Victory Tower

by SHERVANI INDUSTRIAL SYNDICATE LIMITED

Prayagraj, Uttar Pradesh · UPRERAPRJ946758

Registered

Total units

534

Overview

Registration Date2023-01-10
RERA NumberUPRERAPRJ946758
Promoter IDUPRERAPRM9630
Proposed Start2023-01-01
Proposed Completion2028-06-30

Location

DistrictPrayagraj
TehsilAllahabad
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units534
Unit Types4
Blocks2
Floors14

Khasra records (19)

Show all 19 khasra rows
  • 132· Khasra· 414
  • 127· Khasra· 110580
  • 123· Khasra· 157320
  • 122· Khasra· 1647
  • 121· Khasra· 59850
  • 116· Khasra· 46
  • 120· Khasra· 1512
  • 133· Khasra· 119350
  • 136· Khasra· 549
  • 117· Khasra· 960
  • 128· Khasra· 114
  • 137· Khasra· 1710
  • 138· Khasra· 250
  • 150· Khasra· 42173
  • 124· Khasra· 1140
  • 126· Khasra· 2170
  • 125· Khasra· 1030
  • 119· Khasra· 860
  • 118· Khasra· 800

Inventory

Apartments (272 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
TOWER 1GFSHOP214.8640
TOWER 1GFSHOP113.0960
TOWER 1GFSHOP113.9450
TOWER 1GFSHOP115.5190
TOWER 1GFSHOP113.7480
TOWER 1GFSHOP113.50
TOWER 112 BHK381.712
TOWER 112 BHK278.344
TOWER 112 BHK276.032
TOWER 112 BHK178.84
TOWER 112 BHK278.63
TOWER 113 BHK1106.254
TOWER 112 BHK180.134
TOWER 113 BHK21084
TOWER 113 BHK5102.634
TOWER 114 BHK1140.73
TOWER 122 BHK381.712
TOWER 122 BHK278.344
TOWER 122 BHK276.032
TOWER 122 BHK178.84
TOWER 122 BHK278.63
TOWER 123 BHK1106.254
TOWER 122 BHK180.134
TOWER 123 BHK21084
TOWER 123 BHK5102.634
TOWER 124 BHK1140.73
TOWER 132 BHK381.712
TOWER 132 BHK278.344
TOWER 132 BHK276.032
TOWER 132 BHK178.84
TOWER 132 BHK278.63
TOWER 133 BHK1106.254
TOWER 132 BHK180.134
TOWER 133 BHK21084
TOWER 133 BHK5102.634
TOWER 134 BHK1140.73
TOWER 142 BHK381.712
TOWER 142 BHK278.344
TOWER 142 BHK276.032
TOWER 142 BHK178.84
TOWER 142 BHK278.63
TOWER 143 BHK1106.254
TOWER 142 BHK180.134
TOWER 143 BHK21084
TOWER 143 BHK5102.634
TOWER 144 BHK1140.73
TOWER 152 BHK381.712
TOWER 152 BHK278.344
TOWER 152 BHK276.032
TOWER 152 BHK178.84
TOWER 152 BHK278.63
TOWER 153 BHK1106.254
TOWER 152 BHK180.134
TOWER 153 BHK21084
TOWER 153 BHK5102.634
TOWER 154 BHK1140.73
TOWER 162 BHK381.712
TOWER 162 BHK278.344
TOWER 162 BHK276.032
TOWER 162 BHK178.84
TOWER 162 BHK278.63
TOWER 163 BHK1106.254
TOWER 162 BHK180.134
TOWER 163 BHK21084
TOWER 163 BHK5102.634
TOWER 164 BHK1140.73
TOWER 172 BHK381.712
TOWER 172 BHK278.344
TOWER 172 BHK276.032
TOWER 172 BHK178.84
TOWER 172 BHK278.63
TOWER 173 BHK1106.254
TOWER 172 BHK180.134
TOWER 173 BHK21084
TOWER 173 BHK5102.634
TOWER 174 BHK1140.73
TOWER 182 BHK381.712
TOWER 182 BHK278.344
TOWER 182 BHK276.032
TOWER 182 BHK178.84
TOWER 182 BHK278.63
TOWER 183 BHK1106.254
TOWER 182 BHK180.134
TOWER 183 BHK21084
TOWER 183 BHK5102.634
TOWER 184 BHK1140.73
TOWER 192 BHK381.712
TOWER 192 BHK278.344
TOWER 192 BHK276.032
TOWER 192 BHK178.84
TOWER 192 BHK278.63
TOWER 193 BHK1106.254
TOWER 192 BHK180.134
TOWER 193 BHK21084
TOWER 193 BHK5102.634
TOWER 194 BHK1140.73
TOWER 1102 BHK381.712
TOWER 1102 BHK278.344
TOWER 1102 BHK276.032
TOWER 1102 BHK178.84
TOWER 1102 BHK278.63
TOWER 1103 BHK1106.254
TOWER 1102 BHK180.134
TOWER 1103 BHK21084
TOWER 1103 BHK5102.634
TOWER 1104 BHK1140.73
TOWER 1112 BHK381.712
TOWER 1112 BHK278.344
TOWER 1112 BHK276.032
TOWER 1112 BHK178.84
TOWER 1112 BHK278.63
TOWER 1113 BHK1106.254
TOWER 1112 BHK180.134
TOWER 1113 BHK21084
