Registered
Total units
112
Overview
Registration Date2023-06-30
RERA NumberUPRERAPRJ879513
Promoter IDUPRERAPRM219211
Proposed Start2023-06-01
Proposed Completion2027-05-31
Location
DistrictGhaziabad
TehsilGhaziabad
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units112
Unit Types2
Blocks1
Floors6
Khasra records (1)
- 971,972,973, part of 974 and 975· Khasra· 4102 m²
Inventory
Apartments (97 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Vasant Square | BSMNT | SHOP | 2 | 14.69 | 0 | — |
| Vasant Square | BSMNT | SHOP | 2 | 14.84 | 0 | — |
| Vasant Square | BSMNT | SHOP | 2 | 15.11 | 0 | — |
| Vasant Square | BSMNT | SHOP | 1 | 18.96 | 0 | — |
| Vasant Square | BSMNT | SHOP | 1 | 20.65 | 0 | — |
| Vasant Square | BSMNT | SHOP | 3 | 21.24 | 0 | — |
| Vasant Square | BSMNT | SHOP | 1 | 24.02 | 0 | — |
| Vasant Square | BSMNT | SHOP | 1 | 51.16 | 0 | — |
| Vasant Square | BSMNT | SHOP | 1 | 69.1 | 0 | — |
| Vasant Square | BSMNT | SHOP | 1 | 116.74 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 11.35 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 15.83 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 18.58 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 18.86 | 0 | — |
| Vasant Square | GF | SHOP | 2 | 19.94 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 20.12 | 0 | — |
| Vasant Square | GF | SHOP | 2 | 20.18 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 20.21 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 20.59 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 21.18 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 21.24 | 0 | — |
| Vasant Square | GF | SHOP | 2 | 21.38 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 21.4 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 21.74 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 21.82 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 22.38 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 22.56 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 23.76 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 23.79 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 24.94 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 25.56 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 25.68 | 0 | — |
| Vasant Square | GF | SHOP | 2 | 25.82 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 27.72 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 28.56 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 29.11 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 29.78 | 0 | — |
| Vasant Square | GF | SHOP | 3 | 37.73 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 203.88 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 11.35 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 14.19 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 14.21 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 14.51 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 15.83 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 17.24 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 17.32 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 17.51 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 17.78 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 18.71 | 0 | — |
| Vasant Square | 1 | SHOP | 2 | 19.94 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 20.18 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 20.19 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 20.67 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 20.81 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 21.18 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 21.24 | 0 | — |
| Vasant Square | 1 | SHOP | 2 | 21.38 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 21.4 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 21.46 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 21.69 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 21.74 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 22.66 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 23.53 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 24.07 | 0 | — |
| Vasant Square | 1 | SHOP | 3 | 37.73 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 44.2 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 44.82 | 0 | — |
| Vasant Square | 1 | SHOP | 1 | 248.89 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 15.83 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 17.24 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 17.56 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 17.78 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 18.71 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 20.19 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 20.67 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 20.81 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 21.18 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 21.38 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 21.4 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 21.69 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 22.66 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 23.53 | 0 | — |
| Vasant Square | 2 | SHOP | 1 | 24.07 | 0 | — |
| Vasant Square | 2 | OTHER | 1 | 396.35 | 0 | — |
| Vasant Square | 2 | OTHER | 1 | 397.22 | 0 | — |
| Vasant Square | 2 | OTHER | 1 | 421.92 | 0 | — |
| Vasant Square | 3 | SHOP | 1 | 48.77 | 0 | — |
| Vasant Square | 3 | SHOP | 1 | 50.52 | 0 | — |
| Vasant Square | 3 | SHOP | 1 | 51.81 | 0 | — |
| Vasant Square | 3 | SHOP | 1 | 51.85 | 0 | — |
| Vasant Square | 3 | SHOP | 1 | 62.57 | 0 | — |
| Vasant Square | 3 | SHOP | 1 | 74.48 | 0 | — |
| Vasant Square | 4 | OTHER | 1 | 20.3 | 0 | — |
