Samsara Studio Apartments Phase - IV
by OZONE BUILDERS & DEVELOPERS PVT LIMITED
Aligarh, Uttar Pradesh · UPRERAPRJ111795/11/2025
Total units
160
Overview
Registration Date2025-11-27
RERA NumberUPRERAPRJ111795/11/2025
Promoter IDUPRERAPRM5303
Proposed Start2024-10-01
Proposed Completion2026-10-31
Location
DistrictAligarh
TehsilKoil
VillageYakutpur
AddressKhasra No. 74 & 88 in Village Yakutpur, Tehsil - Koil, Aligarh, 202001
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units160
Unit Types2
Blocks1
Floors4
Khasra records (5)
- 74· Khasra· 971820 m²
- 74· Khasra· 1583333 m²
- 74· Khasra· 1006910 m²
- 74· Khasra· 395833 m²
- 88· Khasra· 191000 m²
Inventory
Apartments (44 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| 1 | 1 | 1 BHK | 14 | 33.06 | 1 | — |
| 1 | 1 | 1 BHK | 1 | 33.9 | 1 | — |
| 1 | 1 | 1 BHK | 1 | 34.07 | 1 | — |
| 1 | 1 | 1 BHK | 1 | 34.22 | 1 | — |
| 1 | 1 | 1 BHK | 1 | 34.05 | 1 | — |
| 1 | 1 | 1 BHK | 1 | 33.53 | 1 | — |
| 1 | 1 | 1 BHK | 1 | 33.7 | 1 | — |
| 1 | 1 | 2 BHK | 15 | 43.1 | 1 | — |
| 1 | 1 | 2 BHK | 3 | 43.13 | 1 | — |
| 1 | 1 | 2 BHK | 1 | 42.88 | 1 | — |
| 1 | 1 | 2 BHK | 1 | 43.24 | 1 | — |
| 1 | 2 | 1 BHK | 14 | 33.06 | 1 | — |
| 1 | 2 | 1 BHK | 1 | 33.9 | 1 | — |
| 1 | 2 | 1 BHK | 1 | 34.07 | 1 | — |
| 1 | 2 | 1 BHK | 1 | 33.7 | 1 | — |
| 1 | 2 | 1 BHK | 1 | 34.22 | 1 | — |
| 1 | 2 | 1 BHK | 1 | 33.53 | 1 | — |
| 1 | 2 | 1 BHK | 1 | 34.05 | 1 | — |
| 1 | 2 | 2 BHK | 15 | 43.1 | 1 | — |
| 1 | 2 | 2 BHK | 3 | 43.13 | 1 | — |
| 1 | 2 | 2 BHK | 1 | 42.88 | 1 | — |
| 1 | 2 | 2 BHK | 1 | 43.24 | 1 | — |
| 1 | 3 | 1 BHK | 14 | 33.06 | 1 | — |
| 1 | 3 | 1 BHK | 1 | 33.9 | 1 | — |
| 1 | 3 | 1 BHK | 1 | 34.07 | 1 | — |
| 1 | 3 | 1 BHK | 1 | 33.7 | 1 | — |
| 1 | 3 | 1 BHK | 1 | 34.22 | 1 | — |
| 1 | 3 | 1 BHK | 1 | 33.53 | 1 | — |
| 1 | 3 | 1 BHK | 1 | 34.05 | 1 | — |
| 1 | 3 | 2 BHK | 15 | 43.1 | 1 | — |
| 1 | 3 | 2 BHK | 3 | 43.13 | 1 | — |
| 1 | 3 | 2 BHK | 1 | 42.88 | 1 | — |
| 1 | 3 | 2 BHK | 1 | 43.24 | 1 | — |
| 1 | 4 | 1 BHK | 14 | 33.06 | 1 | — |
| 1 | 4 | 1 BHK | 1 | 33.9 | 1 | — |
| 1 | 4 | 1 BHK | 1 | 34.07 | 1 | — |
| 1 | 4 | 1 BHK | 1 | 33.7 | 1 | — |
| 1 | 4 | 1 BHK | 1 | 34.22 | 1 | — |
| 1 | 4 | 1 BHK | 1 | 33.53 | 1 | — |
| 1 | 4 | 1 BHK | 1 | 34.05 | 1 | — |
| 1 | 4 | 2 BHK | 15 | 43.1 | 1 | — |
| 1 | 4 | 2 BHK | 3 | 43.13 | 1 | — |
| 1 | 4 | 2 BHK | 1 | 42.88 | 1 | — |
| 1 | 4 | 2 BHK | 1 | 43.24 | 1 | — |
Permits & Approvals
Permit NoHousing/02085/AGDA/BP/23-24/0291/27102023
Permit Date2024-06-14
Valid Until2029-06-13
Extendable Until2032-06-13
Documents
Filing documents
- Commencement Certificate
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2025-10-14)View
- Other Plan(If Any)#New(2025-11-06)View
- Proforma of Application Form#New(2025-09-26)View
- Proforma of Allotment Letter#New(2025-09-26)View
- Proforma of Conveyance Deed#New(2025-10-14)View
- Waste Disposal Plan#New(2025-09-26)View
- Water Supply Plan#New(2025-09-26)View
- Electricity Supply Plan#New(2025-09-26)View
- Development Work Plan#New(2025-09-26)View
- Affidavit (Form-B)#New(2025-10-14)View
- CA CERTIFICATE#New(2025-10-14)View
- ARCHITECT CERTIFICATE#New(2025-11-05)View
- ENGINEERS CERTIFICATE#New(2025-10-14)View
