South City Extension Phase-III

by VASUDEVAM DEVELOPERS

Shahjahanpur, Uttar Pradesh · UPRERAPRJ205011

Registered

Overview

Registration Date2023-01-17
RERA NumberUPRERAPRJ205011
Promoter IDUPRERAPRM207274
Proposed Start2022-09-01
Proposed Completion2027-08-30

Location

DistrictShahjahanpur
TehsilShahjahanpur
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Plots42

Khasra records (1)

  • 209· Khasra· 4661

Inventory

Plots

TypeSize rangeCount
Plot100 to 150 sqm42

Permits & Approvals

Permit No81/2022-23
Permit Date2022-08-31
Valid Until2027-08-30
Extendable Until2030-08-30

Documents

Filing documents

  • Other Plan(If Any)
  • Proforma of Completion Certificate(Occupancy)
  • Details of Encumbrances#New(2022-11-21)
    View
  • Commencement Certificate#New(2022-11-21)
    View
  • Proforma of Application Form#New(2022-11-21)
    View
  • Proforma of Allotment Letter#New(2022-11-21)
    View
  • Proforma of Conveyance Deed#New(2022-11-21)
    View
  • Waste Disposal Plan#New(2022-11-21)
    View
  • Water Supply Plan#New(2022-11-21)
    View
  • Electricity Supply Plan#New(2022-11-21)
    View
  • Development Work Plan#New(2022-11-21)
    View
  • Affidavit (Form-B)#New(2022-11-21)
    View
  • CA CERTIFICATE#New(2023-01-05)
    View
  • ARCHITECT CERTIFICATE#New(2022-11-21)
    View
  • ENGINEERS CERTIFICATE#New(2022-12-19)
    View
  • Other#New(2022-11-21)
    View

Land documents

  • Registry Document#6315(2022-04-26)
    6139806316Registered Consortium Agreement.pdf
    View
  • Extract of Khatauni#Khatauni Extract of Khasra 209(1900-01-01)
    6139803434Khatuni 209.pdf
    View
  • Extract of Khatauni#Partnership Deed showing Land contributed as Capital in the Firm by Partners(1900-01-01)
    6139804813Partnership Deed_R L Infra.pdf
    View
  • Extract of Khatauni#Judgment regarding land contribution by Partners into the Partnership Firm as Capital(1900-01-01)
    6139809441Judgment regarding contributing land by partners in the Partnership Firm.pdf
    View

Project Team

Architect AddressShahjahanpur
Engineer AddressShahjahanpur

Developer & Contact

Developer

Promoter NameVASUDEVAM DEVELOPERS
Promoter AddressQ1 Kunj Bihar Colony South City Ext, Shahjahanpur
Company TypePartnership Firm
Mobile9648901350
Emailvasudevam2022@gmail.com
Registered AddressQ1 Kunj Bihar Colony South City Ext, Shahjahanpur
Contractor AddressShahjahanpur

Bank Accounts

Account Typecollection
Account Number06460200001370
Account NameVASUDEVAM DVLPS COL AC SOUTH CITY E PH III
Bank NameBANK OF BARODA
BranchCHOWK MANDI SHAHJAHANPUR
Branch AddressCHOWK MANDI SHAHJAHANPUR
Branch DistrictShahjahanpur
Branch StateUttar Pradesh
IFSCBARB0SHAHJA
Account Typeseparate
Account Number06460200001375
Account NameVASUDEVAM DVLPS SEP AC SOUTH CITY E PH III
Bank NameBANK OF BARODA
BranchCHOWK MANDI SHAHJAHANPUR
Branch AddressCHOWK MANDI SHAHJAHANPUR
Branch DistrictShahjahanpur
Branch StateUttar Pradesh
IFSCBARB0SHAHJA
Account Typetransaction
Account Number06460200001376
Account NameVASUDEVAM DVLPS TRAN AC SOUTH CITY E PH III
Bank NameBank of Baroda
BranchCHOWK MANDI SHAHJAHANPUR
Branch AddressCHOWK MANDI SHAHJAHANPUR
Branch DistrictShahjahanpur
Branch StateUttar Pradesh
IFSCBARB0SHAHJA

Development & Facilities

Development works

Demarcation Of PlotsWe have total 42 plots of different sizes, from 107.77 sq. mtr to 117.30 sq. mtr in this phase of the project.
Boundary WallBoundary wall is proposed as part of the project.
Road WorkFrom the main entrance gate, we have proposed CC road work throughout the entire project whose wideness ranges between 7.5 mtr to 9 mtr, as approved by the prescribed authority, Shahjahanpur
FootpathsNot proposed.
Water Supply Including Drinking Water FacilitiesWater Tanks shall be provided for water supply.
Sewer SystemSewerage System shall be provided. All sewerage water shall be connected with the nearest Municipal Line.
DrainDrains shall be connected with all units, and all link drains shall be connected with the main drain, which shall be connected with the nearest Municipal drain.
Parks1413.69 sq. mtr. green areas is proposed throughout the whole project.
Tree PlantingWe will provide many types of trees in the entire project site.
Design For Electric Supply Including Street LightingWe will design and implement the system as per local electricity board and will consider centralized transformer, HT Panel, LT Panel, Feeder Pillar, etc.
Community BuildingsNot proposed
Treatment And Disposal System Of Sewage And Sullage WaterSewerage system shall be provided. All sewerage water shall be connected with the nearest Municipal Line.
Solid Waste Management And Disposal SystemThere are a proper garage collection area provided for the solid waste management as per Municipal Guidelines.
Water Conservation SystemWe will suggest individual to use low flow fixture as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyNot proposed
Fire Protection And Fire Safety SystemAs the project is a plotted development, for fire fighting facility , individual owner can install their own system as per their need and local authority requirements.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot proposed
Emergency Evacuation ServicesAs the project is a plotted development, individuals will take care of this at their own level.
Other Miscellaneous WorkNot proposed

Financials

Registration Fee (₹)28500
Project Duration (months)60