Suncity Govind Sharnam
by SUNCITY HI-TECH PROJECTS PRIVATE LIMITED
Mathura, Uttar Pradesh · UPRERAPRJ585533/08/2024
Overview
Registration Date2024-08-26
RERA NumberUPRERAPRJ585533/08/2024
Promoter IDUPRERAPRM1698
Proposed Start2024-06-01
Proposed Completion2028-06-30
Location
DistrictMathura
TehsilMathura
VillageChatikara
AddressKhasara No. 393, Village - Chatikara, On Garud Govind Road, Mathura, Uttar Pradesh
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Plots144
Khasra records (1)
- 393· Khasra· 38193 m²
Inventory
Plots
| Type | Size range | Count |
|---|---|---|
| Plot | 100 to 150 sqm | 116 |
| Plot | 150 to 200 sqm | 26 |
| Plot | 200 to 250 sqm | 1 |
| Plot | Above 500 sqm | 1 |
Permits & Approvals
Permit NoPlotted Resi development/Plotted Housing/04076/MVDA/LD/23-24/0812/27102023
Permit Date2024-05-29
Valid Until2029-05-28
Extendable Until2030-05-28
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Affidavit (Form-B)
- Details of Encumbrances#New(2024-08-05)View
- Commencement Certificate#New(2024-06-04)View
- Other Plan(If Any)#New(2024-08-09)View
- Proforma of Application Form#New(2024-06-05)View
- Proforma of Allotment Letter#New(2024-06-05)View
- Proforma of Conveyance Deed#New(2024-06-05)View
- Waste Disposal Plan#New(2024-06-04)View
- Water Supply Plan#New(2024-06-04)View
- Electricity Supply Plan#New(2024-06-04)View
- Development Work Plan#New(2024-06-05)View
- Affidavit (Form-B)#New(2024-08-09)View
- CA CERTIFICATE#New(2024-08-05)View
- ARCHITECT CERTIFICATE#New(2024-06-05)View
- ENGINEERS CERTIFICATE#New(2024-06-05)View
- Other#New(2024-06-05)View
- Proforma of Agreement for Sale#New(2024-06-05)View
Project Team
Architect Address217, 2nd Floor, Suncity Business Tower, Sector 54, Gurugram-122001
Engineer AddressNA
Developer & Contact
Developer
Promoter NameSUNCITY HI-TECH PROJECTS PRIVATE LIMITED
Promoter AddressLGF-10,Vasant square ,Plot-A, Sector-B, Pocket-V, community centre ,Vasant kunj, New Delhi-110070
Company TypeCompany
Mobile9654128033
EmailINFO@SUNCITYPROJECTS.COM
Registered AddressLGF-10,Vasant square ,Plot-A, Sector-B, Pocket-V, community centre ,Vasant kunj, New Delhi-110070
Contractor Address1000, Radhika Vihar Phase 2, Mathura - 281004
Bank Accounts
Account Typecollection
Account Number101705001859
Account NameSuncity Hi-Tech Projects Pvt Ltd Collection Account For Suncity Govind Sharnam
Bank NameICICI Bank Limited
BranchVrindavan
Branch AddressICICI Bank Ltd. Common Building, Near Balaji Ashram, Raman Reti Road, Vrindavan - 281121
Branch DistrictMathura
Branch StateSelect
IFSCICIC0001017
Branch Emailravinde.s@icicibank.com
Account Typeseparate
Account Number101705001858
Account NameSuncity Hi-Tech Projects Pvt Ltd Separate Account For Suncity Govind Sharnam
Bank NameICICI Bank Limited
BranchVrindavan
Branch AddressICICI Bank Ltd, Common Building, Near Balaji Ashram, Raman Reti Road, Vrindavan - 281121
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCICICI0001017
Account Typetransaction
Account Number101705001857
Account NameSuncity Hi- Tech Projects Pvt Ltd Transaction Account For Suncity Govind Sharnam
Bank NameICICI Bank Limited
BranchVrindavan
Branch AddressICICI Bank Ltd, Common Building, Near Balaji Ashram, Raman Reti Road, Vrindavan-281121
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCICIC0001017
Development & Facilities
Development works
Demarcation Of PlotsResidential plots of different sizes, commercial plots as approved by the authority and detailed in the annexure are demarcated on ground.