- Other#New(2025-09-26)View
- Proforma of Agreement for Sale#New(2025-09-26)View
Land documents
- Sale Deed#Bahi 1, Jild 12200, Page 359 -378, S. No. 17418(2024-12-19)View17552652204.pdf
- Sale Deed#Bahi 1, Jild 9453, Page No. 25 - 70, S. No. 6587(2012-05-24)View17552655135.pdf
- Sale Deed#Bahi 1, Jild 9414 page No. 35 - 50, S. No. 5887(2012-05-10)View17552659450.pdf
- Sale Deed#Bahi 1, Jild 5736, Page No. 217 - 258, S. No. 7500(2007-10-16)View17552656398.pdf
- Sale Deed#Bahi 1, Jild 10411, Page 1-28, S.No. 8535(2023-07-16)View17552652694.pdf
- Extract of Khatauni#1430 - 1435 (01 July, 2022 to 30 June 2028)(1900-01-01)View17552651991.pdf
- Extract of Khatauni#1430-1435 (01July, 2022 to 30 June, 2028)(1900-01-01)View17552658817.pdf
Project Team
Architect AddressWard No. 26, Laxmi Chowk, Bagaha - 1, Near Axis Bank, West Champaran, 845101
Engineer AddressFirdos Nagar, Killa Road (Paschim) Masjid Ke Samne Koil, Aligarh , 202001 (UP)
Developer & Contact
Developer
Promoter NameOZONE BUILDERS & DEVELOPERS PVT LIMITED
Promoter AddressFlat no. 57, Front Portion, 4th Floor PKT, C-DDA, Sec B-2, Narela, West Delhi, Delhi- 110040
Company TypeCompany
Mobile9758075005
Emailreraozone@gmail.com
Registered AddressFlat no. 57, Front Portion, 4th Floor PKT, C-DDA, Sec B-2, Narela, West Delhi, Delhi- 110040
Contractor AddressVardhman Mall Sector - 19, Faridabad - 121002
Bank Accounts
Account Typecollection
Account Number9546002900000032
Account NameOZONE BUILDERS AND DEVELOPERS PVT LTD COLL ACC FOR SAMSARA STUDIO APRT PH IV
Bank NamePUNJAB NATIONAL BANK
BranchTALA NAGRI
Branch AddressTala Nagari, Near Rasik Tower, Aligarh, Uttar Pradesh
Branch DistrictAligarh
Branch StateUttar Pradesh
IFSCPUNB0954600
Branch EmailBo954600@pnb.co.in
Account Typeseparate
Account Number9546002900000041
Account NameOZONE BUILDERS AND DEVELOPERS PVT LTD SEP ACC FOR SAMSARA STUDIO APRT PH IV
Bank NamePunjab National Bank
BranchTala Nagri
Branch AddressTala Nagri, Near Rasik Tower. Aligarh, Uttar Pradesh
Branch DistrictAligarh
Branch StateUttar Pradesh
IFSCPUNB0954600
Account Typetransaction
Account Number9546002900000050
Account NameOZONE BUILDERS AND DEVELOPERS PVT LTD RERA TRANS ACC FOR SAMSARA STUDIO APRT PH IV
Bank NamePunjab National Bank
BranchTala Nagri
Branch AddressTala Nagri, Near Rasik Tower, Aligarh, Uttar Pradesh
Branch DistrictAligarh
Branch StateUttar Pradesh
IFSCPUNB0954600
Development & Facilities
Development works
Demarcation Of PlotsThe project land demarcated as follows - "Samsara Studio Apartment Phase - IV situated at Khasra No. 74 and 88, Village YakutPur, Tehsil Koil, Aligarh, Latitude 27.8117660 and Longitude 78.132162 to the North Land of Ozone Builders and Developers Private Limited to the South Ozone City Phase VI The Golden Estate to the East Land of Ozone Builders and Developers Private Limited to the West 9 meters wide road Ozone City Phase VI The Golden Estate admeasuring 4148.89 sq. meter.
Boundary Wall2 Meter High boundary wall with brickwork and both side plaster RCC Column 3 to 5 meters from center to center. The boundary wall shall be earthquake resistant.
