THE BROOK PHASE-2

by Blessings Homz Pvt Ltd

Gautam Buddha Nagar, Uttar Pradesh · UPRERAPRJ535539/09/2024

Registered

Total units

429

Overview

Registration Date2024-09-24
RERA NumberUPRERAPRJ535539/09/2024
Promoter IDUPRERAPRM164667
Proposed Start2024-05-20
Proposed Completion2029-05-13

Location

DistrictGautam Buddha Nagar
TehsilDadri
VillageSECTOR -12
AddressPLOT NO.:- GH-03C
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units429
Unit Types1
Blocks3
Floors31

Khasra records (1)

  • GH-03C· Plot· 20000

Inventory

Apartments (441 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
F193 BHK177.11
F203 BHK177.11
F203 BHK164.61
F203 BHK177.11
F203 BHK177.11
F203 BHK164.61
F203 BHK177.11
F213 BHK177.11
F213 BHK164.61
F213 BHK177.11
F213 BHK177.11
F213 BHK164.61
F213 BHK177.11
F223 BHK177.11
F223 BHK164.61
F223 BHK177.11
F223 BHK177.11
F223 BHK164.61
F223 BHK177.11
F233 BHK177.11
F233 BHK164.61
F233 BHK177.11
F233 BHK177.11
F233 BHK177.11
F233 BHK164.61
F243 BHK177.11
F243 BHK164.61
F243 BHK177.11
F243 BHK177.11
F243 BHK164.61
F243 BHK177.11
F253 BHK177.11
F253 BHK164.61
F253 BHK177.11
F253 BHK177.11
F253 BHK164.11
F253 BHK177.11
F263 BHK177.11
F263 BHK164.61
F263 BHK177.11
F263 BHK177.11
F263 BHK164.61
F263 BHK177.11
F273 BHK177.11
F273 BHK164.61
F273 BHK177.11
EBSMNT3 BHK000
EBSMNT23 BHK000
EBSMNT33 BHK000
EGF3 BHK000
E13 BHK177.11
E13 BHK164.61
E13 BHK177.11
E13 BHK177.11
E13 BHK164.61
E13 BHK177.11
E23 BHK177.11
E23 BHK164.61
E23 BHK177.11
E23 BHK177.11
E23 BHK164.61
E23 BHK177.11
E33 BHK177.11
E33 BHK164.61
E33 BHK177.11
E33 BHK177.11
E33 BHK164.61
E33 BHK177.11
E43 BHK177.11
E43 BHK164.61
E43 BHK177.11
E43 BHK177.11
E43 BHK164.61
E43 BHK177.11
E53 BHK177.11
E53 BHK164.61
E53 BHK177.11
E53 BHK164.61
E53 BHK177.11
E63 BHK177.11
E63 BHK164.61
E63 BHK177.11
E63 BHK177.11
E63 BHK164.61
E63 BHK177.11
E73 BHK177.11
E73 BHK164.61
E73 BHK177.11
E73 BHK177.11
E73 BHK164.61
E73 BHK177.11
E83 BHK177.11
E83 BHK164.61
F273 BHK177.11
F273 BHK164.61
F273 BHK177.11
GBSMNT3 BHK000
GBSMNT23 BHK000
GBSMNT33 BHK000
GGF3 BHK000
G13 BHK198.81
G13 BHK198.81
G13 BHK1100.61
G13 BHK1100.61
G23 BHK198.81
G23 BHK198.81
G23 BHK1100.61
G23 BHK1100.61
G33 BHK198.81
G33 BHK198.81
G33 BHK1100.61
G33 BHK1100.61
G43 BHK198.81
G43 BHK198.81
G43 BHK1100.61
G43 BHK1100.61
G53 BHK198.81
E83 BHK177.11
E83 BHK177.11
E83 BHK164.61
E83 BHK177.11
E93 BHK177.11
E93 BHK164.61
E93 BHK177.11
E93 BHK177.11
E93 BHK164.61
E93 BHK177.11
E103 BHK177.11
E103 BHK164.61
E103 BHK177.11
E103 BHK177.11
E103 BHK164.61
E103 BHK177.11
E113 BHK177.11
E113 BHK164.61
E113 BHK177.11
E113 BHK177.11
E113 BHK164.61
E113 BHK177.11
E123 BHK177.11
E123 BHK164.61
E123 BHK177.11
E123 BHK177.11
E123 BHK164.61
E123 BHK177.11
E133 BHK177.11
E133 BHK164.61
E133 BHK177.11
E133 BHK177.11
E133 BHK164.61
E133 BHK177.11
E143 BHK177.11
E143 BHK164.61
E143 BHK177.11
E143 BHK177.11
E143 BHK164.61
E143 BHK177.11
E153 BHK177.11
E153 BHK164.61
E153 BHK177.11
E153 BHK177.11
E153 BHK164.61
E153 BHK177.11
G53 BHK198.81
G53 BHK1100.61
G53 BHK1100.61
G63 BHK198.81
G63 BHK198.81
G63 BHK1100.61
G63 BHK1100.61
G73 BHK198.81
G73 BHK198.81
G73 BHK1100.61
G73 BHK1100.61
G83 BHK198.81
G83 BHK198.81
G83 BHK1100.61
G83 BHK1100.61
G93 BHK198.81
G93 BHK198.81
G93 BHK1100.61
G103 BHK198.81
G103 BHK198.81
G103 BHK1100.61
G103 BHK1100.61
G113 BHK198.81
G113 BHK198.81
G113 BHK1100.61
G113 BHK1100.61
G123 BHK198.81
G123 BHK198.81
G123 BHK1100.61
G123 BHK1100.61
G133 BHK198.81
G133 BHK198.81
G133 BHK1100.61
G133 BHK1100.61
G143 BHK198.81
G143 BHK198.81
G143 BHK1100.61
G143 BHK1100.61
