4

Overview

Registration Date2025-02-18
RERA NumberUPRERAPRJ118943/02/2025
Promoter IDUPRERAPRM294236
Proposed Start2024-12-10
Proposed Completion2027-03-27

Location

DistrictLucknow
TehsilSarojini Nagar
VillageVRINDAVAN YOJNA
LocalityLUCKNOW
AddressPLOT NO. 12-A/CP-8 & CP-9, VRINDAVAN YOJNA NO. 3
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units4
Unit Types1
Blocks1
Floors4

Khasra records (1)

  • 12-A/CP-09 CP-08· Plot· 1515

Inventory

Apartments (4 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
1BSMNTSHOP1519.30
1GFSHOP1600.290
11SHOP1320.030
12SHOP1320.030

Permits & Approvals

Permit NoCommercial Building/08696/UPAVP/BP/23-24/1871/2182024
Permit Date2024-03-28
Valid Until2027-03-27
Extendable Until2028-03-27

Documents

Filing documents

  • Details of Encumbrances
  • Commencement Certificate
  • Other Plan(If Any)
  • Proforma of Conveyance Deed
  • Proforma of Conveyance Deed
  • Proforma of Completion Certificate(Occupancy)
  • CA CERTIFICATE
  • CA CERTIFICATE
  • Other
  • Other
  • Other
  • Other
  • Other
  • Other
  • Proforma of Agreement for Sale
  • Proforma of Agreement for Sale
  • Proforma of Agreement for Sale
  • Details of Encumbrances#New(2025-01-03)
    View
  • Other Plan(If Any)#New(2025-02-18)
    View
  • Proforma of Application Form#New(2024-12-06)
    View
  • Proforma of Allotment Letter#New(2024-12-06)
    View
  • Proforma of Conveyance Deed#New(2025-02-07)
    View
  • Waste Disposal Plan#New(2024-12-06)
    View
  • Water Supply Plan#New(2024-12-06)
    View
  • Electricity Supply Plan#New(2024-12-06)
    View
  • Development Work Plan#New(2024-12-06)
    View
  • Affidavit (Form-B)#New(2024-12-23)
    View
  • CA CERTIFICATE#New(2025-02-06)
    View
  • ARCHITECT CERTIFICATE#New(2024-12-06)
    View
  • ENGINEERS CERTIFICATE#New(2024-12-06)
    View
  • Other#New(2025-02-04)
    View
  • Proforma of Agreement for Sale#New(2025-02-06)
    View

Land documents

  • Registry Document#14349/14345(2017-09-26)
    13518736267.pdf
    View

Project Team

Architect AddressFirst floor Halwasiya Court, Hazratganj, Lucknow
Engineer AddressCivil Engineer,N 1/65-C-6 SEVA UPVAN COLONY, SAMNEGHAT VARANASI UTTAR PRADESH

Developer & Contact

Developer

Promoter NameSYMTECH DEVELOPERS
Promoter AddressShop No 5, Basement , 6A Leela Mansion Building, Hazratganj , Lucknow, Uttar Pradesh 226001
Company TypePartnership Firm
Mobile9415461985
Emailpradeepagarwal0011@gmail.com
Registered AddressShop No 5, Basement , 6A Leela Mansion Building, Hazratganj , Lucknow, Uttar Pradesh 226001
Contractor AddressPlot 12-A/CP-8 CP-9, VRINDAVAN YOJNA LUCKNOW

Bank Accounts

Account Typecollection
Account Number680322410000002
Account NameSymtech Developers Collection Account for Sparsh Gateway
Bank NameBank Of India
BranchAishbagh, Lucknow
Branch AddressAishbagh, LUcknow
Branch DistrictLucknow
Branch StateSelect
IFSCBKID0006803
Branch EmailAishbagh.Lucknow@bankofindia.co.in
Account Typeseparate
Account Number680322410000005
Account NameSymtech Developers Separate Account for Sparsh Gateway
Bank NameBank Of India
BranchAishbagh, Lucknow
Branch AddressAishbagh, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCBKID0006803
Account Typetransaction
Account Number680322410000006
Account NameSymtech Devolpers RERA Transaction Account for Sparsh Gateway
Bank NameBank Of India
BranchAishbagh, Lucknow
Branch AddressAishbagh, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCBKID0006803

