Registered
Overview
Registration Date2025-11-27
RERA NumberUPRERAPRJ742268/11/2025
Promoter IDUPRERAPRM4092
Proposed Start2025-08-01
Proposed Completion2028-05-20
Location
DistrictBarabanki
TehsilNawabganj
VillageNawabganj
LocalityBarabanki
AddressKHASRA No. 539A,5398,541MIN,543, 552,553,554A, 555MIN,557M, 558MIN,559A,559B,560,561,562A, 562B,540,542,546,547, 556,563,564, VILLAGE-KEWARI, PARGANA-DEVA, TEHSIL-NAWABGANJ, BARABANKI, UP.
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Plots146
Khasra records (1)
- KHASRA No. 539A,5398,541MIN,543, 552,553,554A, 555MIN,557M, 558MIN,559A,559B,560,561,562A, 562B,540,542,546,547, 556,563,564, VILLAGE-KEWARI, PARGANA-DEVA, TEHSIL-NAWABGANJ, BARABANKI, UP· Khasra· 4114663 m²
Inventory
Plots
| Type | Size range | Count |
|---|---|---|
| Plot | 200 to 250 sqm | 3 |
| Plot | 100 to 150 sqm | 109 |
| Plot | 150 to 200 sqm | 34 |
Permits & Approvals
Permit No382
Permit Date2025-05-22
Valid Until2028-05-21
Extendable Until2030-05-21
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- ARCHITECT CERTIFICATE
- ENGINEERS CERTIFICATE
- Other
- Details of Encumbrances#New(2025-10-25)View
- Commencement Certificate#New(2025-10-25)View
- Other Plan(If Any)#New(2025-10-27)View
- Proforma of Application Form#New(2025-10-25)View
- Proforma of Allotment Letter#New(2025-10-25)View
- Proforma of Conveyance Deed#New(2025-10-25)View
- Waste Disposal Plan#New(2025-10-25)View
- Water Supply Plan#New(2025-10-25)View
- Electricity Supply Plan#New(2025-10-25)View
- Development Work Plan#New(2025-10-25)View
- Affidavit (Form-B)#New(2025-10-25)View
- CA CERTIFICATE#New(2025-10-27)View
- ARCHITECT CERTIFICATE#New(2025-11-16)View
- ENGINEERS CERTIFICATE#New(2025-11-16)View
- Proforma of Agreement for Sale#New(2025-10-25)View
Land documents
- Sale Deed#833(2025-01-10)View17994825008.pdf
- Sale Deed#2076(2024-01-23)View17994827630.pdf
- Sale Deed#2078(2024-01-23)View17994826453.pdf
- Sale Deed#5174(2022-03-14)View17994827913.pdf
- Sale Deed#5175(2022-03-14)View17994825683.pdf
- Sale Deed#8725(2024-03-23)View17994824079.pdf
- Sale Deed#8728(2024-03-23)View17994826263.pdf
- Sale Deed#9371(2025-04-02)View17994821303.pdf
- Sale Deed#9605(2024-04-04)View17994826138.pdf
- Sale Deed#9886(2024-04-08)View17994829391.pdf
- Sale Deed#14054(2025-05-20)View17994827659.pdf
- Sale Deed#14055(2025-05-20)View17994823799.pdf
- Sale Deed#14057(2025-05-20)View17994823680.pdf
- Sale Deed#14619(2017-12-05)View17994828094.pdf
- Sale Deed#14966(2019-08-29)View17994829366.pdf
- Sale Deed#6514(2020-06-18)View17994823577.pdf
- Extract of Khatauni#EXCHANGE ORDER(1900-01-01)View17994824114.pdf
- Registry Document#JDA-17264(2025-06-19)View17994828823.pdf
- Sale Deed#3611(2025-02-05)View17994824205.PDF
- Sale Deed#3612(2025-02-05)View17994825250.PDF
- Sale Deed#14747(2025-05-26)View17994826726.pdf
- Sale Deed#14748(2025-05-26)View17994822107.pdf
- Sale Deed#30342(2025-11-01)View17994823469.pdf
- Sale Deed#30343(2025-11-01)View17994826257.pdf
- Sale Deed#372 - Chain Deed 372 Khasra (Ankit to S M And S H Buildzone LLP)(2023-01-05)View17994826953.pdf
- Sale Deed#12836 - Chain Deed 12836 Khasra 557 (Ankit to menka)(2022-06-17)View17994822713.pdf
- Extract of Khatauni#Khatauni - 1(1900-01-01)View17994827438.pdf
- Extract of Khatauni#Khatauni - 2(1900-01-01)View17994826940.pdf
- Extract of Khatauni#Khasra Area chart(1900-01-01)View17994821607.pdf
- Extract of Khatauni#Land Area chart(1900-01-01)View17994827811.pdf
Project Team
Architect Address11th Floor Titanium Building, Vibhuti Khand, Gomti Nagar, Lucknow-226010
Engineer Address11th Floor Titanium Building, Vibhuti Khand, Gomti Nagar, Lucknow-226010
Developer & Contact
Developer
Promoter NameM/s Shalimar Corp Ltd.