G153 BHK198.81
G153 BHK198.81
G153 BHK1100.61
G153 BHK1100.61
G163 BHK198.81
G163 BHK198.81
G163 BHK1100.61
G163 BHK1100.61
E163 BHK177.11
E163 BHK164.61
E163 BHK177.11
E163 BHK177.11
E163 BHK164.61
E163 BHK177.11
E173 BHK177.11
E173 BHK164.61
E173 BHK177.11
E173 BHK177.11
E173 BHK164.61
E173 BHK177.11
E183 BHK177.11
E183 BHK164.61
E183 BHK177.11
E183 BHK177.11
E183 BHK164.61
E183 BHK177.11
E193 BHK177.11
E193 BHK164.61
E193 BHK177.11
E193 BHK177.11
E193 BHK164.61
G173 BHK198.81
G173 BHK198.81
G173 BHK1100.61
G173 BHK1100.61
G183 BHK198.81
G183 BHK198.81
G183 BHK1100.61
G183 BHK1100.61
G193 BHK198.81
G193 BHK1100.61
G193 BHK1100.61
G203 BHK198.81
G203 BHK198.81
G203 BHK1100.61
G203 BHK1100.61
G193 BHK198.81
G213 BHK198.81
G213 BHK198.81
G213 BHK1100.61
G213 BHK1100.61
G223 BHK198.81
G223 BHK198.81
G223 BHK1100.60
E193 BHK177.11
E203 BHK177.11
E203 BHK164.61
E203 BHK177.11
E203 BHK177.11
E203 BHK164.61
E203 BHK177.11
E213 BHK177.11
E213 BHK164.61
E213 BHK177.11
E213 BHK177.11
E213 BHK164.61
E213 BHK177.11
E223 BHK177.11
E223 BHK164.61
E223 BHK177.11
E223 BHK177.11
E223 BHK164.61
E223 BHK177.11
E233 BHK177.11
E233 BHK164.61
E233 BHK177.11
E233 BHK177.11
E233 BHK164.61
E233 BHK177.11
E243 BHK177.11
E243 BHK164.61
E243 BHK177.11
E243 BHK177.11
E243 BHK164.61
E243 BHK177.11
E253 BHK177.11
E253 BHK164.61
E253 BHK177.11
E253 BHK177.11
E253 BHK164.61
E253 BHK177.11
E263 BHK177.11
E263 BHK164.61
E263 BHK177.11
E263 BHK177.11
E263 BHK164.61
E263 BHK177.11
E273 BHK177.11
E273 BHK164.61
E273 BHK177.11
E273 BHK177.11
E273 BHK164.61
E273 BHK177.11
FBSMNT3 BHK000
FBSMNT23 BHK000
FBSMNT33 BHK000
FGF3 BHK000
F13 BHK177.11
F13 BHK164.61
F13 BHK177.11
F13 BHK177.11
F13 BHK164.61
F13 BHK177.11
F23 BHK177.11
F23 BHK164.61
F23 BHK177.11
F23 BHK177.11
F23 BHK164.61
F23 BHK177.11
F33 BHK177.11
F33 BHK164.61
F33 BHK177.11
F33 BHK177.11
F33 BHK164.61
F33 BHK177.11
F43 BHK177.11
F43 BHK164.61
F43 BHK177.11
F43 BHK177.11
F43 BHK164.61
F43 BHK177.11
F53 BHK177.11
F53 BHK164.61
F53 BHK177.11
F53 BHK177.11
F53 BHK164.61
F53 BHK177.11
F63 BHK177.11
F63 BHK164.61
F63 BHK177.11
F63 BHK177.11
F63 BHK164.61
F63 BHK177.11
F73 BHK177.11
F73 BHK164.61
F73 BHK177.11
F73 BHK177.11
F73 BHK164.61
F73 BHK177.11
F83 BHK177.11
F83 BHK164.61
F83 BHK177.11
F83 BHK177.11
F83 BHK164.61
F83 BHK177.11
F93 BHK177.11
F93 BHK164.61
F93 BHK177.11
F93 BHK177.11
F93 BHK164.61
F93 BHK177.11
F103 BHK177.11
F103 BHK164.61
F103 BHK177.11
F103 BHK177.11
F103 BHK164.61
F103 BHK177.11
F113 BHK177.11
F113 BHK164.61
F113 BHK177.11
F113 BHK177.11
F113 BHK164.61
F113 BHK177.11
F123 BHK177.11
F123 BHK164.61
F123 BHK177.11
F123 BHK177.11
F123 BHK164.81
F123 BHK177.11
F133 BHK177.11
F133 BHK164.61
F133 BHK177.11
F133 BHK177.11
F133 BHK164.61
F133 BHK177.11
F143 BHK177.11
F143 BHK164.61
F143 BHK177.11
F143 BHK177.11
F143 BHK164.61
F143 BHK177.11
F153 BHK177.11
F153 BHK164.61
F153 BHK177.11
F153 BHK177.11
F153 BHK164.61
F153 BHK177.11
F163 BHK177.11
F163 BHK164.61
F163 BHK177.41
F163 BHK177.11
F163 BHK164.61
F173 BHK177.11
F173 BHK164.61
F173 BHK177.11
F173 BHK177.11
F173 BHK164.61
F173 BHK177.11
F183 BHK177.11
F183 BHK164.61
F183 BHK177.11
F183 BHK177.11
F183 BHK164.61
F183 BHK177.11
F193 BHK177.11
F193 BHK164.61
G223 BHK1100.61
G233 BHK198.81
G233 BHK198.81
G233 BHK1100.61
G233 BHK1100.61
G243 BHK198.81
G243 BHK198.81
G243 BHK1100.61
G243 BHK1100.61
G253 BHK198.81
G253 BHK198.81
G253 BHK1100.61
G253 BHK1100.61
G263 BHK198.81
G263 BHK198.81
G263 BHK1100.61
G263 BHK1100.61
G273 BHK198.81
G273 BHK198.81
G273 BHK1100.61
G273 BHK1100.61
F193 BHK177.11
F193 BHK177.11
F193 BHK164.61

