)View
- ARCHITECT CERTIFICATE#New(2023-04-26)View
- ENGINEERS CERTIFICATE#New(2023-04-26)View
- Other#New(2023-04-26)View
Land documents
- Extract of Khatauni#Electrical Plan(1900-01-01)View7188303110Electrical Plan.pdf
- Extract of Khatauni#Plumbing Plan(1900-01-01)View7188305951Plumbing Plan.pdf
- Extract of Khatauni#Site Development Plan(1900-01-01)View7188303769Site Development Plan.pdf
- Extract of Khatauni#Waste Disposal Plan(1900-01-01)View7188307327Waste Plan.pdf
- Extract of Khatauni#Water Supply Plan(1900-01-01)View7188306564Water Supply.pdf
- Extract of Khatauni#Nagar Nigam NOC in lieu of Khatoni copy(1900-01-01)View7188303154Nagar Nigam NOC.pdf
- Extract of Khatauni#NOC from Tehsil in lieu of Khatoni Copy(1900-01-01)View7188305974NOC from Tehsil.pdf
- Extract of Khatauni#Reply to the objection letter(1900-01-01)View7188307890Reply to the objection letter.pdf
- Sale Deed#6443(2008-07-14)View7188308407Title deed dated 14_7_2008 (No. 6443).pdf
- Sale Deed#6932(2008-07-24)View7188305706Title deed dated 24_7_2008 (No 6932).pdf
- Sale Deed#7077(2008-07-26)View7188304997Title deed dated 26_7_2008 (No 7077).pdf
- Registry Document#623(1956-03-08)View718830535301. 8-3-1956.pdf
- Registry Document#619(1956-03-08)View718830215202. 8-3-1956.pdf
- Registry Document#931(1956-04-20)View718830252003. 20-4-1956.pdf
- Registry Document#2291(1956-10-05)View718830913604. 5-10-1956.pdf
- Registry Document#1452(1958-06-05)View718830767205. 5-6-1958.pdf
- Registry Document#2(1968-12-26)View718830261506. 26-12-1968_compressed (1).pdf
- Registry Document#3195(2007-02-14)View718830597209. 14-2-2007 (1).pdf
- Registry Document#710(2008-01-02)View718830727613. 2-1-2008.pdf
- Registry Document#1416(1976-05-10)View718830671007. 10-5-1976.pdf
Project Team
Architect AddressJ- 76, Janakpuri, Aligarh
Engineer AddressMedical Road, Aligarh
Developer & Contact
Developer
Promoter NameSEVEN HEAVEN CONSTRUCTIONS PRIVATE LIMITED
Promoter AddressE-11 Arya Nagar society, Indraprastha extension, Delhi
Company TypeCompany
Mobile9412273494
Emailshardamall@yahoo.com
Registered AddressE-11 Arya Nagar society, Indraprastha extension, Delhi
Contractor Address3/169 Janakpuri,Marris Road, Aligarh
Bank Accounts
Account Typecollection
Account Number203110100002168
Account NameSeven heaven constructions Pvt Ltd Collection account for SS Point
Bank NameBombay mercantile co operative Bank LTD
BranchDodhpur Aligarh Branch
Branch AddressW34p +9hfBMC bank, Dodhpur Aligarh
Branch DistrictAligarh
Branch StateUttar Pradesh
IFSCBMCBO000047
Account Typeseparate
Account Number203110100002167
Account NameSeven heaven constructions Pvt Ltd Separate account for SS Point
Bank NameBombay mercantile co operative Bank LTD
BranchDodhpur Aligarh Branch
Branch AddressW34p +9hf BMC bank, Dodhpur Aligarh
Branch DistrictAligarh
Branch StateUttar Pradesh
IFSCBMCBO000047
Account Typetransaction
Account Number203110100002161
Account NameSeven heaven constructions Pvt Ltd Rera transaction account for S S Point
Bank NameBombay mercantile cooperative Bank LTD
BranchDodhpur Aligarh Branch
Branch AddressW34p +9hf BMC bank, Dodhpur Aligarh
Branch DistrictAligarh
Branch StateUttar Pradesh
IFSCBMCBO000047
Development & Facilities
Development works
Demarcation Of PlotsWe have one plot of size 7985.56 Sq. Mtr. having 1 main entrance gate from 12m wide front road.
Boundary Wall2m high and 230 mm thick brick work and rcc work in column and beam. At the centre face of the boundary wall there would be a logo of the project which would give a beautiful iconic design to the boundary wall.
Road WorkFrom the main entrance gate we have 80mm thick interlocking brick/ RCC road throughout the project, whose wideness starts from 8 mtr.
FootpathsWe will not provide any footpath
Water Supply Including Drinking Water FacilitiesWe will provide Six Nos. of pump for the requirement of blocks through underground pipelines.
Sewer SystemModular Sewer System shall be provided. All sewerage shall go to the STP and overflow from the STP shall connect with municipal sewerage system, when comes into force.
DrainStorm water shall be provided. Storm water from roads and other landscape area shall be connect to the Storm water drain channel and go to the rain water harvesting pit for recharge the ground water and overflow shall be connect with the municipal drain line.
ParksWe will provide green area with different activities and the green area will have gaming facilities for kids
Tree PlantingWe will provide many types of trees all along the boundary wall and green area
Design For Electric Supply Including Street Lightingwe will design and implement the system as per local electricity board and will consider centralized transformer, HT pane, LT panel, feeder pillar and DG back for common service like external lighting, fountain, STP, Pump Room etc.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterModular sewerage system shall be provided. All sewerage water shall go to the STP and overflow from the STP shall be connect with the Municipal Sewerage system which comes into force.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well as dual flush cistern and raw water harvesting system to reduce water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemWe will provide fire fighting facilities in common areas, while individual owners can install their own system as per their local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesWe have proposed common pump room. All sewerage shall go to the STP. Road Sand other areas shall be connect to the storm water drain channel and go to the rain water.
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)45000
Project Duration (months)59