Promoter AddressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
Company TypeCompany
Mobile6390008015
Emailanoop.pandey@shalimar.org
Registered AddressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
Contractor AddressP-17, Seemant Nagat, Kalyanpur, Lucknow
Bank Accounts
Account Typecollection
Account Number57500001818274
Account NameShalimar Corp Ltd- Coll A/c- Shalimar Evara
Bank NameHDFC India
BranchPaiser Plaza, Lucknow Faizabad Road Naka Paiser, Barabanki
Branch AddressPaiser Plaza, Lucknow Faizabad Road Naka Paiser, Barabanki – 225001
Branch DistrictBarabanki
Branch StateUttar Pradesh
IFSCHDFC0000658
Branch Emailashish.kesherwani@hdfcbank.com
Account Typeseparate
Account Number57500001818070
Account NameShalimar Corp Ltd- Sep A/c- Shalimar Evara
Bank NameHDFC India
BranchPaiser Plaza, Lucknow Faizabad Road Naka Paiser, Barabanki – 225001
Branch AddressPaiser Plaza, Lucknow Faizabad Road Naka Paiser, Barabanki – 225001
Branch DistrictBarabanki
Branch StateUttar Pradesh
IFSCHDFC0000658
Account Typetransaction
Account Number57500001817551
Account NameShalimar Corp Ltd- Trans A/c- Shalimar Evara
Bank NameHDFC India
BranchPaiser Plaza, Lucknow Faizabad Road Naka Paiser, Barabanki – 225001
Branch AddressPaiser Plaza, Lucknow Faizabad Road Naka Paiser, Barabanki – 225001
Branch DistrictBarabanki
Branch StateUttar Pradesh
IFSCHDFC0000658
Development & Facilities
Development works
Demarcation Of PlotsThe total project land admeasuring 41745.83 Sqmt has been systematically demarcated into 146 residential plots in accordance with the sanctioned layout plan approved by the competent authority. The plots are laid out with proper survey reference points, internal road network, and service corridors. Each plot is clearly identified with a unique number and defined boundaries, with plot sizes ranging approximately from 100-150 sqmt., 150-200 sqmt. to 200-260 sqmt. The demarcation has been carried out as per the approved drawings to ensure clarity of ownership, access, and uniform development of the township. Site is surronded by other plots on one side and one side by promotors plot.
Boundary Wall2.1m high and 230 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.
Road WorkTrimix / asphalt road will be used as per deisgn suggested by the Architect for internal road.From the main entrance gate we have road of 630 mm of different layers with 30 mm bituminous coating on top through out the project,whose wideness starts from 30 mts.
FootpathsAll internal roads will have narrow footpath with pavers or equivalent finishes as per landscape design. Well-designed pedestrian footpaths are provided along the project’s internal roads and site periphery to ensure safe and convenient movement. The footpaths are constructed with non-slip, durable paver blocks over a compacted base, maintaining adequate width as per local development authority norms. Proper gradient and drainage are ensured to prevent waterlogging.
Water Supply Including Drinking Water FacilitiesThe potable water supply of desired quality & purity shall be ensured through pressurized distribution network connceted with undergound/overhead tanks. Drinking water ishall be sourced from an approved municipal connection or borewell.
Sewer SystemCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatement.Proper provision of sewer lines has been provided
DrainStorm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with Municiple drain line.
ParksAs per the sanctioned layout plan, adequate area within the project has been earmarked for parks and open spaces. There 4 pockets of green parcel for landscaped gardens, including sports center ,green belts, and children’s play areas are provided for the benefit of the allottees. These open spaces form an integral part of the township development and shall be maintained in accordance with the approved plan.
Tree PlantingThe trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view.
Design For Electric Supply Including Street LightingAll the workings shall confer to Bureau Of Indian Standards , Indian Electricity Rules & Indian Electricity Acts.Total Load of 1100 KVA shall be supplied from neares sub station of comptetent auhtority. 200KVA power back up DG shall also be provided.
Community BuildingsCommon community building is proposed with facilities viz. gym, poom, indoor games etc.
Treatment And Disposal System Of Sewage And Sullage WaterCentralized Sewerage system fo all plots shall be connected to STP . All Sewerage water shall go to the STP for treatment after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system. 166 KLD STP of MMBR techonolgy is proposed.
Solid Waste Management And Disposal SystemProject shall have waste segregation area. The solid waste shall be encouraged for segregation. Dustbins shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal. 312 Kg solid waste managment plant is proposed for township.
Water Conservation SystemA well designed rain water harvesting system/ water storage tank shall be provided for the whole complex to conserve water. 1 no. of rain water storage ponds are proposed.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. Also timer controlled panels shall be used for efficient energy management
Fire Protection And Fire Safety SystemAll Fire norms shall be followed as per NBC Part 4 code and approval of fire department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesProper provision fo social infra and public amenities provided.Necessary linkages with external civic infrastructure, including access to nearby educational institutions, healthcare facilities, and public transport, have been duly considered to ensure a self-sustainable and safe living environment for all residents
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)211000
Project Duration (months)34