Registered
Total units
153
Overview
Registration Date2025-03-25
RERA NumberUPRERAPRJ367395/03/2025
Promoter IDUPRERAPRM326003
Proposed Start2025-04-01
Proposed Completion2030-01-23
Location
DistrictAyodhya
TehsilSadar(Faizabad)
VillageKudha Keshavpur
Locality14-Kosi Parikrama Marg, Darshan Nagar
AddressKhasra number 228, 229 & 230
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units153
Unit Types3
Blocks1
Floors14
Khasra records (1)
- 228,229,230· Khasra· 318242 m²
Inventory
Apartments (64 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Tower 1 | 2 | OTHER | 0 | 0 | 0 | — |
| Tower 1 | 3 | STUDIO | 1 | 24.82 | 0 | — |
| Tower 1 | 3 | STUDIO | 9 | 29 | 0 | — |
| Tower 1 | 3 | STUDIO | 1 | 24.5 | 0 | — |
| Tower 1 | 3 | STUDIO | 2 | 37.2 | 1 | — |
| Tower 1 | 3 | STUDIO | 1 | 37.2 | 1 | — |
| Tower 1 | 3 | STUDIO | 1 | 34.93 | 1 | — |
| Tower 1 | 4 | STUDIO | 1 | 24.82 | 0 | — |
| Tower 1 | 4 | STUDIO | 9 | 29 | 0 | — |
| Tower 1 | 4 | STUDIO | 1 | 24.5 | 0 | — |
| Tower 1 | 4 | STUDIO | 2 | 37.2 | 1 | — |
| Tower 1 | 4 | STUDIO | 1 | 37.2 | 1 | — |
| Tower 1 | 4 | STUDIO | 1 | 34.93 | 1 | — |
| Tower 1 | 5 | STUDIO | 1 | 24.82 | 0 | — |
| Tower 1 | 5 | STUDIO | 9 | 29 | 0 | — |
| Tower 1 | 5 | STUDIO | 1 | 24.5 | 0 | — |
| Tower 1 | 5 | STUDIO | 2 | 37.2 | 1 | — |
| Tower 1 | 5 | STUDIO | 1 | 37.2 | 1 | — |
| Tower 1 | 5 | STUDIO | 1 | 34.93 | 1 | — |
| Tower 1 | 6 | STUDIO | 1 | 24.82 | 0 | — |
| Tower 1 | 6 | STUDIO | 9 | 29 | 0 | — |
| Tower 1 | 6 | STUDIO | 1 | 24.5 | 0 | — |
| Tower 1 | 6 | STUDIO | 2 | 37.2 | 1 | — |
| Tower 1 | 6 | STUDIO | 1 | 37.2 | 1 | — |
| Tower 1 | 6 | STUDIO | 1 | 34.93 | 1 | — |
| Tower 1 | 7 | STUDIO | 1 | 24.82 | 0 | — |
| Tower 1 | 7 | STUDIO | 9 | 29 | 0 | — |
| Tower 1 | 7 | STUDIO | 1 | 24.5 | 0 | — |
| Tower 1 | 7 | STUDIO | 2 | 37.2 | 1 | — |
| Tower 1 | 7 | STUDIO | 1 | 37.2 | 1 | — |
| Tower 1 | 7 | STUDIO | 1 | 34.93 | 1 | — |
| Tower 1 | 8 | STUDIO | 1 | 24.82 | 0 | — |
| Tower 1 | 8 | STUDIO | 9 | 29 | 0 | — |
| Tower 1 | 8 | STUDIO | 1 | 24.5 | 0 | — |
| Tower 1 | 8 | STUDIO | 2 | 37.2 | 1 | — |
| Tower 1 | 8 | STUDIO | 1 | 37.2 | 1 | — |
| Tower 1 | 8 | STUDIO | 1 | 34.93 | 1 | — |
| Tower 1 | 9 | STUDIO | 1 | 24.82 | 0 | — |
| Tower 1 | 9 | STUDIO | 9 | 29 | 0 | — |
| Tower 1 | 9 | STUDIO | 1 | 24.5 | 0 | — |
| Tower 1 | 9 | STUDIO | 2 | 37.2 | 1 | — |
| Tower 1 | 9 | STUDIO | 1 | 37.2 | 1 | — |
| Tower 1 | 9 | STUDIO | 1 | 34.93 | 1 | — |
| Tower 1 | 10 | STUDIO | 1 | 24.82 | 0 | — |
| Tower 1 | 10 | STUDIO | 9 | 29 | 0 | — |
| Tower 1 | 10 | STUDIO | 1 | 24.5 | 0 | — |
| Tower 1 | 10 | STUDIO | 2 | 37.2 | 1 | — |
| Tower 1 | 10 | STUDIO | 1 | 37.2 | 1 | — |
| Tower 1 | 10 | STUDIO | 1 | 34.93 | 1 | — |
| Tower 1 | 11 | STUDIO | 1 | 24.82 | 0 | — |
| Tower 1 | 11 | STUDIO | 9 | 29 | 0 | — |
| Tower 1 | 11 | STUDIO | 1 | 24.5 | 0 | — |
| Tower 1 | 11 | STUDIO | 2 | 37.2 | 1 | — |
| Tower 1 | 11 | STUDIO | 1 | 37.2 | 1 | — |
