Overview

Registration Date2022-03-30
RERA NumberUPRERAPRJ700245
Promoter IDUPRERAPRM164745
Proposed Start2021-06-26
Proposed Completion2027-02-03

Location

DistrictGhaziabad
TehsilGhaziabad
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew

Khasra records (2)

  • 1313· Khasra· 5600
  • 1312· Khasra· 3470

Permits & Approvals

Permit NoPlotted Resi development/ Plotted Housing/ 10127/ GDA/ LD/ 20-21/ 0970/ 03042021
Permit Date2022-02-05
Valid Until2027-02-04
Extendable Until2027-02-04

Documents

Filing documents

  • Details of Encumbrances
  • Other Plan(If Any)
  • Proforma of Application Form
  • Proforma of Allotment Letter
  • Proforma of Conveyance Deed
  • Proforma of Completion Certificate(Occupancy)
  • Water Supply Plan
  • Affidavit (Form-B)
  • CA CERTIFICATE
  • ARCHITECT CERTIFICATE
  • ENGINEERS CERTIFICATE
  • Other
  • Details of Encumbrances#New(2022-03-10)
    View
  • Commencement Certificate#New(2022-02-18)
    View
  • Proforma of Application Form#New(2022-03-10)
    View
  • Proforma of Allotment Letter#New(2022-03-10)
    View
  • Proforma of Conveyance Deed#New(2022-03-10)
    View
  • Waste Disposal Plan#New(2022-03-10)
    View
  • Water Supply Plan#New(2022-03-10)
    View
  • Electricity Supply Plan#New(2022-02-18)
    View
  • Development Work Plan#New(2022-02-18)
    View
  • Affidavit (Form-B)#New(2022-03-10)
    View
  • CA CERTIFICATE#New(2022-03-10)
    View
  • ARCHITECT CERTIFICATE#New(2022-03-10)
    View
  • ENGINEERS CERTIFICATE#New(2022-03-10)
    View
  • Other#New(2022-03-10)
    View

Land documents

  • Extract of Khatauni#1427-1432(1900-01-01)
    3851173820Title deed final.pdf
    View

Project Team

Architect AddressD-201, BLUEMOON RESIDENCY, RAJ NAGAR EXTENSION
Engineer AddressPOCKET-8, PLOT NO. 245, SECTOR-23, ROHINI, NEW DELHI-110085

Developer & Contact

Developer

Promoter NameVAIKUNTAM BUILDCON PRIVATE LIMITED
Promoter AddressKH. NO. 920, NEAR A. K. CHILDREN ACADEMY, MORTI, GHAZIABAD, UTTAR PRADESH - 201001
Company TypeCompany
Mobile9873859971
Emailvishaltyagi@hotmail.com
Registered AddressKH. NO. 920, NEAR A. K. CHILDREN ACADEMY, MORTI, GHAZIABAD, UTTAR PRADESH - 201001
Contractor AddressC-70, FIRST FLOOR, SECTOR-8, NOIDA

Bank Accounts

Account Typecollection
Account Number922020012266178
Account NameVaikuntam Buildcon Private Limited- Collection Account for VILASAA
Bank NameAxis Bank
BranchVVIP Mall Rajnagar Extension Ghaziabad.
Branch AddressVVIP Mall Rajnagar Extension Ghaziabad
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCUTIB0004428
Account Typeseparate
Account Number922020011998487
Account NameVaikuntam Buildcon Private limited- Separate Bank Account for Vilasaa
Bank NameAxis Bank
BranchVVIP Mall Rajnagar Extension Ghaziabad
Branch AddressVVIP Mall Rajnagar Extension Ghaziabad
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCUTIB0004428
Account Typetransaction
Account Number922020011837186
Account NameVaikunatam Buildcon Private Limited- Rera Transaction Account for Vilasaa
Bank NameAxis Bank
BranchVVIP Mall Rajnagar Extension Ghaziabad
Branch AddressVVIP Mall Rajnagar Extension Ghaziabad
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCUTIB0004428

Development & Facilities

Development works

Demarcation Of PlotsAs per approved drawings, Demarcation of plots was done by Total Station Machine
Boundary Wall(i) RCC Cum brick wall having thickness of 230 mm. (ii) Height of the boundary wall will be 6 feet from 0-0 level.
Road WorkTwo 9 m Roads having length of 70 m each and one 7.5 m road having length of 75 m will be constructed. The road will be constructed in several steps- (i) 3 times backfilling of soil. (ii) After each step of soil feeling, compaction and curing will be done. (iii) 2 times GSB layering having thickness of 150 mm each one 6 m of width on 9 m road and 4.5 m of width on 7.5 m of road, then compaction and curing will be done. (iv) WBM Bituminous layer of thickness 150 mm.
FootpathsOn the remaining 3 m compacted soil (1.5m on each side), we will lay interlocking tiles on the footpath.
Water Supply Including Drinking Water FacilitiesFor every individual Villa, drinking water connection through 90 degree dia PVC line.
Sewer SystemSewer System will be constructed in following steps- (i) Excavation as per level of sewer in approved drawings (ii) PCC. (iii) NP3 pipes having 300 degree dia of slope in ration of 1/200 will be used in the sewer system. (iv) Backfilling of soil and plaster. (v) Waste water will discharge into sewer pipes, then sewer water will discharge into STP.
Drain(i) Excavation as per level of draining line in approved drawings. (ii) PCC (iii) NP3 pipes having 300 degree dia of slope in ratio of 1/200 will be used in the drainage system. (iv) Backfilling of soil and plaster (v) Drainage water will be discharged into the RWH pit by NP3 pipes.
Parks(i) 10 percentage of the total plot area which is 678.15 sq.m (ii) The level of the green area will be 75 mm down from road level.
Tree Planting(i) 35 trees will be plated in the green area. (ii) Different types of trees and flowers will be planted.
Design For Electric Supply Including Street Lighting(i) 25 KVA transformer will be placed. (ii) 3 m distance between two street lights. (iii) 9 feet height 0-0 level.
Community Buildings(i) Sector shopping provided having an area of 181.09 sq.m. (ii) Convenient shops provided having an area of 157.07 sq.m. (iii) Club house having an area of 73 sq.m.
Treatment And Disposal System Of Sewage And Sullage WaterSTP of 70 KLD will be provided having an area of 70 sq.m.
Solid Waste Management And Disposal SystemGarbage area provided having an area of 33.19 sq. m.
Water Conservation SystemRWH (Rain water harvesting) having an area of 10 sq.m. will be provided (i) 250mm 230mm dia bore filled with pea gravels. (ii) 160 degree PVC slotted pipe. (iii) 50-150 mm size boulders (iv) Mesh (v) Gravel 5-10 mm (vi) Coarse sand (1.5 to 2 mm) (vii) Geotextile (160 GSM) (viii) 600 x 600 x 100 mm RCC Deflector or stone slab
Energy Management System Including Use Of Renewable Energy(i) Electrical panel room and 100 percent power backup. (ii) Two 125 KVA D.G will be provided.
Fire Protection And Fire Safety System(i) Ring line having 150mm thickness. (ii) Extinguisher in each villa (iii) Fire tank of RCC. (Capacity as per drawings)
Social Infrastructure And Other Public Amenities Including Public Health Services(i) Gym (ii) Swimming pool (iii) Banquet hall
Emergency Evacuation Services(i) Fire Alarm system in panel room. (ii) NT smokers in all villas
Other Miscellaneous WorkAs per requirement

Financials

Registration Fee (₹)39000
Project Duration (months)68