Registered
Total units
141
Overview
Registration Date2017-07-28
RERA NumberUPRERAPRJ3298
Promoter IDUPRERAPRM1662
Proposed Start2014-11-01
Proposed Completion2022-10-31
Location
DistrictKanpur Nagar
TehsilKanpur
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeOngoing
Total Units141
Unit Types6
Blocks1
Floors24
Khasra records (1)
- Plot No. GH-1, Vinayak Shree NRI City, Kanpur· Plot· 3762 m²
Inventory
Apartments (95 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| A8 | 1 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 1 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 1 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 2 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 2 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 2 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 3 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 3 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 3 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 4 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 4 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 4 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 5 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 5 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 5 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 6 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 6 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 6 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 7 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 7 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 8 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 8 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 8 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 9 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 9 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 9 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 10 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 10 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 10 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 11 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 11 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 11 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 12 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 12 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 12 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 13 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 13 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 13 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 14 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 14 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 14 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 15 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 15 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 15 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 16 | 5 BHK | 2 | 236.1 | 5 | 0 |
| A8 | 16 | 5 BHK | 2 | 253.6 | 5 | 0 |
| A8 | 16 | OTHER | 2 | 285.6 | 4 | 0 |
| A8 | 17 | 5 BHK | 1 | 326.3 | 4 | 0 |
| A8 | 17 | 5 BHK | 1 | 328.39 | 4 | 0 |
| A8 | 17 | 4 BHK | 1 | 263.84 | 4 | 0 |
| A8 | 17 | 4 BHK | 1 | 264.04 | 4 | 0 |
| A8 | 17 | 4 BHK+ STUDY | 1 | 317.46 | 5 | 0 |
| A8 | 17 | 4 BHK+STUDY | 1 | 317.17 | 5 | 0 |
| A8 | 18 | 5 BHK | 1 | 326.3 | 4 | 0 |
| A8 | 18 | 5 BHK | 1 | 328.39 | 4 | 0 |
| A8 | 18 | 4 BHK | 1 | 263.84 | 4 | 0 |
| A8 | 18 | 4 BHK | 1 | 264.04 | 4 | 0 |
| A8 | 18 | 4 BHK+ STUDY | 1 | 317.46 | 5 | 0 |
| A8 | 18 | 4 BHK+STUDY | 1 | 317.17 | 5 | 0 |
| A8 | 19 | 5 BHK | 1 | 326.28 | 4 | 0 |
| A8 | 19 | 5 BHK | 1 | 327.83 | 4 | 0 |
| A8 | 19 | 4 BHK | 1 | 264.46 | 4 | 0 |
| A8 | 19 | 4 BHK | 1 | 264.04 | 4 | 0 |
| A8 | 19 | 4 BHK+ STUDY | 1 | 326 | 5 | 0 |
| A8 | 19 | 4 BHK+STUDY | 1 | 316.49 | 5 | 0 |
| A8 | 20 | 5 BHK | 1 | 326.28 | 4 | 0 |
| A8 | 20 | 5 BHK | 1 | 327.83 | 4 | 0 |
| A8 | 20 | REFUSE AREA | 0 | 0 | 0 | 0 |
| A8 | 20 | 4 BHK | 1 | 264.04 | 4 | 0 |
| A8 | 20 | 4 BHK+ STUDY | 1 | 317.46 | 5 | 0 |
| A8 | 20 | 4 BHK+STUDY | 1 | 316.91 | 5 | 0 |
| A8 | 21 | 5 BHK | 1 | 326.28 | 4 | 0 |
| A8 | 21 | 5 BHK | 1 | 327.83 | 4 | 0 |
| A8 | 21 | 4 BHK | 1 | 264.46 | 4 | 0 |
| A8 | 21 | 4 BHK | 1 | 264.04 | 4 | 0 |