| Tower 1 | 11 | STUDIO | 1 | 34.93 | 1 | — |
| Tower 1 | 12 | STUDIO | 1 | 24.82 | 0 | — |
| Tower 1 | 12 | STUDIO | 9 | 29 | 0 | — |
| Tower 1 | 12 | STUDIO | 1 | 24.5 | 0 | — |
| Tower 1 | 12 | STUDIO | 2 | 37.2 | 1 | — |
| Tower 1 | 12 | STUDIO | 1 | 37.2 | 1 | — |
| Tower 1 | 12 | STUDIO | 1 | 34.93 | 1 | — |
| Tower 1 | BSMNT | SHOP | 1 | 404.79 | 0 | — |
| Tower 1 | GF | SHOP | 1 | 325.98 | 0 | — |
| Tower 1 | 1 | SHOP | 1 | 655.83 | 0 | — |
Permits & Approvals
Permit NoHOTEL/03971/AFDA/BP/24-25/0436/30122024
Permit Date2025-01-24
Valid Until2030-01-23
Extendable Until2033-01-23
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2025-03-19)View
- Commencement Certificate#New(2025-01-30)View
- Other Plan(If Any)#New(2025-02-17)View
- Proforma of Application Form#New(2025-02-19)View
- Proforma of Allotment Letter#New(2025-02-15)View
- Proforma of Conveyance Deed#New(2025-02-15)View
- Waste Disposal Plan#New(2025-01-30)View
- Water Supply Plan#New(2025-01-30)View
- Electricity Supply Plan#New(2025-01-30)View
- Development Work Plan#New(2025-01-30)View
- Affidavit (Form-B)#New(2025-02-19)View
- CA CERTIFICATE#New(2025-02-17)View
- ARCHITECT CERTIFICATE#New(2025-02-17)View
- ENGINEERS CERTIFICATE#New(2025-02-15)View
- Other#New(2025-02-24)View
- Proforma of Agreement for Sale#New(2025-02-15)View
Project Team
Architect AddressF-1, First Floor, Mira Corporate Suites, Ishwar Nagar, New Delhi 110065
Engineer AddressB-24, Sector 67, Noida, UP 201301
Developer & Contact
Developer
Promoter NameAurika Developers LLP
Promoter AddressUnit No. OF-1102 Plot C-3, E-1 Gulshan One29 Sec-129 , Chhaprauli Bengar, Noida - 201304, Uttar Pradesh
Company TypeLimited Liability Partnership (LLP)
Mobile9821276686
Emailinfo@aurikahomes.com
Registered AddressUnit No. OF-1102 Plot C-3, E-1 Gulshan One29 Sec-129 , Chhaprauli Bengar, Noida - 201304, Uttar Pradesh
Contractor AddressSector 129, Noida
Bank Accounts
Account Typecollection
Account Number57500001663428
Account NameAURIKA DEVELOPERS LLP COLLECTION ACCOUNT FOR VEDA
Bank NameHDFC BANK LIMITED
BranchRAM PATH AYODHYA BRANCH
Branch AddressC P AWAS VIKAS COLONY AWADHPURI YOJNA AYODHYA UTTAR PRADESH 224001
Branch DistrictAyodhya
Branch StateSelect
IFSCHDFC0009505
Branch Emailsushil.vartak@hdfcbank.com
Account Typeseparate
Account Number57500001662072
Account NameAURIKA DEVELOPERS LLP SEPARATE BANK ACCOUNT FOR VEDA
Bank NameHDFC BANK LIMITED
BranchRAM PATH AYODHYA BRANCH
Branch AddressC P AWAS VIKAS COLONY AWADHPURI YOJNA UTTAR PRADESH 224001
Branch DistrictAyodhya
Branch StateUttar Pradesh
IFSCHDFC0009505
Account Typetransaction
Account Number57500001663750
Account NameAURIKA DEVELOPERS LLP RERA TRANSACTION ACCOUNT FOR VEDA
Bank NameHDFC BANK LIMITED
BranchRAM PATH AYODHYA BRANCH
Branch AddressC P AWAS VIKAS COLONY AWADHPURI YOJNA AYODHYA UTTAR PRADESH 224001
Branch DistrictAyodhya
Branch StateUttar Pradesh
IFSCHDFC0009505