Boundary WallNo boundary wall is being provided by the developer for the individual plots. The boundary wall will be constructed by the buyers.
Road WorkAll the main arteries will have flexible pavements with different thicknesses of base and sub-base courses depending upon the CBR value of the soil underneath. All sub-arteries with required design thickness bases on CBR value will be either flexible or rigid pavements.
FootpathsAll main artery roads and sub-artery roads will have footpaths in the shoulders and these footpaths will be finished with the material which will allow rain water percolation into the soil below.
Water Supply Including Drinking Water FacilitiesTill the time UP Jal Nigam will be in a position to spare water from their sources for this township, underground water will be drawn for supplying to consumers. The water demand is calculated as per the water supply manual of Ministry of Housing Urban Development, Government of India. The per capita consumption of water is considered as 135 lpcd and based on this demand and estimated population water requirement has been worked out. The water distribution in township will be under gravity only and HPDE / MDPE pipes will be used for distribution, ferrules will be provided for each house connection and a water meter will be installed on service line of each dwelling unit.
Sewer SystemSub-mains with provisions to link the disposal of each and every plot through chambers/ manholes will be laid in front of all the plots and these sub-mains will be connected to the manholes of trunk mains laid in the service corridors of the arterial and sub-arterial roads. The trunk mains will ultimately terminate into the STP where the sewerage will be treated and the residual water recycled into the township through a separate line and this water will be used for horticulture purposes and flushing purposes of high rise buildings. The total network will be of RCC spun pipes of NP2 / NP3 grade.
DrainDual network, one for roof top rain water connected to rainwater harvesting pits provided at different locations as per the design, and the overflow of rainwater harvesting pits will be connected to the external drainage network. The external drainage network will be provided to carry the road and plot run-offs and finally disposed off into the natural storm drains.
ParksAll the parks as proposed in the layout will be developed with provision for tot-lot areas, sports activity areas, lawns, jogging tracks and shrubs shady trees as per the design.
Tree PlantingThrees of different species will be planted on the periphery of the site and along roads . The species of the trees will be almost of the similar types which are already existing in the surrounding areas of our township.
Design For Electric Supply Including Street LightingThe source of power supply for township will be from UP Power Corporation Ltd. and network within the township will be laid by the developer, the network will be mainly underground both for HT as well as LT. The distribution will be 11 KVA and for this electrical sub-stations as per design will be erected in the township.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterThe sewerage and sullage water will be treated in STPs. The recycle water will be used for irrigation purposes.
Solid Waste Management And Disposal SystemGarbage bins and collection points have been proposed in the township. A tie-up with the local municipality for organizing solid waste disposal of this township along with its other municipal areas will be entered into.
Water Conservation SystemRainwater harvesting pit numbers and size based on the design at different locations will be provided in the township and only the overflow of these pits will be drained into natural nalahs. The recycled water from STPs will be used for irrigation purposes and flushing purposes to decrease the fresh water requirement of the township.
Energy Management System Including Use Of Renewable EnergyLED luminaires will be used in the township for lighting of roads and parks.
Fire Protection And Fire Safety SystemAs it is a township development, provisions have been made as per the National Building Code in the underground water tanks for the water required for fire fighting. Also, fire hydrants will be provided as per design, if required, on recycled water line so that in the event of emergency water can be drawn from these hydrants by the fire department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesAs it is a township development with parks and reasonably sized open areas so evacuation will not be a problem.
Other Miscellaneous WorkThe township is been developed with reasonably sized greens having neighborhood sports activities centre.
Financials
Registration Fee (₹)196000
Project Duration (months)49