Shere`s Shalimar Mannat Extension-3
by M/s Shalimar Corp Ltd.
Barabanki, Uttar Pradesh · UPRERAPRJ555231
Total units
160
Overview
Registration Date2022-07-14
RERA NumberUPRERAPRJ555231
Promoter IDUPRERAPRM4092
Proposed Start2022-10-20
Proposed Completion2026-10-19
Location
DistrictBarabanki
TehsilNawabganj
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units160
Unit Types3
Blocks4
Floors11
Khasra records (1)
- 52, 53, 54, 55, 59, 131· Khasra· 11483 m²
Inventory
Apartments (84 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| TOWER-M1 | GF | OTHER | 0 | 0 | 0 | — |
| TOWER-M1 | 1 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-M1 | 1 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M1 | 2 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-M1 | 2 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M1 | 3 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-M1 | 3 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M1 | 4 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-M1 | 4 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M1 | 5 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-M1 | 5 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M1 | 6 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-M1 | 6 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M1 | 7 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-M1 | 7 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M1 | 8 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-M1 | 8 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M1 | 9 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-M1 | 9 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M1 | 10 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-M1 | 10 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M2 | GF | OTHER | 0 | 0 | 0 | — |
| TOWER-M2 | 1 | 2 BHK | 2 | 69.7 | 3 | — |
| TOWER-M2 | 1 | 2 BHK | 2 | 70.27 | 3 | — |
| TOWER-M2 | 2 | 2 BHK | 2 | 69.7 | 3 | — |
| TOWER-M2 | 2 | 2 BHK | 2 | 70.27 | 3 | — |
| TOWER-M2 | 3 | 2 BHK | 2 | 69.7 | 3 | — |
| TOWER-M2 | 3 | 2 BHK | 2 | 70.27 | 3 | — |
| TOWER-M2 | 4 | 2 BHK | 2 | 69.7 | 3 | — |
| TOWER-M2 | 4 | 2 BHK | 2 | 70.27 | 3 | — |
| TOWER-M2 | 5 | 2 BHK | 2 | 69.7 | 3 | — |
| TOWER-M2 | 5 | 2 BHK | 2 | 70.27 | 3 | — |
| TOWER-M2 | 6 | 2 BHK | 2 | 69.7 | 3 | — |
| TOWER-M2 | 6 | 2 BHK | 2 | 70.27 | 3 | — |
| TOWER-M2 | 7 | 2 BHK | 2 | 69.7 | 3 | — |
| TOWER-M2 | 7 | 2 BHK | 2 | 70.27 | 3 | — |
| TOWER-M2 | 8 | 2 BHK | 2 | 69.7 | 3 | — |
| TOWER-M2 | 8 | 2 BHK | 2 | 70.27 | 3 | — |
| TOWER-M2 | 9 | 2 BHK | 2 | 69.7 | 3 | — |
| TOWER-M2 | 9 | 2 BHK | 2 | 70.27 | 3 | — |
| TOWER-M2 | 10 | 2 BHK | 2 | 69.7 | 3 | — |
| TOWER-N1 | GF | OTHER | 0 | 0 | 0 | — |
| TOWER-N1 | 1 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N1 | 1 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N1 | 2 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N1 | 2 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N1 | 3 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N1 | 3 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N1 | 4 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N1 | 4 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N1 | 5 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N1 | 5 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N1 | 6 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N1 | 6 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N1 | 7 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N1 | 7 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N1 | 8 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N1 | 8 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N1 | 9 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N1 | 9 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N1 | 10 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N1 | 10 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N2 | GF | OTHER | 0 | 0 | 0 | — |
| TOWER-N2 | 1 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N2 | 1 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N2 | 2 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N2 | 2 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N2 | 3 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N2 | 3 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N2 | 4 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N2 | 4 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N2 | 5 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N2 | 5 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N2 | 6 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N2 | 6 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N2 | 7 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N2 | 7 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N2 | 8 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N2 | 8 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N2 | 9 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N2 | 9 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-N2 | 10 | 3 BHK | 2 | 87.57 | 3 | — |
| TOWER-N2 | 10 | 3 BHK | 2 | 88.15 | 3 | — |
| TOWER-M2 | 10 | 2 BHK | 2 | 69.7 | 3 | — |
Permits & Approvals
Permit No71/2022
Permit Date2022-05-31
Valid Until2027-05-30
Extendable Until2030-05-30
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2022-07-07)View
- Commencement Certificate#New(2022-06-14)View
- Other Plan(If Any)#New(2022-07-06)View
- Proforma of Application Form#New(2022-06-14)View
- Proforma of Allotment Letter#New(2022-06-14)View
- Proforma of Conveyance Deed#New(2022-06-14)View
- Waste Disposal Plan#New(2022-07-07)View
- Water Supply Plan#New(2022-07-07)View
- Electricity Supply Plan#New(2022-06-14)View
- Development Work Plan#New(2022-06-14)View
- Affidavit (Form-B)#New(2022-06-14)View
- CA CERTIFICATE#New(2022-07-07)View
- ARCHITECT CERTIFICATE#New(2022-07-07)View
- ENGINEERS CERTIFICATE#New(2022-07-07)View
- Other#New(2022-07-07)View
Land documents
- Registry Document#16425(2015-09-02)View4891478420Developer Agreement.pdf
- Registry Document#10817(2021-06-19)View4891476638Builder_Agreement_2.pdf
- Extract of Khatauni#Khatauni extracts of all khasra-highlighted(1900-01-01)View4891472040Khasra Khatauni extracts-Mannat Ext-3.pdf
- Extract of Khatauni#Reply to objection letter(1900-01-01)View4891478707Reply of Objection Letter M&N Dt. 06.07.2022.pdf
- Extract of Khatauni#Land area details - Mannat Ext-3(1900-01-01)View4891479326Land Area Chart-Mannat Ext-3.pdf
- Extract of Khatauni#Super imposed khasra map of Mannat Ext-3(1900-01-01)View4891478985Super imposed map of Mannat Ext-3.pdf
Project Team
Architect AddressC-67, Defense Colony, New Delhi
Engineer AddressShalimar Corporate Park, Vibhuti Khand, Gomti Nagar, Lucknow-226010
Developer & Contact
Developer
Promoter NameM/s Shalimar Corp Ltd.