Permits & Approvals

Permit NoPLG/BP SM-06-Dec-2023 19817
Permit Date2024-05-14
Valid Until2029-05-13
Extendable Until2029-05-13

Documents

Filing documents

  • Details of Encumbrances
  • Other Plan(If Any)
  • Proforma of Completion Certificate(Occupancy)
  • Proforma of Completion Certificate(Occupancy)
  • CA CERTIFICATE
  • CA CERTIFICATE
  • Details of Encumbrances#New(2024-05-28)
    View
  • Commencement Certificate#New(2024-05-28)
    View
  • Other Plan(If Any)#New(2024-09-04)
    View
  • Proforma of Application Form#New(2024-05-28)
    View
  • Proforma of Allotment Letter#New(2024-05-28)
    View
  • Proforma of Conveyance Deed#New(2024-05-28)
    View
  • Waste Disposal Plan#New(2024-09-12)
    View
  • Water Supply Plan#New(2024-09-12)
    View
  • Electricity Supply Plan#New(2024-09-12)
    View
  • Development Work Plan#New(2024-08-14)
    View
  • Affidavit (Form-B)#New(2024-06-28)
    View
  • CA CERTIFICATE#New(2024-08-26)
    View
  • ARCHITECT CERTIFICATE#New(2024-08-12)
    View
  • ENGINEERS CERTIFICATE#New(2024-08-12)
    View
  • Other#New(2024-09-17)
    View
  • Proforma of Agreement for Sale#New(2024-05-28)
    View

