Registered
Total units
384
Overview
Registration Date2022-08-09
RERA NumberUPRERAPRJ422981
Promoter IDUPRERAPRM5538
Proposed Start2022-07-01
Proposed Completion2027-03-22
Location
DistrictGhaziabad
TehsilGhaziabad
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units384
Unit Types2
Blocks3
Floors9
Khasra records (11)
Show all 11 khasra rows
- 381· Khasra· 57657 m²
- 382· Khasra· 263306 m²
- 383· Khasra· 16226 m²
- 383· Khasra· 86773 m²
- 387· Khasra· 1260 m²
- 390· Khasra· 507164 m²
- 391· Khasra· 174962 m²
- 392· Khasra· 588528 m²
- 393· Khasra· 8885 m²
- 411· Khasra· 3414 m²
- 412· Khasra· 800 m²
Inventory
Apartments (51 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Tower-F | GF | OTHER | 0 | 0 | 0 | — |
| Tower-F | 1 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 1 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 2 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 2 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 3 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 3 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 4 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 4 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 5 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 5 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 6 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 6 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 7 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 7 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 8 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-F | 8 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-G | GF | OTHER | 0 | 0 | 0 | — |
| Tower-G | 1 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-G | 1 | 3 BHK | 8 | 93.5 | 3 | — |
| Tower-G | 2 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-G | 2 | 3 BHK | 8 | 93.5 | 3 | — |
| Tower-G | 3 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-G | 3 | 3 BHK | 8 | 93.5 | 3 | — |
| Tower-G | 4 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-G | 4 | 3 BHK | 8 | 93.5 | 3 | — |
| Tower-G | 5 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-G | 5 | 3 BHK | 8 | 93.5 | 3 | — |
| Tower-G | 6 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-G | 6 | 3 BHK | 8 | 93.5 | 3 | — |
| Tower-G | 7 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-G | 7 | 3 BHK | 8 | 93.5 | 3 | — |
| Tower-G | 8 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-G | 8 | 3 BHK | 8 | 93.5 | 3 | — |
| Tower-H | GF | OTHER | 0 | 0 | 0 | — |
| Tower-H | 1 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-H | 1 | 3 BHK | 24 | 93.5 | 3 | — |
| Tower-H | 2 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-H | 2 | 3 BHK | 24 | 93.5 | 3 | — |
| Tower-H | 3 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-H | 3 | 3 BHK | 24 | 93.5 | 3 | — |
| Tower-H | 4 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-H | 4 | 3 BHK | 24 | 93.5 | 3 | — |
| Tower-H | 5 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-H | 5 | 3 BHK | 24 | 93.5 | 3 | — |
| Tower-H | 6 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-H | 6 | 3 BHK | 24 | 93.5 | 3 | — |
| Tower-H | 7 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-H | 7 | 3 BHK | 24 | 93.5 | 3 | — |
| Tower-H | 8 | 3 BHK | 4 | 93.5 | 3 | — |
| Tower-H | 8 | 3 BHK | 24 | 93.5 | 3 | — |
Permits & Approvals
Permit NoGDA/BP/21-22/0454
Permit Date2022-03-23
Valid Until2027-03-22
Extendable Until2030-03-22
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Application Form
- Proforma of Allotment Letter
- Other
- Details of Encumbrances#New(2022-05-26)View
- Commencement Certificate#New(2022-05-26)View
- Other Plan(If Any)#New(2022-07-05)View
- Proforma of Application Form#New(2022-07-05)View
- Proforma of Allotment Letter#New(2022-07-05)View
- Proforma of Conveyance Deed#New(2022-05-26)View
- Proforma of Completion Certificate(Occupancy)#New(2022-05-26)View
- Waste Disposal Plan#New(2022-07-18)View
- Water Supply Plan#New(2022-05-26)View
- Electricity Supply Plan#New(2022-07-18)View
- Development Work Plan#New(2022-05-26)View
- Affidavit (Form-B)#New(2022-05-26)View
- CA CERTIFICATE#New(2022-07-04)View
- ARCHITECT CERTIFICATE#New(2022-05-26)View
- ENGINEERS CERTIFICATE#New(2022-05-26)View
- Other#New(2022-07-05)View
Project Team
Architect AddressCosmos Sector-134, Noida
Engineer Address202 and 203, Himland House, Commercial Complex, Karampura, New Delhi-110015
Developer & Contact
Developer
Promoter NameUppal Chadha Hi-Tech Developers Pvt. Ltd.
