The Flagship Phase 5
by IT INFRASTRUCTURE PARK PRIVATE LIMITED
Gautam Buddha Nagar, Uttar Pradesh · UPRERAPRJ388326/05/2026
Total units
169
Overview
Registration Date2026-05-07
RERA NumberUPRERAPRJ388326/05/2026
Promoter IDUPRERAPRM191806
Proposed Start2025-01-01
Proposed Completion2027-11-16
Location
DistrictGautam Buddha Nagar
TehsilGautam Buddha Nagar
VillageSector 140A
LocalityNOIDA
AddressPlot No. 01B, Sector 140 A, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201305
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units169
Unit Types3
Blocks1
Floors16
Khasra records (1)
- Plot No. 01B, Sector 140A, Noida, Gautam Buddha Nagar, Uttar Pradesh, Pin-201305· Plot· 452025 m²
Inventory
Apartments (169 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Tower-4 | 11 | STUDIO | 1 | 42.89 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 42.59 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 39.19 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 39.63 | 1 | — |
| Tower-4 | 11 | STUDIO | 1 | 38.9 | 0 | — |
| Tower-4 | 12 | STUDIO | 1 | 22 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 42.89 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 42.59 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 39.19 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 39.63 | 1 | — |
| Tower-4 | 12 | STUDIO | 1 | 38.9 | 0 | — |
| Tower-4 | 13 | STUDIO | 1 | 22 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 42.89 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 42.59 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 39.19 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 39.63 | 1 | — |
| Tower-4 | 13 | STUDIO | 1 | 38.9 | 0 | — |
| Tower-4 | 14 | STUDIO | 1 | 22 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 42.89 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 42.59 | 1 | — |
| Tower-4 | GF | SHOP | 1 | 63.11 | 0 | — |
| Tower-4 | GF | SHOP | 1 | 159.54 | 0 | — |
| Tower-4 | GF | SHOP | 1 | 169.73 | 0 | — |
| Tower-4 | GF | SHOP | 1 | 169.73 | 0 | — |
| Tower-4 | GF | SHOP | 1 | 169.73 | 0 | — |
| Tower-4 | GF | SHOP | 1 | 169.73 | 0 | — |
| Tower-4 | GF | SHOP | 1 | 98.53 | 0 | — |
| Tower-4 | 1 | OTHER | 1 | 186.8 | 0 | — |
| Tower-4 | 1 | OTHER | 1 | 61.41 | 0 | — |
| Tower-4 | 1 | OTHER | 1 | 169.6 | 0 | — |
| Tower-4 | 1 | OTHER | 1 | 399.06 | 0 | — |
| Tower-4 | 1 | SHOP | 1 | 16.79 | 0 | — |
| Tower-4 | 1 | SHOP | 1 | 16.42 | 0 | — |
| Tower-4 | 2 | OTHER | 1 | 364.6 | 0 | — |
| Tower-4 | 2 | OTHER | 1 | 375.07 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 61.64 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 72.46 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 73.3 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 80.46 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 79.86 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 79.86 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 80.46 | 0 | — |
| Tower-4 | 3 | OTHER | 1 | 113.95 | 0 | — |
| Tower-4 | 4 | OTHER | 1 | 61.64 | 0 | — |
| Tower-4 | 4 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 4 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 4 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 4 | OTHER | 1 | 82.06 | 1 | — |
| Tower-4 | 4 | OTHER | 1 | 72.46 | 1 | — |
| Tower-4 | 4 | OTHER | 1 | 73.3 | 0 | — |
| Tower-4 | 4 | OTHER | 1 | 80.46 | 0 | — |
| Tower-4 | 4 | OTHER | 1 | 79.86 | 0 | — |
| Tower-4 | 4 | OTHER | 1 | 79.86 | 0 | — |
| Tower-4 | 4 | OTHER | 1 | 91.14 | 0 | — |
| Tower-4 | 4 | OTHER | 1 | 25.14 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 61.64 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 82.06 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 72.46 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 73.3 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 80.46 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 79.86 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 79.86 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 80.46 | 0 | — |
| Tower-4 | 5 | OTHER | 1 | 71.64 | 0 | — |
| Tower-4 | 6 | OTHER | 1 | 22.27 | 0 | — |
| Tower-4 | 6 | OTHER | 1 | 22.76 | 0 | — |
| Tower-4 | 6 | OTHER | 1 | 22.48 | 0 | — |
| Tower-4 | 6 | OTHER | 1 | 23.46 | 0 | — |
| Tower-4 | 6 | OTHER | 1 | 32.23 | 0 | — |
| Tower-4 | 6 | OTHER | 1 | 31.64 | 0 | — |
| Tower-4 | 6 | OTHER | 1 | 227.23 | 0 | — |
| Tower-4 | 6 | OTHER | 1 | 74.04 | 0 | — |
| Tower-4 | 6 | OTHER | 1 | 71.77 | 0 | — |
