Registered
Total units
111
Overview
Registration Date2022-09-02
RERA NumberUPRERAPRJ899584
Promoter IDUPRERAPRM186760
Proposed Start2022-08-31
Proposed Completion2027-08-29
Location
DistrictGhaziabad
TehsilGhaziabad
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units111
Unit Types2
Blocks3
Floors32
Khasra records (1)
- 3/SP-07· Plot· 685353 m²
Inventory
Apartments (79 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| 1D | 1 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 1 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 2 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 2 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 3 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 3 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 4 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 4 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 5 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 5 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 6 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 6 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 7 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 7 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 8 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 8 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 9 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 9 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 10 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 10 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 11 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 11 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 12 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 12 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 13 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 13 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 14 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 14 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 15 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 15 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 16 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 16 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 17 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 17 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 18 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 19 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 20 | 3 BHK | 1 | 113.34 | 5 | — |
| 1D | 21 | 3 BHK | 1 | 111.6 | 5 | — |
| 1D | 22 | 3 BHK | 1 | 113.34 | 5 | — |
| 1B | 1 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 2 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 3 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 4 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 5 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 6 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 7 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 8 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 9 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 10 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 11 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 12 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 13 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 14 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 15 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 16 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 17 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 18 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 19 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 20 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 21 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 22 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 23 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 24 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 25 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 26 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 27 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 28 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 29 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 30 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 31 | 3 BHK | 2 | 113.34 | 5 | — |
| 1B | 32 | 3 BHK | 2 | 113.34 | 5 | — |
| Commercial | GF | SHOP | 1 | 14.1 | 0 | 0 |
| Commercial | GF | SHOP | 1 | 14.1 | 0 | 0 |
| Commercial | GF | SHOP | 1 | 14.1 | 0 | 0 |
| Commercial | GF | SHOP | 1 | 14.1 | 0 | 0 |
| Commercial | GF | SHOP | 1 | 14.1 | 0 | 0 |
| Commercial | GF | SHOP | 1 | 14.1 | 0 | 0 |
| Commercial | GF | SHOP | 1 | 14.1 | 0 | 0 |
| Commercial | GF | SHOP | 1 | 11.985 | 0 | 0 |
Permits & Approvals
Permit NoHigh Risk/UPAVP/BP/21-22/1377/24032022
Permit Date2022-06-20
Valid Until2027-06-19
Extendable Until2030-06-18
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2022-08-02)View
- Commencement Certificate#New(2022-07-27)View
- Proforma of Application Form#New(2022-07-27)View
- Proforma of Allotment Letter#New(2022-07-27)View