| Vasant Square | 4 | OTHER | 1 | 137.26 | 0 | — |
| Vasant Square | 4 | OTHER | 1 | 138.82 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 25.14 | 0 | — |
| Vasant Square | GF | SHOP | 1 | 26.83 | 0 | — |
Permits & Approvals
Permit NoMultiplex/03442/GDA/BP/21-22/1487/16072022
Permit Date2023-03-20
Valid Until2028-03-19
Extendable Until2029-03-19
Documents
Filing documents
- Proforma of Conveyance Deed
- Proforma of Completion Certificate(Occupancy)
- Affidavit (Form-B)
- General body resolution for AoA (if Authorized Entity is AoA)
- Notarized Affidavit for completion of balance development work
- Other
- Details of Encumbrances#New(2023-06-20)View
- Commencement Certificate#New(2023-05-29)View
- Other Plan(If Any)#New(2023-05-30)View
- Proforma of Application Form#New(2023-06-19)View
- Proforma of Allotment Letter#New(2023-05-31)View
- Proforma of Conveyance Deed#New(2023-06-19)View
- Waste Disposal Plan#New(2023-05-30)View
- Water Supply Plan#New(2023-05-30)View
- Electricity Supply Plan#New(2023-05-30)View
- Development Work Plan#New(2023-05-30)View
- Affidavit (Form-B)#New(2023-05-30)View
- CA CERTIFICATE#New(2023-05-30)View
- ARCHITECT CERTIFICATE#New(2023-05-30)View
- ENGINEERS CERTIFICATE#New(2023-05-30)View
- Other#New(2023-05-30)View
Project Team
Architect AddressC-55,East of Kailash, New Delhi-110065
Engineer AddressC-55, East of Kailash, New Delhi-110065
Developer & Contact
Developer
Promoter NameFastech Developers LLP
Promoter AddressA-153, SECTOR 136, NOIDA, DIST- GAUTAM BUDH NAGAR, UTTAR PRADESH-201301
Company TypePartnership Firm
Mobile9811161295
Emailvasantsquare.info@gmail.com
Registered AddressA-153, SECTOR 136, NOIDA, DIST- GAUTAM BUDH NAGAR, UTTAR PRADESH-201301
Contractor AddressSF-08, Second Floor, Cross River Mall, Karkardooma, Delhi-110092
Bank Accounts
Account Typecollection
Account Number251111128122
Account NameFASTECH DEVELOPERS LLP-FOR VASANT SQUARE PROJECT-COLLECTION ACCOUNT
Bank NameINDUSIND BANK
BranchINDUSIND BANK, RAJ NAGAR, GHAZIABAD
Branch AddressRAJ NAGAR, GHAZIABAD
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCINDB0000171
Account Typeseparate
Account Number252222228122
Account NameFASTECH DEVELOPERS LLP-FOR VASANT SQUARE PROJECT-SEPARATE ACCOUNT
Bank NameINDUSIND BANK
BranchINDUSIND BANK, RAJ NAGAR, GHAZIABAD
Branch AddressRAJ NAGAR, GHAZIABAD
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCINDB0000171
Account Typetransaction
Account Number250000028122
Account NameFASTECH DEVELOPERS LLP-FOR VASANT SQUARE PROJECT-SEPRATE ACCOUNT
Bank NameINDUSIND BANK
BranchINDUSIND BANK, RAJ NAGAR, GHAZIABAD
Branch AddressRAJ NAGAR, GHAZIABAD
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCINDB0000171
Development & Facilities
Development works
Demarcation Of PlotsProperty no. 80, situated at Mohalla Kallupura part of khasra no. 971, 972, 973 part of khasra no. 974 and part of khasra no. 975 Village Bhonja, now known as Vasant Chitra Mandir, situated at Nehru Nagar, Ghaziabad - 201001 area admeasuring 4102 sq. mtrs. has been demarcated and in the possession of the promoter.
Boundary Wall2100 mm high boundary wall with 450 mm high brick and plaster wall and above 1650 mm high steel grill between two R.C.C column approx 4.5 meters center to center, as per architect drawing.
Road WorkAll roads in the complex will be in combination of concrete pavers of different colors, shape and thickness.
FootpathsAll footpath in the complex will be in combination of concrete pavers of different colours, shape and thickness.
Water Supply Including Drinking Water FacilitiesPotable water supply from underground collection tank and pumped to overhead water tank located at the top floor terrace. The supply of water shall be from the said overhead water tank.
Sewer SystemThe sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading directly to the sewage line provided by the municipal corporation.
DrainRain water shall be collected in the drains connected to the underground cement concrete pipeline. For discharge, water will be collected in main hole to be constructed in periphery of complex and these main holes shall be finally connected with the drain of Ghaziabad Nagar Nigam.
ParksThe trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the service / usage in the project.
Tree PlantingThe trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrances in the service / usage in the project.
Design For Electric Supply Including Street LightingTransformers shall be used along with necessary switch-gear for distributing electricity at LT voltage. All street / landscape lightning shall be LED based.
Community BuildingsNot Applicable
Treatment And Disposal System Of Sewage And Sullage WaterSTP shall be provided, Treated water shall be used for flushing, irrigation, carwash, pathway cleaning and excess water shall be discharged in to the municipal sewer as per site.
Solid Waste Management And Disposal SystemSolid waste collection chamber proposed in each tower. Recyclable and non-recyclable waste will be disposed through a local approved agency.
Water Conservation SystemRain water harvesting facilities shall be provided and treated sewage water shall be recycled to the extent feasible.
Energy Management System Including Use Of Renewable EnergyN.A
Fire Protection And Fire Safety SystemFire NOC UID no. UPFS/2022/57770/GZB/Ghaziabad/3798/JD and fire tender path shall be provided as per NBC. Fire fighting system along with pumps and water storage tanks shall be provided as per NBC and NOC from the fire department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesFire staircase has been provided as per approved drawing for evacuation.
Other Miscellaneous WorkNot Applicable
Financials
Registration Fee (₹)52000
Project Duration (months)48