Development & Facilities
Development works
Demarcation Of PlotsThe plot area 3182 sqm and the same will be demarcated as per the plan provided by Ayodhya development authority and survey drawing.
Boundary WallWell defined plot boundaries proposed to ensure the security and privacy of the project. 1.8m high boundary wall will be constructed in combination of Brickwork and RCC.
Road Work6.0M wide road is proposed around the building block. Road will be finished with 80mm thick concrete paver laid over designed layer of GSB and WMM.
FootpathsNA
Water Supply Including Drinking Water FacilitiesWater supply will be provided by the bore well and for safe and continuous water supply an underground storage and water treatment plant is proposed.
Sewer SystemDevelopment of a sewerage system to collect wastewater generated within the complex including treatment and disposal of wastewater or sewage. Onsite Sewage treatment plant is proposed for the same.
DrainDevelopment of drainage system within the site to manage surface water and storm water. This drainage system will be connected to the rainwater harvesting pits to recharge ground water.
ParksNA
Tree PlantingTrees of various species will be planted along the periphery of the plot. The trees will be a mix of evergreen and flowering trees.
Design For Electric Supply Including Street LightingPower supply from electricity board and street lighting as per approved building plan. The lighting will be adequate to lit up the dark spaces and all the driveways.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterCentralized sewage treatment plant is proposed within the project. The STP will treat all the sewage generate in the project and the recycled water will be utilized in flushing and irrigation purposes.
Solid Waste Management And Disposal SystemCollection, storage and disposal will be done as per sanction and NBC. Collection of solid waste in the segregated system will be done so that the recyclable waste can be separated in an efficient way from the wet kitchen waste.
Water Conservation SystemRainwater harvesting system is being proposed to conserve rainwater and dual flush system is proposed along with water efficient plumbing fixture.
Energy Management System Including Use Of Renewable EnergyLED lights will be used withing the project and use of solar PV plant will also be explored.
Fire Protection And Fire Safety SystemAs per the fire drawings approved by fire department installation of fire protection systems and safety measures to prevent and mitigate fire hazard as specified in NBC.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesAs per the approved building plan and fire approvals, fire staircases are being provided. All fire exit passage shall be kept clear all the time and proper as well as fire drill will be done in operation phase.
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)42000
Project Duration (months)58