TOWER 1113 BHK5102.634
TOWER 1114 BHK1140.73
TOWER 1122 BHK381.712
TOWER 1122 BHK278.344
TOWER 1122 BHK276.032
TOWER 1122 BHK178.84
TOWER 1122 BHK278.63
TOWER 1123 BHK1106.254
TOWER 1122 BHK180.134
TOWER 1123 BHK21084
TOWER 1123 BHK5102.634
TOWER 1124 BHK1140.73
TOWER 1132 BHK381.712
TOWER 1132 BHK278.344
TOWER 1132 BHK276.032
TOWER 1132 BHK178.84
TOWER 1132 BHK278.63
TOWER 1133 BHK1106.254
TOWER 1132 BHK180.134
TOWER 1133 BHK21084
TOWER 1133 BHK5102.634
TOWER 1134 BHK1140.73
TOWER 2GFSHOP214.8640
TOWER 2GFSHOP113.0960
TOWER 2GFSHOP113.9450
TOWER 2GFSHOP115.5190
TOWER 2GFSHOP113.7480
TOWER 2GFSHOP113.50
TOWER 212 BHK381.712
TOWER 212 BHK278.344
TOWER 212 BHK276.032
TOWER 212 BHK178.84
TOWER 212 BHK278.63
TOWER 213 BHK1106.254
TOWER 212 BHK180.134
TOWER 213 BHK21084
TOWER 213 BHK5102.634
TOWER 214 BHK1140.73
TOWER 222 BHK381.712
TOWER 222 BHK278.344
TOWER 222 BHK276.032
TOWER 222 BHK178.84
TOWER 222 BHK278.63
TOWER 223 BHK1106.254
TOWER 222 BHK180.134
TOWER 223 BHK21084
TOWER 223 BHK5102.634
TOWER 224 BHK1140.73
TOWER 232 BHK381.712
TOWER 232 BHK278.344
TOWER 232 BHK276.032
TOWER 232 BHK178.84
TOWER 232 BHK278.63
TOWER 233 BHK1106.254
TOWER 232 BHK180.134
TOWER 233 BHK21084
TOWER 233 BHK5102.634
TOWER 234 BHK1140.73
TOWER 242 BHK381.712
TOWER 242 BHK278.344
TOWER 242 BHK276.032
TOWER 242 BHK178.84
TOWER 242 BHK278.63
TOWER 243 BHK1106.254
TOWER 242 BHK180.134
TOWER 243 BHK21084
TOWER 243 BHK5102.634
TOWER 244 BHK1140.73
TOWER 252 BHK381.712
TOWER 252 BHK278.344
TOWER 252 BHK276.032
TOWER 252 BHK178.84
TOWER 252 BHK278.63
TOWER 253 BHK1106.254
TOWER 252 BHK180.134
TOWER 253 BHK21084
TOWER 253 BHK5102.634
TOWER 254 BHK1140.73
TOWER 262 BHK381.712
TOWER 262 BHK278.344
TOWER 262 BHK276.032
TOWER 262 BHK178.84
TOWER 262 BHK278.63
TOWER 263 BHK1106.254
TOWER 262 BHK180.134
TOWER 263 BHK21084
TOWER 263 BHK5102.634
TOWER 264 BHK1140.73
TOWER 272 BHK381.712
TOWER 272 BHK278.344
TOWER 272 BHK276.032
TOWER 272 BHK178.84
TOWER 272 BHK278.63
TOWER 273 BHK1106.254
TOWER 272 BHK180.134
TOWER 273 BHK21084
TOWER 273 BHK5102.634
TOWER 274 BHK1140.73
TOWER 282 BHK381.712
TOWER 282 BHK278.344
TOWER 282 BHK276.032
TOWER 282 BHK178.84
TOWER 282 BHK278.63
TOWER 283 BHK1106.254
TOWER 282 BHK180.134
TOWER 283 BHK21084
TOWER 283 BHK5102.634
TOWER 284 BHK1140.73
TOWER 292 BHK381.712
TOWER 292 BHK278.344
TOWER 292 BHK276.032
TOWER 292 BHK178.84
TOWER 292 BHK278.63
TOWER 293 BHK1106.254
TOWER 292 BHK180.134
TOWER 293 BHK21084
TOWER 293 BHK5102.634
TOWER 294 BHK1140.73
TOWER 2102 BHK381.712
TOWER 2102 BHK278.344
TOWER 2102 BHK276.032
TOWER 2102 BHK178.84
TOWER 2102 BHK278.63
TOWER 2103 BHK1106.254
TOWER 2102 BHK180.134
TOWER 2103 BHK21084
TOWER 2103 BHK5102.634
TOWER 2104 BHK1140.73
TOWER 2112 BHK381.712
TOWER 2112 BHK278.344
TOWER 2112 BHK276.032
TOWER 2112 BHK178.84
TOWER 2112 BHK278.63
TOWER 2113 BHK1106.254
TOWER 2112 BHK180.134
TOWER 2113 BHK21084
TOWER 2113 BHK5102.634
TOWER 2114 BHK1140.73
TOWER 2122 BHK381.712
TOWER 2122 BHK278.344
TOWER 2122 BHK276.032
TOWER 2122 BHK178.84
TOWER 2122 BHK278.63
TOWER 2123 BHK1106.254
TOWER 2122 BHK180.134
TOWER 2123 BHK21084
TOWER 2123 BHK5102.634
TOWER 2124 BHK1140.73
TOWER 2132 BHK381.712
TOWER 2132 BHK278.344
TOWER 2132 BHK276.032
TOWER 2132 BHK178.84
TOWER 2132 BHK278.63
TOWER 2133 BHK1106.254
TOWER 2132 BHK180.134
TOWER 2133 BHK21084
TOWER 2133 BHK5102.634
TOWER 2134 BHK1140.73