Promoter AddressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
Company TypeCompany
Mobile6390008015
Emailanoop.pandey@shalimar.org
Registered AddressA2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029.
Contractor Address4th Floor, 423, Parsvnath Planet Plaza, Vibhuti Khand, Gomti Nagar, Lucknow-226010
Bank Accounts
Account Typecollection
Account Number41045160886
Account NameShalimar Corp. Ltd - Coll A/c - Shere`s Shalimar Mannat Extension-3
Bank NameState Bank of India
BranchSafedabad Branch, Barabanki
Branch AddressSafedabad Branch, Faizabad Road, Barabanki
Branch DistrictBarabanki
Branch StateUttar Pradesh
IFSCSBIN0014445
Account Typeseparate
Account Number41045166221
Account NameShalimar Corp. Ltd - Sep A/c - Shere`s Shalimar Mannat Extension-3
Bank NameState Bank of India
BranchSafedabad Branch, Barabanki
Branch AddressSafedabad Branch, Faizabad Road, Barabanki
Branch DistrictBarabanki
Branch StateUttar Pradesh
IFSCSBIN0014445
Account Typetransaction
Account Number41045170419
Account NameShalimar Corp. Ltd - Trans A/c - Shere`s Shalimar Mannat Extension-3
Bank NameState Bank of India
BranchSafedabad Branch, Barabanki
Branch AddressSafedabad Branch, Faizabad Road, Barabanki
Branch DistrictBarabanki
Branch StateUttar Pradesh
IFSCSBIN0014445
Development & Facilities
Development works
Demarcation Of PlotsAs per sanction plan this is rectangular plot. Having total 1 no. of entry gate and 1 no. of exit gate from the 18m wide road ,Site is surrounded by other plots on one side and one side by promoters plot.
Boundary Wall1.8 - 2.1m high and 200 mm thick Boundry wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary .
Road WorkTrimix / asphalt road will be used as per design suggested by the Architect for internal road.
FootpathsAll Internal roads will have narrow footpath with pavers or equivalent finishes as per landscape design.
Water Supply Including Drinking Water FacilitiesAll apartments shall be provided with domestic water for household activities and STP treated water for flushing. Clear water may also be used and user can have their individual RO system as per their requirements. The STP treated water shall also be supplied for irrigation purposes . For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.
Sewer SystemCentralized Sewerage system shall be Provided. All Sewarge water shall be go to the STP for treatment . after treatment , water shall be recycled and it will use in gardening. flush tanks and vehicle washing , overflow from the STP shall be connect with the Municiple sewarage system.
DrainStorm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for Recharge the ground water and overflow shall be connect with Municiple drain line .
ParksThere are significant green area beside building including green parks, play areas for childrens and different recretional activities.
Tree PlantingThe trees of category ornamental , shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintain greenary and natural view.
Design For Electric Supply Including Street LightingWe have designed the system as per local electricity Board and consider centralized Transformer , HT panel , LT panel , Feeder Pillar and DG back for common service like External lighting with timer control , STP , Pump Room Etc.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterCentralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for tretement after treatment , water shall be recycle and it will use in gardening , flush tank and vehicle washing , overflow from the STP shall be connect with the Municiple sewarage system.
Solid Waste Management And Disposal SystemProject shall have waste segregation area . The solid waste shall be encouraged for segregation. Dustbin shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal.
Water Conservation SystemA well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor . also timer controlled panels shall be used for efficient energy management .
Fire Protection And Fire Safety SystemAll fire norms shall be followed as per NBC Part 4 Code and approval of fire department fire sprinklers , FHC with pumps are provided as per norms .
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFire Staricase is provided in the each building , basements have access and exit in case of emergency . Dedicated assembly areas defined in the campus . Adedquate signage is also provided.
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)62500
Project Duration (months)48