Registered
Total units
94
Overview
Registration Date2024-10-28
RERA NumberUPRERAPRJ521702/10/2024
Promoter IDUPRERAPRM300220
Proposed Start2024-07-15
Proposed Completion2029-04-25
Location
DistrictPrayagraj
TehsilPhulpur
VillageSherdeeh & Rahimapur
AddressArazi No. 2407, 2408, 2409, 2411 & 2412, Vill: Sherdeeh, Tehsil: Phulpur & Arazi No. 56KHA/3, Vill: Rahimapur, Tehsil: Phulpur, Dis: Prayagraj, Uttar Pradesh
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units94
Unit Types3
Blocks1
Floors12
Khasra records (1)
- 2407,2408,2409,2411,2412, 56kha/3· Plot· 3533 m²
Inventory
Apartments (36 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Tower 1 | 1 | 3 BHK | 3 | 92.21 | 5 | — |
| Tower 1 | 1 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 1 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 3 | 3 BHK | 3 | 92.21 | 5 | — |
| Tower 1 | 3 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 3 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 4 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 5 | 3 BHK | 3 | 92.21 | 5 | — |
| Tower 1 | 5 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 5 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 6 | 3 BHK | 3 | 92.21 | 5 | — |
| Tower 1 | 2 | 3 BHK | 3 | 92.21 | 5 | — |
| Tower 1 | 2 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 2 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 12 | OTHER | 0 | 66.93 | 1 | — |
| Tower 1 | 12 | 3 BHK | 2 | 92.21 | 5 | — |
| Tower 1 | 12 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 11 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 11 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 10 | 3 BHK | 3 | 92.21 | 5 | — |
| Tower 1 | 10 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 10 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 9 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 9 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 9 | 3 BHK | 3 | 92.21 | 5 | — |
| Tower 1 | 8 | 3 BHK | 3 | 92.21 | 5 | — |
| Tower 1 | 8 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 8 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 7 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 7 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 7 | 3 BHK | 3 | 92.21 | 5 | — |
| Tower 1 | 6 | 2 BHK | 4 | 65.65 | 3 | — |
| Tower 1 | 6 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 4 | 3 BHK | 1 | 92.21 | 5 | — |
| Tower 1 | 4 | 3 BHK | 3 | 92.21 | 5 | — |
| Tower 1 | 11 | 3 BHK | 3 | 92.21 | 5 | — |
Permits & Approvals
Permit NoGroup Housing/03143/PDA/BP/22-23/0956/21122023
Permit Date2024-05-03
Valid Until2029-05-02
Extendable Until2031-05-02
Documents
Filing documents
- Details of Encumbrances
- ENGINEERS CERTIFICATE
- Details of Encumbrances#New(2024-10-14)View
- Commencement Certificate#New(2024-08-23)View
- Other Plan(If Any)#New(2024-08-23)View
- Proforma of Application Form#New(2024-08-13)View
- Proforma of Allotment Letter#New(2024-10-04)View
- Proforma of Conveyance Deed#New(2024-08-09)View
- Proforma of Completion Certificate(Occupancy)#New(2024-08-23)View
- Waste Disposal Plan#New(2024-08-10)View
- Water Supply Plan#New(2024-08-10)View
- Electricity Supply Plan#New(2024-10-15)View
- Development Work Plan#New(2024-08-10)View
- Affidavit (Form-B)#New(2024-08-09)View
- CA CERTIFICATE#New(2024-08-23)View
- ARCHITECT CERTIFICATE#New(2024-10-14)View
- ENGINEERS CERTIFICATE#New(2024-08-20)View
- Other#New(2024-10-15)View
- Proforma of Agreement for Sale#New(2024-08-13)View
Land documents
- Registry Document#IN-UP45686450297484W(2024-05-08)View11092532370.pdf
- Sale Deed#5973(2022-06-10)View11092536151.PDF
- Sale Deed#5974(2022-06-10)View11092539976.PDF
- Sale Deed#4185(2021-06-03)View11092537275.PDF
- Sale Deed#5847(2022-06-07)View11092536885.PDF
- Sale Deed#6378(2022-06-20)View11092531608.PDF
- Sale Deed#13551(2022-12-02)View11092534035.pdf
- Sale Deed#3427(2018-04-11)View11092539869.pdf
- Sale Deed#3426(2018-04-11)View11092537900.pdf
- Extract of Khatauni#2018(1900-01-01)View11092533767.pdf
- Extract of Khatauni#FIRE NOC AND STRUCTURAL DRAWINGS(1900-01-01)View11092537298.pdf
Project Team
Architect Address135B, LUKARGANJ, PRAYAGRAJ, U.P.
