UCHDPL- EDEN
by Uppal Chadha Hi-Tech Developers Pvt. Ltd.
Ghaziabad, Uttar Pradesh · UPRERAPRJ678818/09/2024
Total units
564
Overview
Registration Date2024-09-21
RERA NumberUPRERAPRJ678818/09/2024
Promoter IDUPRERAPRM5538
Proposed Start2024-09-01
Proposed Completion2029-06-30
Location
DistrictGhaziabad
TehsilGhaziabad
VillageGH-08
LocalitySECTOR-05, WAVE CITY, GHAZIABAD
AddressPLOT NO.-757, DASNA, KAZIPURA MORE,NH-9 ,GHAZIABAD, GH-08 SECTOR-05 ,WAVE CITY, GHAZIABAD
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units564
Unit Types3
Blocks5
Floors32
Inventory
Apartments (135 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| TOWER-4 | GF | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 1 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 2 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 3 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 4 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 5 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 6 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 7 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 8 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 9 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 10 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 11 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 12 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 13 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 14 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 15 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 16 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 17 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 18 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 19 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 20 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 21 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 22 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 23 | 3 BHK | 4 | 96.64 | 3 | — |
| TOWER-4 | 24 | 3 BHK | 4 | 96.64 | 3 | — |
| TOWER-4 | 25 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 26 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 27 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 28 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 29 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 30 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-4 | 31 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | GF | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 1 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 2 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 3 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 4 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 5 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 6 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 7 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 8 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 9 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 10 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 11 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 12 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 13 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 14 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 15 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 16 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 17 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 18 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 19 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 20 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 21 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 22 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 23 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 24 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 25 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 26 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 27 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 28 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 29 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 30 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-5 | 31 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | GF | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 1 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 2 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 3 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 4 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 5 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 6 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 7 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 8 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 9 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 10 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 11 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 12 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 13 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 14 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 15 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 16 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 17 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 18 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 19 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 20 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 21 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 22 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 23 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 24 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 25 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 26 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 27 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 28 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 29 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 30 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-6 | 31 | 3 BHK | 4 | 94.64 | 3 | — |
| TOWER-7 | GF | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 1 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 2 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 3 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 4 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 5 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 6 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 7 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 8 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 9 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 10 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 11 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 12 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 13 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 14 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 15 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 16 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 17 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 18 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 19 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 20 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 21 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 22 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 23 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 24 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 25 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 26 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 27 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 28 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 29 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 30 | 3 BHK | 4 | 103.84 | 3 | — |
| TOWER-7 | 31 | 3 BHK | 4 | 103.84 | 3 | — |
| CONVENIENT SHOP | BSMNT | OTHER | 1 | 992.44 | 0 | — |
| CONVENIENT SHOP | GF | SHOP | 2 | 14.97 | 0 | — |
| CONVENIENT SHOP | GF | SHOP | 15 | 14.65 | 0 | — |
| CONVENIENT SHOP | 1 | SHOP | 2 | 14.97 | 0 | — |
| CONVENIENT SHOP | 1 | SHOP | 15 | 14.65 | 0 | — |
| CONVENIENT SHOP | 2 | SHOP | 2 | 14.97 | 0 | — |
| CONVENIENT SHOP | 2 | SHOP | 15 | 14.65 | 0 | — |
Permits & Approvals
Permit NoGDA/BP/23-24/1411
Permit Date2024-07-01
Valid Until2029-06-30
Extendable Until2032-06-29
Documents
Filing documents
- Other Plan(If Any)
- Details of Encumbrances#New(2024-09-10)View
- Commencement Certificate#New(2024-09-04)View
- Other Plan(If Any)#New(2024-09-16)View
- Proforma of Application Form#New(2024-07-26)View
- Proforma of Allotment Letter#New(2024-07-26)View
- Proforma of Conveyance Deed#New(2024-07-26)View
- Proforma of Completion Certificate(Occupancy)#New(2024-07-26)View
- Waste Disposal Plan#New(2024-07-26)View
- Water Supply Plan#New(2024-07-26)View
- Electricity Supply Plan#New(2024-07-26)View
- Development Work Plan#New(2024-07-26)View
- Affidavit (Form-B)#New(2024-09-09)View
- CA CERTIFICATE#New(2024-09-04)View
- ARCHITECT CERTIFICATE#New(2024-09-04)View
- ENGINEERS CERTIFICATE#New(2024-07-26)View
- Other#New(2024-07-26)View
- Proforma of Agreement for Sale#New(2024-08-08)View
Land documents
- Extract of Khatauni#2024-2025(1900-01-01)View11575074614.pdf
- Extract of Khatauni#2024-2025(1900-01-01)View11575071627.pdf
- Extract of Khatauni#2024-2025(1900-01-01)View11575074172.pdf
- Extract of Khatauni#2024-2025(1900-01-01)View11575079118.pdf
- Extract of Khatauni#2024-2025(1900-01-01)View11575077405.pdf
- Registry Document#6152(2010-12-23)View11575079368.pdf
- Lease Deed#P201231(2010-06-23)View11575074863.pdf
- Registry Document#071999(2005-11-17)View11575071597.pdf
- Lease Deed#R083759(2010-06-18)View11575077436.pdf
- Lease Deed#P201231(2010-06-23)View11575078435.pdf
- Lease Deed#P201231(2010-06-23)View11575073309.pdf
- Registry Document#A133716(2009-06-27)View11575077154.pdf
- Registry Document#A131742(2009-06-27)View11575076404.pdf
- Registry Document#6152(2010-12-23)View11575074522.pdf
- Registry Document#563110(2010-01-11)View11575077258.pdf
- Lease Deed#P201231(2010-06-23)View11575075558.pdf
- Registry Document#A131730(2009-06-27)View11575078353.pdf
- Extract of Khatauni#2023-2024(1900-01-01)View11575075647.pdf
- Extract of Khatauni#2023-2024(1900-01-01)View11575074332.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575077010.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575073873.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575071267.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575079035.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575076321.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575072567.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575075283.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575072226.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575075767.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575075032.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575078367.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View11575078168.pdf
- Extract of Khatauni#2023-2024(1900-01-01)View11575077490.pdf
Project Team
Architect AddressC-1, SECTOR-3, NOIDA UTTAR PRADESH PIN-201301
Engineer Address202 AND, HIMLAND HOUSE, COMMERCIAL COMPLEX, KARAMPURA, NEW DELHI-110015
Developer & Contact
Developer
Promoter NameUppal Chadha Hi-Tech Developers Pvt. Ltd.
