Whispering Woods (GH-14) Integrated Township
by M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
Lucknow, Uttar Pradesh · UPRERAPRJ380751
Total units
219
Overview
Registration Date2022-06-04
RERA NumberUPRERAPRJ380751
Promoter IDUPRERAPRM10813
Proposed Start2022-10-01
Proposed Completion2026-09-30
Location
DistrictLucknow
TehsilLucknow
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units219
Unit Types2
Blocks3
Floors26
Khasra records (1)
- 148, 234, 235, 238, 239, 240, 241, 242, 243, 248, 250, 252, 253, 254, 255, 256· Khasra· 1257995 m²
Inventory
Apartments (228 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Tower A | GF | OTHER | 0 | 0 | 0 | — |
| Tower A | 1 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 1 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 1 | OTHER | 0 | 0 | 0 | — |
| Tower A | 2 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 2 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 2 | OTHER | 0 | 0 | 0 | — |
| Tower A | 3 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 3 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 3 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 4 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 4 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 4 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 5 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 5 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 5 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 6 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 6 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 6 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 7 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 7 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 7 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 8 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 8 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 8 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 9 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 9 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 9 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 10 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 10 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 10 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 11 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 11 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 11 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 12 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 12 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 12 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 13 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 13 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 13 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 14 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 14 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 14 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 15 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 15 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 15 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 16 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 16 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 16 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 17 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 17 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 17 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 18 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 18 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 18 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 19 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 19 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 19 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 20 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 20 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 20 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 21 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 21 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 21 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 22 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 22 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 22 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 23 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 23 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 23 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 24 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower A | 24 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 24 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower A | 25 | 3 BHK | 1 | 129.21 | 1 | — |
| Tower A | 25 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower A | 25 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | GF | OTHER | 0 | 0 | 0 | — |
| Tower B | 1 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 1 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 1 | OTHER | 0 | 0 | 0 | — |
| Tower B | 2 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 2 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 2 | OTHER | 0 | 0 | 0 | — |
| Tower B | 3 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 3 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 3 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 4 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 4 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 4 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 5 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 5 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 5 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 6 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 6 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 6 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 7 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 7 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 7 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 8 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 8 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 8 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 9 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 9 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 9 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 10 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 10 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 10 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 11 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 11 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 11 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 12 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 12 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 12 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 13 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 13 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 13 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 14 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 14 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 14 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 15 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 15 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 15 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 16 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 16 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 16 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 17 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 17 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 17 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 18 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 18 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 18 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 19 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 19 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 19 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 20 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 20 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 20 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 21 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 21 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 21 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 22 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 22 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 22 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 23 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 23 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 23 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 24 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 24 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 24 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower B | 25 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower B | 25 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower B | 25 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | GF | OTHER | 0 | 0 | 0 | — |
| Tower C | 1 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 1 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 1 | OTHER | 0 | 0 | 0 | — |
| Tower C | 2 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 2 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 2 | OTHER | 0 | 0 | 0 | — |
