Registered
Total units
47
Overview
Registration Date2022-04-12
RERA NumberUPRERAPRJ586892
Promoter IDUPRERAPRM3808
Proposed Start2022-03-01
Proposed Completion2026-10-29
Location
DistrictMathura
TehsilMathura
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units47
Unit Types2
Blocks1
Floors8
Khasra records (3)
- 1186· Khasra· 590 m²
- 1196· Khasra· 1350 m²
- 1194 ,1196· Khasra· 5570 m²
Inventory
Apartments (47 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| T1 | 1 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 1 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 1 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 1 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 1 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 1 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 2 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 2 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 2 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 2 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 2 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 2 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 3 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 3 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 3 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 3 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 3 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 3 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 4 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 4 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 4 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 4 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 4 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 4 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 5 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 5 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 5 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 5 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 5 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 5 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 6 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 6 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 6 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 6 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 6 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 6 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 7 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 7 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 7 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 7 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 7 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 7 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 8 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 8 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 8 | 1 BHK | 1 | 54.97 | 2 | — |
| T1 | 8 | 2 BHK | 1 | 82.81 | 3 | — |
| T1 | 8 | 2 BHK | 1 | 82.81 | 3 | — |
Permits & Approvals
Permit NoGroup Housing/01187/MVDA/BP/21-22/0135/07092021
Permit Date2021-10-30
Valid Until2026-10-29
Extendable Until2029-10-29
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Water Supply Plan
- Electricity Supply Plan
- Affidavit (Form-B)
- Details of Encumbrances#New(2022-02-24)View
- Commencement Certificate#New(2022-02-24)View
- Other Plan(If Any)#New(2022-02-24)View
- Proforma of Application Form#New(2022-02-24)View
- Proforma of Allotment Letter#New(2022-02-24)View
- Proforma of Conveyance Deed#New(2022-02-24)View
- Waste Disposal Plan#New(2022-02-24)View
- Water Supply Plan#New(2022-03-26)View
- Electricity Supply Plan#New(2022-03-26)View
- Development Work Plan#New(2022-02-24)View
- Affidavit (Form-B)#New(2022-02-24)View
- CA CERTIFICATE#New(2022-02-24)View
- ARCHITECT CERTIFICATE#New(2022-02-24)View
- ENGINEERS CERTIFICATE#New(2022-02-24)View
- Other#New(2022-02-24)View
Land documents
- Sale Deed#3859(2008-05-14)View3899463566Khasra No. 1186.pdf
- Sale Deed#1331(2008-02-14)View3899463105Khasra No. 1196.pdf
- Sale Deed#1089(2008-02-06)View3899466833Khasra No. 1194 & 1196.pdf
- Allotment Letter issued by Competent Authority#Affidavit(Sale)(2022-02-14)View3899464527Affidavit(Sale).pdf
- Extract of Khatauni#1428-1433(1900-01-01)View3899463982Khatauni 1186.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View3899467202Khatauni 1196.pdf
- Extract of Khatauni#1428-1433(1900-01-01)View3899466654Khatauni 1194.pdf
- Allotment Letter issued by Competent Authority#Reply Letter Dated 04.04.2022(2022-04-04)View3899469279Reply Letter Dated 04.04.2022.pdf
- Allotment Letter issued by Competent Authority#Time Extension Letter of Vrindakunj Project(2022-03-15)View3899467756Time Extension Letter of Vrinda Kunj Project.pdf
Project Team
Architect AddressH.No.1132, Sector 19, Faridabad
Engineer AddressA-112, Sector 18, NOIDA
Developer & Contact
Developer
Promoter NameShree Energy Developers Pvt. Ltd.