Promoter AddressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
Company TypeCompany
Mobile7290016520
Emailrera@wavecity.in
Registered AddressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
Contractor AddressSECTOR-17, LIMEWOOD ENCLAVE, WAVE CITY, KACHERA VILLAGE, WAVE CITY, GHAZIABAD
Bank Accounts
Account Typecollection
Account Number12261100000473
Account NameUCHDPL COLLECTION ACCOUNT FOR EDEN
Bank NamePUNJAB AND SIND BANK
BranchKAUSHAMBI ,GHAZIABAD
Branch AddressSHOP NO.-14 A, NEAR WAVE CINEMA, KAUSHAMBI, GHAZIABAD, UTTAR PARDESH -201010
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCPSIB0021226
Branch Emailk1226atpsb.co.in
Account Typeseparate
Account Number12261100000474
Account NameUCHDPL SEPARATE ACCOUNT FOR EDEN
Bank NamePUNJAB AND SIND BANK
BranchKAUSHAMBI, GHAZIABAD
Branch AddressSHOP NO. -14 A, NEAR WAVE CINEMA, KAUSHAMBI, GHAZIABAD , UTTAR PARDESH -201010
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCPSIB0021226
Branch Emailk1226atpsb.co.in
Account Typetransaction
Account Number12261100000475
Account NameUCHDPL RERA TRANSACTION ACCOUNT FOR EDEN
Bank NamePUNJAB AND SIND BANK
BranchKAUSHAMBI, GHAZIABAD
Branch AddressSHOP NO. -14A, NEAR WAVE CINEMA, KAUSHAMBI, GHAZIABAD, UTTAR PRADESH-201010
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCPSIB0021226
Branch Emailk1226atpsb.co.in
Development & Facilities
Development works
Demarcation Of PlotsPlots Demarcated as per Approved Layout.
Boundary WallBoundary wall shall be made with standard Fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m.
Road WorkWidth (m) Width of Carriage way (m) Width of Footpath (m) GSB 9mm) WMM (mm) RCC (mm) 9 m 9 0 150 100 200 Note; Cross Sections are enclosed as Annexure
FootpathsWidth (m) Width of Footpath (m) GSB (mm) RCC (mm) NA 2100 75 150
Water Supply Including Drinking Water Facilities1) The Water supply planned to provide 24 x 7 Water supply. 2) CPVC/UPVC-SC40/80 pipe for water supply network. 3) 1155 KL RCC storage tanks (770 KL UGT and 220 KL OHT). 4) Tube-Wells.
Sewer System1) DWC pipe class SN4 has been used. 2) Manholes/Chambers made with Brick Masonry in Conical shape ranging from dia 900 to 1500mm.
Drain1) RCC pipe class NP2 has been used. 2) Manholes/Chambers made with Brick Masonry in Conical shape with dia 900mm to 1500mm.
ParksWire Fencing along boundary, Grassing and tree Plantation.
Tree PlantingOne Tree on one side of 9m road.
Design For Electric Supply Including Street Lighting1) 3150 KVA Dry Type Transformer (33kv/415 V) -2nos. 2) 5m cast Iron Pole with GI Ribbed /Grooved extrusion and single arm bracket Street light poles with 75 watt cast iron LED fixture. 3) Feeder Panels-4 way, 6 way, 8way and 12 way.
Community Buildings29000 sqft. (aprx.) Club facility in planned for the proposed development.
Treatment And Disposal System Of Sewage And Sullage Water565 KLD STP is planned with the premise.
Solid Waste Management And Disposal System1) Collection shall be ensured from each household. 2) Segregation and waste treatment within the premises. 3) Organic waste is composted with the help of Automatic organic waste converter machine.
Water Conservation SystemRain water harvesting pits planned in green areas of the proposed development.
Energy Management System Including Use Of Renewable EnergyNA.
Fire Protection And Fire Safety SystemFire staircase and FHC , is planned at each floor as per NBC requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA.
Emergency Evacuation ServicesFire staircase planned as per NBC requirement.
Other Miscellaneous WorkNA.
Financials
Registration Fee (₹)111000
Project Duration (months)58