| Tower C | 3 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 3 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 3 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 4 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 4 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 4 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 5 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 5 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 5 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 6 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 6 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 6 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 7 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 7 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 7 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 8 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 8 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 8 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 9 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 9 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 9 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 10 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 10 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 10 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 11 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 11 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 11 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 12 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 12 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 12 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 13 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 13 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 13 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 14 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 14 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 14 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 15 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 15 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 15 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 16 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 16 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 16 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 17 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 17 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 17 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 18 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 18 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 18 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 19 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 19 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 19 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 20 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 20 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 20 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 21 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 21 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 21 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 22 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 22 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 22 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 23 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 23 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 23 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 24 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 24 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 24 | 3 BHK | 1 | 136.64 | 4 | — |
| Tower C | 25 | 3 BHK | 1 | 129.21 | 2 | — |
| Tower C | 25 | 3 BHK | 1 | 129.35 | 2 | — |
| Tower C | 25 | 3 BHK | 1 | 136.64 | 4 | — |
Permits & Approvals
Permit NoGroup Housing/04823/LDA/BP/21-22/1194/16042022
Permit Date2022-05-06
Valid Until2027-05-05
Extendable Until2030-05-05
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2022-05-09)View
- Commencement Certificate#New(2022-05-10)View
- Other Plan(If Any)#New(2022-05-12)View
- Proforma of Application Form#New(2022-05-10)View
- Proforma of Allotment Letter#New(2022-05-10)View
- Proforma of Conveyance Deed#New(2022-05-10)View
- Waste Disposal Plan#New(2022-05-24)View
- Water Supply Plan#New(2022-05-24)View
- Electricity Supply Plan#New(2022-05-24)View
- Development Work Plan#New(2022-05-10)View
- Affidavit (Form-B)#New(2022-05-12)View
- CA CERTIFICATE#New(2022-05-12)View
- ARCHITECT CERTIFICATE#New(2022-05-10)View
- ENGINEERS CERTIFICATE#New(2022-05-10)View
- Other#New(2022-05-12)View
Land documents
- Registry Document#5396(2015-04-18)View4422527017Transfer Deed No. 5396.pdf
- Lease Deed#9652(2015-05-24)View4422528799REG NO. 9652 GS Land.pdf
- Sale Deed#9010(2014-06-05)View4422528518REG.NO-9010.pdf
- Sale Deed#9011(2014-06-05)View4422528083REG.NO-9011.pdf
- Sale Deed#13433(2015-08-27)View4422524419REG.NO-13433.pdf
- Sale Deed#14590(2015-09-19)View4422529173REG.NO-14590.pdf
- Registry Document#4798(2015-04-09)View4422521809REG.NO-4798.pdf
- Extract of Khatauni#Land Area Details - Whispering Woods GH-14(1900-01-01)View4422529453Land Area Details_GH-14.pdf
- Extract of Khatauni#Khatauni extracts of all Khasra of the project land area(1900-01-01)View4422529183Khsra Details of GH-14.pdf
- Extract of Khatauni#Reply to objection letter dated 23.05.2022 - Whispering Woods GH-14(1900-01-01)View4422527140Reply of objection letter GH-14 Dt. 24.05.2022.pdf
Project Team
Architect AddressA-15, Pamposh Enclave, Greater Kailash-1, New Delhi-110048
Engineer AddressB-74, Sector 57, Noida-201301
Developer & Contact
Developer
Promoter NameM/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
Promoter Address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Company TypeCompany
Mobile8795427222
Emailhasnain.husain@shalimar.org
Registered Address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Contractor Address182-C, Eldeco Udyan-1, Lucknow-226002
Bank Accounts
Account Typecollection
Account Number42036164057
Account NameANS DPL COLLECTION A/C WHISPERING WOODS GH-14
Bank NameState Bank of India
BranchCommercial Branch, Lucknow
Branch Address6A, Way Road, Gokhle Marg, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166
Branch Emailambrish.dwivedi@sbi.co.in
Account Typeseparate
Account Number41599992586
Account NameANS DPL SEPARATE A/C WHISPERING WOODS GH-14
Bank NameState Bank of India
BranchCommercial Branch, Lucknow
Branch Address6A, Way Road, Gokhle Marg, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166
Branch Emailambrish.dwivedi@sbi.co.in
Account Typetransaction
Account Number42036164466
Account NameANS DPL TRANSACTION A/C WHISPERING WOODS GH-14
Bank NameState Bank of India
BranchCommercial Branch, Lucknow
Branch Address6A, Way Road, Gokhle Marg, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166
Branch Emailambrish.dwivedi@sbi.co.in
Development & Facilities
Development works
Demarcation Of PlotsAs per approved sanction plan.This is single plot rectangular shaped , having total 1 no. of entry gate and 1no. of exit gate from the 45 mtr wide front road and 24 mtr internal road. Site is surronded by 45 mtr road from North, 24 mtr road from East, green area plot from West and South with developers plot.
Boundary Wall1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.
Road WorkTrimix / asphalt road will be used as per deisgn suggested by the Architect for internal road.
FootpathsAll internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes as per landscape design.
Water Supply Including Drinking Water FacilitiesAll apartments shall be provided with domestic water for household activities and STP treated water for flushing. Ground water may also be used and user can have their individual RO system as per their requirement.The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.
Sewer SystemCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatement. after treatement ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
DrainStorm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
ParksThere is a significant green area beside building including green parks, play areas for childrens and different recretional activities.
Tree PlantingThe trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view.
Design For Electric Supply Including Street LightingWe have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,STP,Pump room etc.
Community BuildingsFully centralised AC Club House/community center is proposed, swimming pool and some temporary kiosks on the central atrium with sitting area of each building. Club comprises of mini-theatre,spa with steam and sauna ,swimming pools with changing rooms,yoga/medidation room, multipurpose hall ,Gymanasium,squash court,indoor playing areas etc.
Treatment And Disposal System Of Sewage And Sullage WaterCentralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
Solid Waste Management And Disposal SystemProject shall have waste segregation area and OWC for treatment of organic waste.The solid waste shall be encouraged for segregation with in all apartments. the dustbins shall be provided for segregated waste in the common areas. from where the bio waste shall be converted to manure through owc within the campus and other waste shall be handed over to the government vendors for further disposal.
Water Conservation SystemA well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Voltaic Panels to provide Renewable source of energy for common areas in building complex. Also timer control panels shall be used for efficient energy managemen.
Fire Protection And Fire Safety SystemAll Fire norms shall be followed as per NBC code and approval of fire department. fire sprinklers,smoke detectors,FHC with pumps are provided as per norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesThe Social infrastructure shall be provided with domestic water supply with tanks,STP treted water for flushing with tanks and irrigation ,storm /rain water drainage system,sewer drainage system,waste water drainage system,firefighting system including sprinklers ,FHC detectors ,fire water tank ,authority main power supply ,Dg power backup for essential common supply,lifts.
Emergency Evacuation ServicesFire Staricase is provided in the each building, with fire resistant doors, basements have 1 (one) accesse and exit in case of emergency. Dedicated assembly areas are also defined in the campus.Adequate signage is also provided.
Other Miscellaneous WorkNot applicable
Financials
Registration Fee (₹)68000
Project Duration (months)48