Permits & Approvals

Permit NoPDA/BP/22-23/0263
Permit Date2022-11-15
Valid Until2027-11-14
Extendable Until2030-11-14

Documents

Filing documents

  • Proforma of Completion Certificate(Occupancy)
  • Other
  • Details of Encumbrances#New(2022-12-19)
    View
  • Commencement Certificate#New(2022-12-13)
    View
  • Other Plan(If Any)#New(2022-12-19)
    View
  • Proforma of Application Form#New(2022-12-13)
    View
  • Proforma of Allotment Letter#New(2022-12-13)
    View
  • Proforma of Conveyance Deed#New(2022-12-13)
    View
  • Waste Disposal Plan#New(2022-12-19)
    View
  • Water Supply Plan#New(2022-12-19)
    View
  • Electricity Supply Plan#New(2022-12-19)
    View
  • Development Work Plan#New(2022-12-19)
    View
  • Affidavit (Form-B)#New(2022-12-19)
    View
  • CA CERTIFICATE#New(2022-12-20)
    View
  • ARCHITECT CERTIFICATE#New(2022-12-20)
    View
  • ENGINEERS CERTIFICATE#New(2022-12-19)
    View
  • Other#New(2023-01-03)
    View

Land documents

  • Sale Deed#Bahi No.1, Zild No. 331, S.No. 525(1966-02-26)
    6292661534Sale_Deed_of project.pdf
    View
  • Extract of Khatauni#1420-1425(1900-01-01)
    6292668493Khatauni.pdf
    View
  • Extract of Khatauni#Name change Certificate from MCA(1900-01-01)
    6292662424Name change certificate_MCA.pdf
    View

Project Team

Architect Address52/25-B, MUIR ROAD, JUHI COLONY, PRAYAGRAJ, U.P.-211001
Engineer Address7/121 (B), SWAROOP NAGAR, KANPUR- 208002

Developer & Contact

Developer

Promoter NameSHERVANI INDUSTRIAL SYNDICATE LIMITED
Promoter AddressShervani Nagar, Sulem Sarai, Harwara Allahabad-211011
Company TypeCompany
Mobile9415218149
Emailsiddiquisadiq@rediffmail.com
Registered AddressShervani Nagar, Sulem Sarai, Harwara Allahabad-211011
Contractor AddressShervani Nagar, Sulem Sarai, Harwara Prayagraj-211011

Bank Accounts

Account Typecollection
Account Number41482607362
Account NameSISL Collection A/c for Victory Tower
Bank NameState Bank of India
BranchSME Branch
Branch Address2 SP marg, Paryagraj
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCSBIN0003126
Account Typeseparate
Account Number41456458445
Account NameSISL Separate A/c for Victory Tower
Bank NameState Bank of India
BranchSME Branch
Branch Address2 SP marg, Paryagraj
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCSBIN0003126
Account Typetransaction
Account Number41482536252
Account NameSISL Transaction A/c for Victory Tower
Bank NameState Bank of India
BranchSME Branch
Branch Address2 SP marg, Paryagraj
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCSBIN0003126

Development & Facilities

Development works

Demarcation Of PlotsWe have one plot of size 18094.73 sq. mtr.having entrance gate from the road.
Boundary Wall2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
Road WorkFrom the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. Whose wideness starts from 6 mtr.
FootpathsWe would not provide any footpath
Water Supply Including Drinking Water FacilitiesWe will provide Two nos. of pump for the requirement of blocks through underground pipelines.
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall go to the STP and overflow from the STP shall be connected with the Municipal sewerage system.when come into force.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
ParksWe will provide green area with the different activities
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, and DG backup for common service like External lighting, Fountain, STP, Pump room etc.
Community BuildingsCommunity hall will be provided
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,
Solid Waste Management And Disposal System"There are a proper garbage collection area provided for the solid waste management."
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemThis Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesStaircases out of which 4 are Fire Staircases with fire resistant doors are provided in building, and basements have 1 (one) access and exit Ramp and in case of emergency 8 Staircases are also provided. Dedicated assembly areas are also defined on the campus. Adequate signage is also provided.
Other Miscellaneous WorkNA

Financials

Registration Fee (₹)95500
Project Duration (months)66