| Tower-4 | 7 | STUDIO | 1 | 109.75 | 3 | — |
| Tower-4 | 7 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 7 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 7 | STUDIO | 1 | 42.59 | 1 | — |
| Tower-4 | 7 | STUDIO | 1 | 39.19 | 1 | — |
| Tower-4 | 7 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 7 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 7 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 7 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 7 | STUDIO | 1 | 39.63 | 1 | — |
| Tower-4 | 7 | STUDIO | 1 | 38.9 | 0 | — |
| Tower-4 | 8 | STUDIO | 1 | 22 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 42.89 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 42.59 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 39.19 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 39.63 | 1 | — |
| Tower-4 | 8 | STUDIO | 1 | 38.9 | 0 | — |
| Tower-4 | 9 | STUDIO | 1 | 22 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 42.89 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 42.59 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 39.19 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 39.63 | 1 | — |
| Tower-4 | 14 | STUDIO | 1 | 38.9 | 0 | — |
| Tower-4 | 15 | OTHER | 1 | 20.41 | 0 | — |
| Tower-4 | 15 | OTHER | 1 | 20.65 | 0 | — |
| Tower-4 | 15 | OTHER | 1 | 20.19 | 0 | — |
| Tower-4 | 15 | OTHER | 1 | 20.75 | 0 | — |
| Tower-4 | 15 | OTHER | 1 | 39.11 | 0 | — |
| Tower-4 | 15 | OTHER | 1 | 38.99 | 0 | — |
| Tower-4 | 15 | OTHER | 1 | 140.93 | 0 | — |
| Tower-4 | 9 | STUDIO | 1 | 39.19 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 39.63 | 1 | — |
| Tower-4 | 9 | STUDIO | 1 | 38.9 | 0 | — |
| Tower-4 | 10 | STUDIO | 1 | 22 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 42.89 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 42.68 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 42.59 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 39.19 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 39.27 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 39.63 | 1 | — |
| Tower-4 | 10 | STUDIO | 1 | 38.9 | 0 | — |
| Tower-4 | 11 | STUDIO | 1 | 22 | 1 | — |
Permits & Approvals
Permit NoNOIDA/B.C./B.P.-OBPAS-7596/BP-V-1031/750
Permit Date2022-11-17
Valid Until2027-11-16
Extendable Until2032-11-16
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2026-03-24)View
- Commencement Certificate#New(2026-03-24)View
- Other Plan(If Any)#New(2026-03-24)View
- Proforma of Application Form#New(2026-04-22)View
- Proforma of Allotment Letter#New(2026-03-27)View
- Proforma of Conveyance Deed#New(2026-03-24)View
- Waste Disposal Plan#New(2026-03-24)View
- Water Supply Plan#New(2026-03-24)View
- Electricity Supply Plan#New(2026-03-24)View
- Development Work Plan#New(2026-04-22)View
- Affidavit (Form-B)#New(2026-03-24)View
- CA CERTIFICATE#New(2026-03-25)View
- ARCHITECT CERTIFICATE#New(2026-03-26)View
- ENGINEERS CERTIFICATE#New(2026-03-26)View
- Proforma of Agreement for Sale#New(2026-04-22)View
Land documents
- Lease Deed#3997(2009-10-29)View19563065622.pdf
- Allotment Letter issued by Competent Authority#Sub Lease Deed Permission Letter No. 2009/2229(2009-06-08)View19563068452.pdf
- Allotment Letter issued by Competent Authority#Land Payment Challan(2022-02-23)View19563063678.pdf
- Allotment Letter issued by Competent Authority#Land No Dues Certificate by NOIDA Authority(2022-05-31)View19563062068.pdf
Project Team
Architect Address135, Block - B , Sector 44, NOIDA -201301
Engineer AddressC-35, Pamposh Enclave, GK -1 , New Delhi-110048
Developer & Contact
Developer
Promoter NameIT INFRASTRUCTURE PARK PRIVATE LIMITED
Promoter AddressRegistered Office Plot No. 3&4, Second Floor, Savitri Bhawan, A- Block Market, Preet Vihar, East Delhi, Delhi, PIN-110092 Corporate Office Tower A- Ground Floor , Logix Techno Park, Sector-127, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-110092 Site Office Plot No. 1B, Sector 140-A, NOIDA, Distt. Gautam Buddha Nagar, Uttar Pradesh, PIN 201305
Company TypeCompany
Mobile9599109259
Emailaccount@crcgroup.in
Registered AddressRegistered Office Plot No. 3&4, Second Floor, Savitri Bhawan, A- Block Market, Preet Vihar, East Delhi, Delhi, PIN-110092 Corporate Office Tower A- Ground Floor , Logix Techno Park, Sector-127, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-110092 Site Office Plot No. 1B, Sector 140-A, NOIDA, Distt. Gautam Buddha Nagar, Uttar Pradesh, PIN 201305
Contractor Address120/5, Krishna Nagar , Safdarjung Enclave, Delhi-110029