| A8 | 21 | 4 BHK+ STUDY | 1 | 326 | 5 | 0 |
| A8 | 21 | 4 BHK+STUDY | 1 | 316.49 | 5 | 0 |
| A8 | 22 | 5 BHK | 1 | 326.28 | 4 | 0 |
| A8 | 22 | 5 BHK | 1 | 327.83 | 4 | 0 |
| A8 | 22 | 4 BHK | 1 | 264.46 | 4 | 0 |
| A8 | 22 | 4 BHK | 1 | 264.04 | 4 | 0 |
| A8 | 22 | 4 BHK+ STUDY | 1 | 326 | 5 | 0 |
| A8 | 22 | 4 BHK+STUDY | 1 | 316.49 | 5 | 0 |
| A8 | 23 | 5 BHK | 1 | 326.28 | 4 | 0 |
| A8 | 23 | 5 BHK | 1 | 327.83 | 4 | 0 |
| A8 | 23 | 4 BHK | 1 | 264.46 | 4 | 0 |
| A8 | 23 | 4 BHK | 1 | 264.04 | 4 | 0 |
| A8 | 23 | 4 BHK+ STUDY | 1 | 326 | 5 | 0 |
| A8 | 23 | 4 BHK+STUDY | 1 | 316.49 | 5 | 0 |
| A8 | 24 | 5 BHK | 1 | 326.28 | 4 | 0 |
| A8 | 24 | 5 BHK | 1 | 327.83 | 4 | 0 |
| A8 | 24 | 4 BHK | 1 | 264.46 | 4 | 0 |
| A8 | 24 | 4 BHK | 1 | 264.04 | 4 | 0 |
| A8 | 24 | 4 BHK+ STUDY | 1 | 326 | 5 | 0 |
| A8 | 24 | 4 BHK+STUDY | 1 | 316.49 | 5 | 0 |
Permits & Approvals
Permit No942/BHAWAN/2011-2012
Permit Date2017-11-02
Valid Until2022-11-01
Extendable Until2025-11-01
Revalidated Permit942/BHAWAN/2011-2012
Documents
Filing documents
- Other Plan(If Any)#New(2018-07-04)View
- Affidavit (Form-B)#New(2019-08-20)View
- Legal Document of Agreement in Case of other Land#Old(2017-10-14)View
- Legal Document of Agreement in Case of other Land#Old(2017-10-14)View
- Legal Document of Agreement in Case of other Land#Old(2017-10-14)View
- Authentic copy of Approval of Project#Old(2017-10-14)View
Land documents
- Registry Document#Book No. I, Vol 7114 Pages 387 to 430(2015-03-29)View32982950Shreesri BPL 1696 SB.PDF
Project Team
Architect AddressOffice No. 4. 14/145, First Floor, Commerce Center, Chunniganj, Kanpur
Engineer Address132, Mithila Apartments, 76, I. P. Ext, Delhi
Developer & Contact
Developer
Promoter NameSHREESRI BUILDTECH PRIVATE LIMITED
Promoter Address6926,Jaipuria Mills ,Clock Tower Sabji Mandi, Delhi
Company TypeCompany
Mobile9839907931
Emailaccounts@nriheights.com
Registered Address6926,Jaipuria Mills ,Clock Tower Sabji Mandi, Delhi
Contractor Address16K, Ramdhan Colony, Bahadrabad, Haridwar
Development & Facilities
Development works
Demarcation Of PlotsAlready Completed
Boundary WallTemporary Boundary Wall is already present at the sitee. However, permanent boundary wall made of ACC block and RCC is under construction At the center face of boundary wall there would be a Logo of Sky Bungalow which give a beautiful iconic design to boundary wall.
Road WorkApproach road from the main gate of NRI City to the project site is well developed. Internal roads are already demarcated and shall be develpoed at appropriate stage of the project
FootpathsInterlock footpath at both side of the apporach road with beautiful pattern is already developed
Water Supply Including Drinking Water FacilitiesProject shall rely for drinking water supply through bore well as well as through Municipal Corporation.
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
Parks1 main park nearby temple having kids play area is already developed. One more park is proosed to be developed at the appropriate stage of the project
Tree PlantingMore than 300 trees have already been planted. However, more tree plantation is in process
Design For Electric Supply Including Street LightingDesigning of Electrc supply including street lighting is already being done.
Community BuildingsIt shall be developed at appropriate stage of the project
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.
Solid Waste Management And Disposal System"There are a proper garbage collection area provided for the solid waste management."
Water Conservation SystemWe are providing Fitting and fixtures having low outflow of water as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use LED lights Fitting.
Fire Protection And Fire Safety SystemProject hall have fire protection and fire safety system as per regulatory norms
Social Infrastructure And Other Public Amenities Including Public Health Services"Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room. All Sewerage shall be go to the STP. Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain."
Emergency Evacuation ServicesProject shall have emergency evacuation plan as per the requirement of regulatory authorities
Other Miscellaneous WorkNil
Financials
Registration Fee (₹)24000
Project Duration (months)143