Registered
Total units
170
Overview
Registration Date2023-06-10
RERA NumberUPRERAPRJ869140
Promoter IDUPRERAPRM9311
Proposed Start2023-04-01
Proposed Completion2027-03-31
Location
DistrictGhaziabad
TehsilGhaziabad
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units170
Unit Types4
Blocks24
Floors6
Khasra records (1)
- 112· Khasra· 12570 m²
Inventory
Apartments (90 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Commercial | BSMNT | OTHER | 0 | 200 | 0 | — |
| Commercial | GF | SHOP | 4 | 15 | 0 | — |
| Club/Community | BSMNT | OTHER | 0 | 293 | 0 | — |
| Type-1/Tower-A/5 Nos. | BSMNT | OTHER | 0 | 2788 | 0 | — |
| Type-1/Tower-A-1 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-1 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-1 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-1 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-1 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-2 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-2 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-2 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-2 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-2 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-3 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-3 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-3 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-3 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-3 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-4 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-4 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-4 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-4 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-4 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-5 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-5 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-5 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-5 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-A-5 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-B/2 Nos. | BSMNT | OTHER | 0 | 1100 | 0 | — |
| Type-1/Tower-B-1 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-B-1 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-B-1 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-B-1 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-B-1 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-B-2 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-B-2 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-B-2 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-B-2 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-B-2 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C/5 Nos. | BSMNT | OTHER | 0 | 2490 | 0 | — |
| Type-1A/Tower-C1 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-C1 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-C1 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1A/Tower-C1 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C2 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C2 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C2 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C2 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C2 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C3 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C3 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C3 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C3 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C3 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C4 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C4 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C4 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C4 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C4 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C5 | GF | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C5 | 1 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C5 | 2 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C5 | 3 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-1/Tower-C5 | 4 | 4 BHK | 2 | 135.25 | 3 | — |
| Type-2/Tower-D/3 Nos | BSMNT | OTHER | 0 | 1497 | 0 | — |
| Type-2/Tower-D-1 | GF | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-1 | 1 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-1 | 2 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-1 | 3 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-1 | 4 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-2 | GF | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-2 | 1 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-2 | 2 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-2 | 3 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-2 | 4 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-3 | GF | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-3 | 1 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-3 | 2 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-3 | 3 | 4 BHK | 2 | 126.87 | 2 | — |
| Type-2/Tower-D-3 | 4 | 4 BHK | 2 | 126.87 | 2 | — |
| Commercial | 1 | STUDIO | 4 | 30.31 | 1 | 0 |
| Commercial | 2 | STUDIO | 4 | 27.27 | 1 | 0 |
| Commercial | 3 | STUDIO | 4 | 25.58 | 1 | 0 |
| Commercial | 4 | STUDIO | 4 | 33.78 | 1 | 0 |
| Tower-1A/Tower C1 | GF | 4 BHK | 2 | 135.25 | 3 | 0 |
| Club/Community | GF | OTHER | 0 | 249.25 | 0 | 0 |
| Club/Community | 1 | OTHER | 0 | 249.25 | 1 | 0 |
| Club/Community | 2 | OTHER | 0 | 249.25 | 1 | 0 |
| Club/Community | 3 | OTHER | 0 | 249.25 | 1 | 0 |
Permits & Approvals
Permit NoGroup Housing/03936/GDA/BP/21-22/1313/19102022
Permit Date2022-11-17
Valid Until2027-11-16
Extendable Until2027-11-16
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2023-05-17)View
- Commencement Certificate#New(2023-06-01)View
- Other Plan(If Any)#New(2023-04-28)View
- Proforma of Application Form#New(2023-04-28)View
- Proforma of Allotment Letter#New(2023-04-28)View
- Proforma of Conveyance Deed#New(2023-04-28)View
- Proforma of Completion Certificate(Occupancy)#New(2023-06-01)View
- Waste Disposal Plan#New(2023-04-28)View
- Water Supply Plan#New(2023-04-28)View
- Electricity Supply Plan#New(2023-04-28)View
- Development Work Plan#New(2023-04-28)View
- Affidavit (Form-B)#New(2023-04-28)View
- CA CERTIFICATE#New(2023-05-02)View
- ARCHITECT CERTIFICATE#New(2023-05-02)View
- ENGINEERS CERTIFICATE#New(2023-05-02)View
- Other#New(2023-04-28)View
Project Team
Architect AddressA-244, KAUSHAMBI, GHAZIABAD, UTTAR PRADESH
Engineer AddressPLOT NO. 1088, FIRST FLOOR, NITIKHAND-1, INDIRAPURAM, GHAZIABAD-201014
Developer & Contact
Developer
Promoter NameUninav Developers Pvt. Ltd.