Bank Accounts
Account Typecollection
Account Number4051709325
Account NameIT INFRASTRUCTURE PARK PVT LTD COLLECTION A/C FOR THE FLAGSHIP PHASE 5
Bank NameKotak Mahindra Bank Ltd
BranchSector 18, Noida
Branch AddressPlot No. 4 and 5, Block F, Sector 18, Noida, Uttar Pradesh-201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCKKBK0000181
Branch Emailakhil.sharma@kotak.com
Account Typeseparate
Account Number4051709318
Account NameIT INFRASTRUCTURE PARK PVT LTD SEPARATE BANK ACCOUNT FOR THE FLAGSHIP PHASE 5
Bank NameKotak Mahindra Bank Ltd
BranchSector 18 Noida
Branch AddressPlot No. 4 and 5 , Block F, Sector 18, Noida, Uttar Pradesh- 201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCKKBK0000181
Account Typetransaction
Account Number4051708755
Account NameIT INFRASTRUCTURE PARK PVT LTD RERA TRANSACTION AC FOR THE FLAGSHIP PHASE 5
Bank NameKotak Mahindra Bank Ltd
BranchSector 18, Noida
Branch AddressPlot No. 4 and 5, Block F, Sector 18, Noida, Uttar Pradesh-201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCKKBK0000181
Development & Facilities
Development works
Demarcation Of PlotsThe Plot No. 01B, Sector 140A, NOIDA had been demarcated by Noida Development Authority.
Boundary WallA Boundary wall of RCC/Brick work of thickness 115mm/230mm/150mm and height of 900/1500/1800mm with plaster and railing will be prepared , it will be as per design.
Road WorkAccess driveway to all the towers will be provided and that drive way of pavers M 30 Grade with thickness of 65mm and 100mm kerb stone on sides if required. At entry of tower there will be pattern as per landscape design.
FootpathsFootpath will be provided using 40-50mm paver wherever required.
Water Supply Including Drinking Water FacilitiesNOIDA Authority shall supply water for the entire project and it shall be collected in under ground water tanks of 178KLX1, 184KLX1, 184KLX1 Nos. raw water and 178KLX1, 167KLX1 nos. domestic water tanks and water with 656mm dia pipes to overhead tanks at respective tower.
Sewer SystemSTP of 700 KLD will be constructed using RCC and required pump room, STP treated water will be used in flushing, cooling towers and gardening.
DrainStorm water drainage system will be constructed using 400mm dia pipes as per drawing.
ParksLandscape with civil work masonary 115/250mm and stone, pavers, grass and various type of plantation shurbs.
Tree PlantingTree plantation will be as per sanctioned plan in which 50 percent trees will be evergreen trees.
Design For Electric Supply Including Street LightingIncoming HT Electrical supply will be provided by UPPCL/NPCL via 2 Nos. 7.5 MVA Power transformers, substations, LT Panel and DG Sets of Nos X 1010 KVA as planned as per norms. Street lighting will be done using LT supply and power backup as per requirement.
Community BuildingsNot Applicable in case of commercial project.
Treatment And Disposal System Of Sewage And Sullage WaterSTP will be installed as per drawings. All sewerage will be treated waste water shall be used for landscaping green, cooling towers and flushing system.
Solid Waste Management And Disposal SystemSTP is proposed at site for the required capacity and treated water shall be used for flushing and irrigation as per latest green building practices.
Water Conservation SystemRain water harvesting system with separate rain water storage tanks is being provided to conserve rain water and duel flush, Low flow Fixture and Drip/sprinklers in green areas will also be provided.
Energy Management System Including Use Of Renewable EnergySolar System shall be provided as per requirement.
Fire Protection And Fire Safety SystemIn compliance to National Building Code of India 2016 Part IV requirement , Fire Protection and Safety System provided which consists of Underground Fire Tank -3 nos 310KL each. All project sprinkler system provided in compliances to IS codes and project fire safety requirement aligned to NBC 2016 Part IV
Social Infrastructure And Other Public Amenities Including Public Health ServicesCreche facility, Public toilets and driver toilets.
Emergency Evacuation ServicesEmergency Evacuation System ( stairways, Exitways etc. ) planned in compliance to National Building Code of India 2016 Part-IV. Refuge areas also provided in compliance to NBC 2016
Other Miscellaneous WorkState of the Art Security system access control system and CCTV provided for Security and controlled access in the building.
Financials
Registration Fee (₹)41000
Project Duration (months)35