- Proforma of Conveyance Deed#New(2022-07-27)View
- Waste Disposal Plan#New(2022-07-27)View
- Water Supply Plan#New(2022-07-27)View
- Electricity Supply Plan#New(2022-07-27)View
- Development Work Plan#New(2022-07-27)View
- Affidavit (Form-B)#New(2022-07-27)View
- CA CERTIFICATE#New(2022-07-27)View
- ARCHITECT CERTIFICATE#New(2022-07-27)View
- ENGINEERS CERTIFICATE#New(2022-07-27)View
- Other#New(2022-07-29)View
Land documents
- Registry Document#2539(2021-07-22)View5354434571Consortium_Registry_Document.pdf
Project Team
Architect AddressA6-1401, Gardenia AIMS, Glory, Sector 46, Noida
Engineer AddressChordia Engineering Consultancy Services, I 1738, LGF, Chitranjan Park, New Delhi-110019
Developer & Contact
Developer
Promoter NameTANDT INFRA BUILDERS PRIVATE LIMITED
Promoter AddressRTF-51, Royal Tower, Shipra Sun City, Indirapuram, Ghaziabad, Uttar Pradesh-201014
Company TypeCompany
Mobile9289429009
Emailtandtinfrabuilders@gmail.com
Registered AddressRTF-51, Royal Tower, Shipra Sun City, Indirapuram, Ghaziabad, Uttar Pradesh-201014
Contractor AddressKLT Constructions Pvt. Ltd., RTF-51, Royal Tower, Indirapuram, Ghaziabad, 201014
Bank Accounts
Account Typecollection
Account Number721705000277
Account NameTANDT INFRA BUILDERS PVT LTD COLLECTION A/C FOR THE BLUE
Bank NameICICI BANK
BranchChander Nagar, Ghaziabad
Branch AddressHall No. 3, Plot No. 1 and 2, Chander Nagar, Ghaziabad, 201011
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCICIC0007217
Account Typeseparate
Account Number721705000275
Account NameTANDT INFRA BUILDERS PVT LTD SEPARATE BANK A/C FOR THE BLUE
Bank NameICICI BANK
BranchChander Nagar, Ghaziabad
Branch AddressHall No. 3, Plot No. 1 and 2, Chander Nagar, Ghaziabad, 201011
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCICIC0007217
Account Typetransaction
Account Number721705000276
Account NameTANDT INFRA BUILDERS PVT LTD RERA TRANSACTION A/C FOR THE BLUE
Bank NameICICI BANK
BranchChander Nagar, Ghaziabad
Branch AddressHall No. 3, Plot No. 1 and 2, Chander Nagar, Ghaziabad, 201011
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCICIC0007217
Development & Facilities
Development works
Demarcation Of PlotsGroup Housing at Plot No. 3/ SP-07, Sector- 03, Siddharth Vihar, Ghaziabad, Uttar Pradesh, Total Plot Area= 9779.00 Square Meters.
Boundary Wall230 mm wide and 2.1 metre high earthquake resistant boundary wall of RCC/ Mild Steel/ Brick filled.
Road WorkAll roads in the complex will be in combination of concrete pavers of different colours, shape, thickness. Roads will be laid over 225 mm water bound macadam.
FootpathsAll footpath in the complex will be in combination of concrete pavers of different colours, shape and thickness of 65 mm and 80mm laid over 150 mm water bound macadam surface.
Water Supply Including Drinking Water FacilitiesPotable water supply from municipal water supply shall be collected in underground collection tank and pumped to overhead water tank. The supply of water to individual flats shall be from the said overhead water tanks.
Sewer SystemThe sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plant (STP) of the project, and treated water will be used for irrigation and flushing purpose.
DrainDrains having a minimum width of 150 mm will be provided for collection and channelization of rain water (surface run off).
ParksInternal park will be provided and maintained. The parks will have jogging tracks, children play area and sitting areas.
Tree PlantingThe tress will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Tress will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project.
Design For Electric Supply Including Street LightingElectric supply provided through 11/0.433 KV transformers and by DG set supply for backup.
Community BuildingsNot Applicable.
Treatment And Disposal System Of Sewage And Sullage WaterSewage shall be treated in Sewage Treatment Plant (STP) and thereafter treated water to be used for flushing and irrigation.
Solid Waste Management And Disposal SystemSolid waste to be collected from individual flats and stored in garbage room. Recyclable shall be processed in the compost machine to make compost. Non recyclable waste shall be disposed of through approved agents.
Water Conservation SystemRain water harvesting pits shall be provided for ground wate recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing.
Energy Management System Including Use Of Renewable EnergySingle point metering will be there for energy purchased from the grid/ power supply company.
Fire Protection And Fire Safety SystemSprinkler, fire doors, yard hydrants, smoke detector and fire alarm system will be provided as applicable.
Social Infrastructure And Other Public Amenities Including Public Health ServicesCommon social infrastructure shall be provided for all the phases combined.
Emergency Evacuation ServicesFire staircases shall be provided as per the approved fire drawing for evacuation to open areas.
Other Miscellaneous WorkNot Applicable.
Financials
Registration Fee (₹)39500
Project Duration (months)60