Road WorkAll the roads in the complex will be in the combination with RCC and concrete pavers of different colors, shapes and thickness. The Road will be 3 meters laid over 225mm water bound macadam.
FootpathsAll the footpath in the complex will be in combination with concrete pavers of different colors, shapes and thickness of 125mm laid over 225mm water bound macadam surface.
Water Supply Including Drinking Water FacilitiesDrinking water supply is to be provided through the existing overhead tank to the apartments and treated water will be supplied from the STP for irrigation. The drinking water source is from existing tube wells. A water filtration plant is installed before the overhead tank.
Sewer SystemThe sewage will be collected through RCC/ Soil pipeline arrangements, bends and inspection chambers leading to the sewage water treatment plant (STP) of the project from where the sewage will be used for irrigation. Inspection chambers shall be of 900 mm dia and the main pipeline is 400 mm dia shall be used
DrainRziin water shall be collected in drains having width 150mm connected to the underground cement concrete pipelines. For discharge water will be collected in manholes to be constructed in the periphery of the complex and these manholes shall be finally connected with the drain of harvesting pits and overflow to Jaffri drain. Inspection chambers shall be of 900mm dia and the main pipeline is of 300 mm dia shall be used.
ParksNot Applicable
Tree PlantingThe trees will be planted at all suitable locations of the project and along withe boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the service / usage of the project. Total 21 No. trees shall be planted in the entire project.
Design For Electric Supply Including Street LightingElectricity supply is provided through 33/0.415 KV transforms installed in adjoining land owned by the promoter. External Street Lights shall be used through grid power.
Community BuildingsNot Applicable
Treatment And Disposal System Of Sewage And Sullage WaterSewage shall be treated in a sewage treatment plant (STP) installed in the adjacent land owned by the promoter and thereafter treated water to be used for irrigation purposes.
Solid Waste Management And Disposal SystemSolid waste is to be collected from individuals apartments and stored in the garbage rooms. The professional services provider shall be engaged for the disposal of solid waste outside the project premise.
Water Conservation SystemRain water harvesting 13 nos. and size 1.50 meter diameter each shall be provided for ground water recharging and overflow to be discharged in the Jaffri drains. Treated swage shall be used for irrigation.
Energy Management System Including Use Of Renewable EnergyA single point supply of 33KV shall be taken and through electric sub station and 440V supply shall be supplied to individual apartments through panels and sub meters.
Fire Protection And Fire Safety SystemAll the requisite requirements has been done.
Social Infrastructure And Other Public Amenities Including Public Health ServicesCommon social infrastructure shall be provided for all the phases combined.
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkNot Applicable
Financials
Registration Fee (₹)26000
Project Duration (months)25