Land documents

  • Lease Deed#10900/16(2016-04-29)
    10856297969.pdf
    View

Project Team

Architect AddressK-47 KAILASH COLONY DELHI-110048
Engineer AddressH-53 FIRST FLOOR SECTOR-63 NOIDA 201301

Developer & Contact

Developer

Promoter NameBlessings Homz Pvt Ltd
Promoter AddressA-6, Ground Floor, Yojana Vihar, Delhi-110092
Company TypeCompany
Mobile9810663363
Emailaccounts@fusionbuildtech.com
Registered AddressA-6, Ground Floor, Yojana Vihar, Delhi-110092
Contractor AddressPLOT NO.-01 THIRD FLOOR LSC MAYUR VIHAR PHASE -2 DELHI 110091

Bank Accounts

Account Typecollection
Account Number414605001942
Account NameBLESSINGS HOMZ PVT LTD COLLECTION ACCOUNT FOR THE BROOK PHASE-2
Bank NameICIC Bank
BranchCHERRY COUNTY
Branch AddressSHOP NO9A-9B GH-05B TECHZONE-4 GEATER NOIDA WEST
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0004146
Branch Emailchaudhary.ankush@icici.com
Account Typeseparate
Account Number414605001941
Account NameBLESSINGS HOMZ PVT LTD SEPRATE B ANK ACCOUNT FOR THE PHASE -2
Bank NameICICI BANK
BranchCHERRY COUNTY
Branch AddressSHOP NO. 9A-9B GH-05B TECHZONE -4 GREATER NOIDA WEST
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0004146
Account Typetransaction
Account Number414605001940
Account NameBLESSINGS HOMZ PVT LTD TRANSACTION ACCOUNT FOR THE BROOK PHASE -2
Bank NameICICI BANK
BranchCHERRY COUNTY
Branch AddressSHOP NO. 9A-9B GH-05B TECHZONE-4 GREATER NOIDA WEST
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0004146