Engineer Address100-A, 3RD FLOOR, BHARAT NAGAR, NFC, NEW DELHI
Developer & Contact
Developer
Promoter NameBRAND MARKETEERS
Promoter Address3rd FLOOR, VINAYAK TOWER, 13-14, PD TANDON ROAD, CIVIL LINES, ALLAHABAD, UTTAR PRADESH
Company TypeProprietorship Firm
Mobile9305412830
Emailfarahshamim255@gmail.com
Registered Address3rd FLOOR, VINAYAK TOWER, 13-14, PD TANDON ROAD, CIVIL LINES, ALLAHABAD, UTTAR PRADESH
Contractor AddressARAZI NO-95 JHALWA INDIAN OIL ROAD, NEAR MAYUR VIHAR, PRAYAGRAJ, U.P. -211012
Bank Accounts
Account Typecollection
Account Number924020020789522
Account NameMS. BRAND MARKETEERS COLLECTION ACCOUNT FOR TRIDHARA PROJECT
Bank NameAXIS BANK LIMITED
BranchCIVIL LINES ALLAHABAD
Branch Address28 B, CIVIL STATION, M.G. MARG, CIVIL, LINES, ALLAHABAD,211001
Branch DistrictPrayagraj
Branch StateSelect
IFSCUTIB0000286
Branch EmailBMJHUNSIPROJECT@GMAIL.COM
Account Typeseparate
Account Number924020020789519
Account NameMS. BRAND MARKETEERS-SEPARATE BANK ACCOUNT FOR TRIDHARA PROJECT
Bank NameAXIS BANK LIMITED
BranchCIVIL LINES, ALLAHABAD
Branch Address28B, CIVIL STATION, M.G. MARG, CIVIL LINES, ALLAHABAD-211001
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCUTIB0000286
Account Typetransaction
Account Number924020020789535
Account NameMS. BRAND MARKETEERS RERA TRANSACTION ACCOUNT FOR TRIDHARA PROJECT
Bank NameAXIS BANK LIMITED
BranchCIVIL LINES, ALLAHABAD
Branch Address28 B, CICL STATION, M.G. MARG, CICIL LINES, ALLAHABAD-211001
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCUTIB0000286
Development & Facilities
Development works
Demarcation Of PlotsWe have one plot of size 3533SQM. As per Deed 3533 SQM. As per Site having 1 main entrance gate from the 30 m wide front road. Abutting 6.00 mtr. Wide internal road the building block.
Boundary Wall2 m high and 30 mm thick brick work and rcc work in column and beam. at the center face of boundary wall there would be a logo of the project which give a beautiful iconic design to boundary wall.
Road Workfrom the main entrance gate we have 80 mm thich interlocking brick/RCC road through out the project. whose wideness starts from 8.00 mtr.
Footpathswe would not provide any footpath.
Water Supply Including Drinking Water Facilitieswe will provide two nos. of pump for the requirement of blocks through underground pipelines.
Sewer Systemmodular sewerage system shall be provided. all sewerage water shall be go to the STP and overflow from the STP shall be connect with the municipal sewerage system. when come into force.
Drainstorm water shall be provided. storm water from roads and other landscape area shall be connect to the storm water drain channel and go to the rain water harvesting pit for recharge the ground water and overflow shall be connect with the municipal drain line.
Parkswe will provide green area with the different activities and the green area will have gaming facilities for kids.
Tree Plantingwe will provide many type of trees all along the boundary wall green area.
Design For Electric Supply Including Street Lightingwe will design implement the system as per local electricity board and will consider centralized transformer, HT panel, LT panel, Feeder Pillar and DG back for common service like External lighting, STP, Pump room rtc.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be provided. All sewerage water shall be go to the STP and overflow from the STP shall be connect with the municipal sewerage system, when come into force.
Solid Waste Management And Disposal Systemthere are a proper garbage collection area provided for the solid waste management.
Water Conservation Systemwe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable Energywe will use LED lights fitting in external area as well as solar lights. in pump room also all the equipment shall have energy efficient motor. and we will suggest to individual also to use.
Fire Protection And Fire Safety Systemthis project has only residential flats. hence we will provide fire fighting facility in common area while individual owner can install their own system as per their and local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation Serviceswe have proposed common pump room. All sewerage shall be go to the STP. Road sand other area shall be connect to the storm water drain channel and go to the rain water.
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)23000
Project Duration (months)58