Development & Facilities

Development works

Demarcation Of PlotsWe have one net plot area of size 1515 sqm , having 2 main entrance and 2 exit gate from the front road, Demarcated by its boundaries -North - 31.20 m , South - 31.50 m, East - 27.80 m, West - 27.50 m
Boundary Wall6 feet height and 230mm thick rcc/ms 1 section work which give a beautiful iconic design boundary wall to be made with 4 number of gates.
Road WorkFROM THE MAIN ENTRANCE /EXIT GATE WE HAVE 100MM THICK , 6 MTR WIDE RCC ROAD THROUGH OUT THE PROJECT.
FootpathsWE WOULD PROVIDE FOOTHPATH THROUGH 5 FEET WIDE CC .
Water Supply Including Drinking Water FacilitiesOVERHEAD TANK (15000 LITRES), BOREWELL, GOVERNMENT WATER SUPPLY . EACH FLOOR WILL HAVE SEPARATE DRINKING WATER FACILITIES. WE WILL PROVIDE PUMPS FOR THE REQUIREMENTS OF BLOCKS THROUGH PIPELINES.
Sewer System4 INCH PVC PIPELINE CONNECTED WITH 6INCH PIPELINE TO MAN HOLES. MODULAR SEWERAGE SSYETM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND SFTER TERATMENTS RE-USE IN FLUSH AND GARDEN . OVERFLOW FROM THE STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSYTEM. WHEN COME INTO FORCE..
DrainRECHARGE WELL AND WASTE WATER PIPELINE TO BE CONNECT IN NEARBY GOVERNMENT PROVIDED MAIN HOLE. STORM WATER SHALL BE PROVIDED. STORM WATER FROM TERACES, ROADS, AND OTHER LANDSCAPE AREA SHALL BE CONNECT TO THE STORM WATER DRAIN CHANNEL AND GO TO THE RAIN WATER HARVESTING PIT FOR RECHARGE THE GROUND WATER AND OVERFLOW SHALL E CONNECT WITH MUNICIPAL DRAIN LINE.
ParksNA
Tree PlantingWE WILL PROVIDE 4 NUMBER TREES ALL ALONG THE BOUNDARY WALL AND GREEN AREA.
Design For Electric Supply Including Street LightingELECTRICITY SUPPLY WILL BE PROVIDED AS PER SERVICE DRAWINGS , STREET LIGHTING NOT REQUIRED.WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED , TRANSFORMER, HT PANEL, LT PANEL, FEEDER PILLER AND DG BACK FOR COMMON SERVICES LIKE EXTERNAL LIGHTING, FOUNTAIN, STP, PUMP ROOM ETC.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterAS PER SERVICE PLAN TO BE CONNECT INTO GOVERNMENT AVAILED SEWER LINE. MODULAR SEWERAGE SYSTEM SHALL BE PROVIDED. ALL SEWERAGE WATER SHALL BE GO TO THE STP AND SFTER TREATMENT RE-USE IN FLUSH . OVERFLOW FROM STP SHALL BE CONNECT WITH THE MUNICIPAL SEWERAGE SYSTEM. WHEN COME INTO FORCE.
Solid Waste Management And Disposal SystemTO BE PROVIDED AS PER GOVERNMENT GUIDELINES. SOLID WASTE TO BE COLLECTED FROM STORED IN GARBAGE ROOM.
Water Conservation SystemWE WILL SUGGEST TO INDIVIDUAL TO USE LOW FLOW FIXTURES AS WELL DUAL FLUSH CISTERN AND RAW WATER HARVESTING SYSTEM WILL BE PROVIDED TO REDUCE THE WATER CONSUMPTION AND IMPROVE THE GROUND WATER LEVEL.
Energy Management System Including Use Of Renewable EnergyNA
Fire Protection And Fire Safety SystemPROVISIONAL NOC HAS BEEN RECEIVED FROM FIRE DEPARTMENT AND ALL PROVISIONS SHALL BE MADE AS PER PROVISIONAL NOC AND DRAWING SUBMITTED TO THE FIRE DEPARTMENT. FIRE FIGHTING SYSTEM, FA SYSTEM AS WILL BE PROVIDED LOCAL AUTHORITIES REQUIREMENT.
Social Infrastructure And Other Public Amenities Including Public Health ServicesTOILET BLOCK, CLENA DRINKING WATER, FIRSTAID BOX.
Emergency Evacuation ServicesWE WILL HAVE FIRE STAIRCASES WHICH WILL BE PROVIDED WITH EMERGENCY EXIT DOORS , SHALL BE PROVIDED AS PER FIRE DEPARTMENT PROVISIONAL NOC.
Other Miscellaneous WorkAt this stage all the development plans have already been shared above by us if there will be any further development it will be reported in future.

Financials

Registration Fee (₹)26000
Project Duration (months)28