Development & Facilities

Development works

Demarcation Of PlotsThe project is demarkated with two roads each of 24 meter running along the south west side and north west side .The plot measures 117.84m in length and 173.38m in breadth . Geographical coordinates of the centre of the project site are 28.33.39.72 N and 77.28.57.22 E. Elevation of the project site is 211m aboe sea level. Project site is well connected with the Greater Noida West Link Road . Nearest railway station is Maripet Station at a distance of 3.8 km from site.
Boundary WallThe boundary wall will consist of brick work up to a height of 5ft and with iron grill on top. A storm water drain is running along the boundary wall on 02 sides. The other 02 sides of the boundary wallhave adjoining projects on plot No. GH-04B GH-03B
Road WorkThe project will consist of 8 meter internal wide road to facilitate vehicle and pedestrian movement. The CC roads are complete with VDF flooring which are maintenance free and have longer life spans. The roads in front of lobbies will be finished with pavers laid in design as per architecht . The road on ground floor is bounded by kerb stone and saucer drain towards the boundary wall.
FootpathsThe project will have footpath for pedestrian running along the towers. The footpaths are finished with pavers and or granite stones. The footpaths are illuminated with decorative lights placed at appropriate distance.
Water Supply Including Drinking Water FacilitiesThe drinking water will be supplied by GNIDA. Service connection amount has been paid as part of sanctioning of drawings. The drinking water system includes 02 raw water tanks summing upto 230 KL raw water received from GNIDA. This raw water after filtration is stored in 02 drinking water tanks of total capacity of 230 kl This drinking water is pumped by hydro pneumatic pumpsto overhead tanks on terrace of each tower.
Sewer SystemThe project will have own STP installed in premises . 340 KLD stp in 2 phase is proposed and sanctioned. Sever watertreatment includes primary treatment through Bar Screen and Equilisation tanks. Thereafter secondary treatment includes MBBR reactors. Teriary treatment includes multigrade filetr and activated carbon filters. Thereafter the treated water is stored in 02 treated water tanks in STP pump housetotaling 230 kl. The treated water is used in flushing usage and horticulture activities.
DrainSewer water is treated in an onsite STP plant. The treated water frm STP is proposed to be used in horticulture and flusing activities. The rain water is harvested through a netwrk of 10water harvesting pitseach with a capacity of 28.49 cum water. Storm water drains for internal roads is discharged into storm water drains running beside boundary wall.
ParksThe project will be having a central park having a fragrance garden and decorative plants. The project is providing 5000 sqm landscaped area on podium. The planned facilities are Jogging Track, swimming pool, celeberation lawns, pavilions and plaza for sitting, kids play area and gardens., outdoor gymnasium, yoga meditation lawn, amphitheatre, multipurpose court to name a few.
Tree PlantingThe project will be having trees to comply with the norms of GNIDA. 154 trees are proposed at site towards landscaping. The varietes of trees are 39 Ashoka trees, 38 Gulmohar trees, 39 Botte palms, and 38 bamoo trees. Beside the trees 7703 landscaped green plants will be provided on ground and stilt floor.
Design For Electric Supply Including Street LightingThe company draw its electricity from grid provided by UPPCL or NPCL. The proposed electrical load is 1857 KW for apartments 507 KW load for common services and 420 KW for EV charging setup. the proposed load will be drawn from NPCL/UPPCL distribution and will be handled by stepdown transformers . The DG bacup is provided by 02 650 KVA DG sets.
Community BuildingsThe community building are as per sanctioned drawings and are planned on 1444 sqm area. The facilities planned in communty building includes changing rooms and toilet for swimming pool, party hall complete with toilet and kitchen, gymnasium. Billiards and TT room, card room and Indoor games area, 02 guest rooms, kids play area, steam room and sauna room, kitchen and toilet at terrace.
Treatment And Disposal System Of Sewage And Sullage Water340KLD STP is proposed and sactioned. . Sever water treatment includes primary treatment through Bar screen and equilisation tanks. Thereafter secondary treatment includes MBBR reactors, Tertiary treatment includes mutigrade filterand activated carbon filters. Therafter the treated water is stored in o2 water tanks in STP pump house totalling 230 KLD. This treated watre is used for flushing and horticulture activites.
Solid Waste Management And Disposal SystemA plant room fr OWC machine measuring 50 sqm , part of solid waste management is sanctioned in submission drawings. Door to door collection system is proposed for collection of domestic waste. the bio degrable waste will be treated in organic waste convertor. the residue from OWC will be used as manure. Recyclable waste will be sold to GNIDA authorised vendors.
Water Conservation SystemThe project has been precertified as gold rating under IGBC. Accordingly, project has been proposed to use low flow plumbing fixtures that saves a signifiant amount of water along with usage of pressure reducing valves in water riser.
Energy Management System Including Use Of Renewable EnergyIt is proposed to use solar renewable energy to cater to Common area lighting or 1 OF DEMAND LOAD. All common area and exteroior lights will be LED based. It is proposed to use pumps with mimimum efficiency of 70 percent and motors with efficiency over 85 percent.
Fire Protection And Fire Safety SystemFire fighting pump rooms and fire fihting tanks have been provided for fire protection system. 2 No.s fire tank of capacity 250 kl provided. fire protection includes Main Fire Pumps, Jockey pumps, DG fire pumps, Yard Hydrants, FHC at each floor, sprinklers in each dwelling area, refuge area at 19th floor of each tower. Additionally 10000 L capacity is provided for fire fighting at OH tank in every tower.
Social Infrastructure And Other Public Amenities Including Public Health ServicesThe project will be having club with gymnasium and swimming pool.
Emergency Evacuation ServicesAs a statutory requirement from fire services, refuge area is provided on 1th floor of each tower. Each tower is provided with 02 staircases for evacuation. The width of these staircase are 1500mm and 2000mm.
Other Miscellaneous Workwe have proposed EV charging setup, Green certified glass for building, proper vantilation and PV setup to harness slar lights. A provision has been provided for mechanical parking by providing adequate light in basement to cater to future needs of parking.

Financials

Registration Fee (₹)45000
Project Duration (months)60