Promoter AddressGALLERIA HIGH STREET , REVENUE ESTATE, SECTOR-82, VILLAGE-BHATOLA, FARIDABAD-121001
Company TypeCompany
Mobile9871664343
Emailaccounts@shreeenergygroup.com
Registered AddressGALLERIA HIGH STREET , REVENUE ESTATE, SECTOR-82, VILLAGE-BHATOLA, FARIDABAD-121001
Contractor AddressAgrasen Nagar, Kosi Kalan, Mathura, Uttar Pradesh
Bank Accounts
Account Typecollection
Account Number922020006825084
Account NameShree Energy Developers Pvt. Ltd. Collection Account for Vrinda Kunj
Bank NameAxis Bank Limited
BranchVrindavan, Uttar Pradesh
Branch AddressVrindavan Chatikara Road, Opposite Kripalu Hospital, Vrindavan, Mathura, Uttar Pradesh,PIN-281121
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCUTIB0000794
Account Typeseparate
Account Number922020006259036
Account NameShree Energy Developers Pvt. Ltd. Separate Bank Account for Vrinda Kunj
Bank NameAxis Bank Limited
BranchVrindavan, Uttar Pradesh
Branch AddressVrindavan Chatikara Road, Opposite Kripalu Hospital, Vrindavan, Mathura, Uttar Pradesh, Pin- 281121
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCUTIB0000794
Account Typetransaction
Account Number922020006162204
Account NameShree Energy Developers Pvt. Ltd. RERA Transaction Account for Vrinda Kunj
Bank NameAxis Bank Limited
BranchVrindavan, Uttar Pradesh
Branch AddressVrindavan Chatikara Road, Opposite Kripalu Hospital, Vrindavan, Mathura, Uttar Pradesh, PIN- 281121
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCUTIB0000794
Development & Facilities
Development works
Demarcation Of PlotsKhasra No. 1196,1194,1186 MI, Vrinda Kunj Mauza, Sunrakh Banger, Behind Prem Mandir, Vrindavan, Mathura, Uttar Pradesh, PIN-281121.
Boundary WallYes, RCC and Brick Work.
Road WorkYes, 16MM Pavel Interlocking / Black Top as per Sanctioned Plans.
FootpathsYes, Footpaths will be constructed using interlocking as Per Sanctioned Plans.
Water Supply Including Drinking Water FacilitiesYes, Water Supply to be collected in under ground using water reservoirs and terrace tanks as per Plans.
Sewer SystemYes, Proper Sewerage will be constructed using RCC/ UPVC pipes as per drawings and will be treated with STP.STP treated water will be used as mentioned above and residual will be disposed of in government sewerage system.
DrainDraining system will be constructed using R.C.C. / PVC Pipes as per drawings.
ParksLandscaping , Horticulture work and Plantation as per sanctioned Plans.
Tree PlantingSufficient No. of Trees as per Sanctioned Plans will be planted in the Project.
Design For Electric Supply Including Street LightingHT electrical supply will be made by competent authority, a sub station (if required) will be set up in Project as per drawings and LT electrical supply/ Power backup.
Community BuildingsNO
Treatment And Disposal System Of Sewage And Sullage WaterSewerage Treatment Plant will be installed / constructed as per approved drawings. All sewerage will be treated and treated water will be used in flushing gardening
Solid Waste Management And Disposal SystemSolid Waste will be collected manually and disposal will be done.
Water Conservation SystemWater Conservation will be done by rain water harvesting system and through sewage treatment Plant ( STP)
Energy Management System Including Use Of Renewable EnergyGood quality and approved brand equipment will be used in sub station to minimize energy loss as per norms and approved drawings.
Fire Protection And Fire Safety SystemFire Fighting system including hydrant, sprinkler system, and fire alarms will be installed as per drawings. Fire escape staircase will be constructed as per drawings. Refuge area will be made as per norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesProper Water supply and sanitary facilities on Ground Floor of Every Tower
Emergency Evacuation ServicesFire staircase refuge area will provided as per requirement for evacuation in case of any emergency.
Other Miscellaneous WorkProper Security system including Security Guard, CCTV Cameras and controlled access will be made available.
Financials
Registration Fee (₹)34500
Project Duration (months)56