Promoter AddressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
Company TypeCompany
Mobile7290016520
Emailrera@wavecity.in
Registered AddressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
Contractor AddressM/s. Chandralekha Infrastruture Pvt. Ltd. D-171 2nd Floor Sector-63, Noida, Uttar Pradesh
Bank Accounts
Account Typecollection
Account Number003872500000402
Account NameUCHDPL COLLECTION ACCOUNT FOR ELIGO
Bank NameYES BANK
BranchYES BANK, RAJNAGAR DIST, CENTRE, GHAZIABAD
Branch AddressRAJNAGAR DIST, CENTRE GHAZIABAD
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCYESB0000038
Account Typeseparate
Account Number003872500000728
Account NameUCHDPL SEPARATE BANK ACCOUNT FOR ELIGO
Bank NameYES BANK
BranchYES BANK, RAJNAGAR DIST, CENTRE, GHAZIABAD
Branch AddressRAJNAGAR DIST, CENTRE GHAZIABAD
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCYESB0000038
Account Typetransaction
Account Number023563700003232
Account NameUCHDPL TRANSACTION ACCOUNT FOR ELIGO
Bank NameYES BANK
BranchYES BANK, NEHRU PLACE, NEW DELHI
Branch AddressNEHRU PLACE, NEW DELHI
Branch DistrictSelect
Branch StateDelhi
IFSCYESB0000235
Development & Facilities
Development works
Demarcation Of PlotsPlots demarcated as per Approved layout of building plan.
Boundary WallBoundary wall shall be made with standard Fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m
Road WorkWidth (m) Width of Carriage way (m) Width of Footpath (m) GSB (mm) WMM (mm) Interlocking tiles over sand bed (mm) 11.5 6 - 150 100 65 12.0 12 - 150 100 65 13.0 7.5 - 150 100 65 14.5 9.0 - 150 100 65
FootpathsWidth (m) Width of Footpath (m) GSB (mm) Interlocking and tiles over sand bed (mm) 11.5 - - - 12.0 - - - 13.0 - - - 14.5 - - -
Water Supply Including Drinking Water FacilitiesThe water supply system planned to provide 24 x 7 water supply. HDPE pipe PN-8, PE-80 for water supply network RCC storage tank s (4x65 KL UGT) 2 Nos. Tube-wells
Sewer SystemRCC pipe class NP2 has been proposed Manhole/Chambers made with Brick Masonry in Conical shape ranging from dia 900 to 1500mm
DrainRCC pipe class NP2 has been used Manhole/Chambers made with Brick Masonry in Conical shape with dia 900mm
ParksWire fencing along boundary, Grassing and tree Plantation
Tree PlantingOne Tree on one side of 9m road and 7.5m road Both side trees on 12m and 18m road
Design For Electric Supply Including Street LightingCompact substation 1 x 2000 KVA and 1 x 630 KVA 5m Cast Iron Pole with GI Ribbed/Grooved extrusion and single arm bracket Street light poles with 55 watt Cast Iron LED fixture. Feeder panels-6 way, 8 way and 12 way.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage Water250 KLD STP with MBBR Technology is planned within the premise.
Solid Waste Management And Disposal SystemDoor to Door Collection shall be ensured from each household. Segregation waste treatment facility at Sec-6. Organic waste in composed with the help of Automatic organic waste converter machine.
Water Conservation System2 Nos. Modular type rain water harvesting pits panned in green areas of the proposed development.
Energy Management System Including Use Of Renewable EnergyUse of LED lights with lower LPDs (Lighting Power Density) when compared to baseline set by ECBC. Installation solar PV cells as required capacity synched with power supply grid are being proposed to meet requirements of EIA Authorities. Energy Metering to regulate the usage of electricity. Efficient equipments like motors, pumps ACs Lifts, etc. Zero use of Hydro-chlorofluorocarbon (HCFC) refrigerants in (HVAC) equipment and Unitary Air-Conditioners installed in the building(s). Use of halon free fire suppression equipment.
Fire Protection And Fire Safety SystemFire staircase and FHC, is planned at each tower and floor as per NBC requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA.
Emergency Evacuation ServicesFire staircase Planned as per NBC requirement.
Other Miscellaneous WorkNA.
Financials
Registration Fee (₹)90500
Project Duration (months)57