Promoter AddressM/s Uninav Developers Pvt. Ltd. Plot No. 330 Ist Floor Patparganj Functional Industrial estate Delhi-92
Company TypeCompany
Mobile9650099588
Emailinfo@uninavdevelopers.com
Registered AddressM/s Uninav Developers Pvt. Ltd. Plot No. 330 Ist Floor Patparganj Functional Industrial estate Delhi-92
Contractor AddressPLOT NO. 1465, GROUND FLOOR, SECTOR-5, VASUNDHARA, GHAZIABAD, U.P.
Bank Accounts
Account Typecollection
Account Number50200078752122
Account NameUNINAV DEVELOPERS PVT LTD COLLECTION A/C FOR UNINAV UTOPIA
Bank NameHDFC BANK LTD
BranchRAJ NAGAR EXTENSIOIN
Branch AddressRAJ NAGAR EXTENSION GHAZIABAD
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0009481
Account Typeseparate
Account Number50200078803154
Account NameUNINAV DEVELOPERS PVT LTD SEPARATE A/C FOR UNINAV UTOPIA
Bank NameHDFC BANK LTD
BranchRAJ NAGAR EXTENSION
Branch AddressRAJ NAGAR EXTENSION GHAZIABAD
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0009481
Account Typetransaction
Account Number59232000000111
Account NameUNINAV DEVELOPERS PVT LTD TRANSACTION A/C FOR UNINAV UTOPIA
Bank NameHDFC BANK LTD
BranchHDFC BANK LTD , RAJ NAGAR EXTENSION
Branch AddressSHOP NO-116, 1ST FLOOR, VVIP MALL, GHAZIABAD, UP
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0009481
Development & Facilities
Development works
Demarcation Of PlotsCovered by temporary sheets on the point given by the patwari
Boundary Wall7ft height boundary wall of RCC wall/column and brick work as per drawings
Road WorkCement Concrete Road over the subbase 200mm thick GSB+2 layer of WBM
Footpaths75mm high from the road level with cc interlocking tiles over the subbase of 100mm thick P.C.C. and 50mm thick bed of fine sand.
Water Supply Including Drinking Water Facilitieswater connection for the domestic uses will be provided be the concerned authority and storage will be done in under ground water tank of the capacity as per the norms
Sewer Systemmain sewer line has been designed as per norms and pvc pipe of 10kg pressure will be used in the vertical stags in the shafts, partially sewer line will be lay in basement ceiling and sill finally connect to STP.
Drainunderground pipeline drain will be lay in slops as per norms and collecting chambers as per the norms will be provide to collect the surface rain water.
ParksSoft Landscape will be done in the park with sufficient electrical lightning
Tree Plantingtree plantation of the different variable of trees as per the site conditions are planned by follows the authority guidelines
Design For Electric Supply Including Street LightingM.S. street light designer poles with energy saving LED lightning fixtures will be used. partially light will be operated from the solar panel will installed on the terrace.
Community BuildingsFramed RCC Structure
Treatment And Disposal System Of Sewage And Sullage WaterSTP will be installed as basement for treated the sewer and treated water will be recycled for use in flushing and gardening
Solid Waste Management And Disposal Systemwill be done be the external vendors by collecting the garbage from the dustbin/shops and segreggate the same for the recycling the dry waste and prepare the compost from the wet waste
Water Conservation Systemrain water harvesting pit has plan in the open area for recharge the ground water by collect the rain water from terrace and road surface area
Energy Management System Including Use Of Renewable Energysolar panel will be installed on the terrace for the conservation if the electricity as per the norms of MOE
Fire Protection And Fire Safety Systemsystem will be provide as per the fire department guidelines by fulfill the fire norms as per the NBCC
Social Infrastructure And Other Public Amenities Including Public Health Servicesshall be provided as per building bye laws of Ghaziabad development authority
Emergency Evacuation Servicesseparate fire stair case is designed for evacuation service in the building
Other Miscellaneous Workas per the requirement on period of time
Financials
Registration Fee (₹)68000
Project Duration (months)48