ZOOM ARCADE

by DBF INFRASTRUCTURE PVT LTD.

Ghaziabad, Uttar Pradesh · UPRERAPRJ640346/12/2025

Registered

Total units

162

Overview

Registration Date2025-12-22
RERA NumberUPRERAPRJ640346/12/2025
Promoter IDUPRERAPRM7295
Proposed Start2025-10-01
Proposed Completion2030-06-30

Location

DistrictGhaziabad
TehsilGhaziabad
VillageVillage Noor Nagar
LocalityRaj Nagar Extension
AddressKhasra No. 1183m and 1185m
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units162
Unit Types3
Blocks1
Floors9

Khasra records (1)

  • 1183M AND 1185M· Khasra· 4214

Inventory

Apartments (162 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
Hotel-16STUDIO148.012
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.262
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO128.992
Hotel-16STUDIO128.521
Hotel-16STUDIO128.521
Hotel-16STUDIO128.362
Hotel-16STUDIO121.821
Hotel-16STUDIO125.571
Hotel-16STUDIO125.571
Hotel-16STUDIO125.571
Hotel-16STUDIO125.571
Hotel-16STUDIO166.022
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-16STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO128.992
Hotel-17STUDIO128.521
Hotel-17STUDIO128.521
Hotel-17STUDIO126.362
Hotel-17STUDIO121.821
Hotel-17STUDIO125.571
Hotel-17STUDIO125.571
Hotel-17STUDIO125.571
Hotel-17STUDIO125.571
Hotel-17STUDIO166.021
Hotel-17STUDIO148.012
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.262
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-17STUDIO127.261
Hotel-18STUDIO148.012
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.262
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO127.261
Hotel-18STUDIO166.022
Hotel-1GFSHOP148.660
Hotel-1GFSHOP191.970
Hotel-1GFSHOP1111.380
Hotel-1GFSHOP1167.930
Hotel-1GFSHOP1155.820
Hotel-1GFSHOP1104.70
Hotel-1GFSHOP1170.570
Hotel-1GFSHOP1118.820
Hotel-11SHOP148.660
Hotel-11SHOP191.970
Hotel-11SHOP1111.380
Hotel-11SHOP1167.930
Hotel-11SHOP1155.820
Hotel-11SHOP1104.70
Hotel-11SHOP1118.820
Hotel-11SHOP1170.570
Hotel-12STUDIO127.281
Hotel-12STUDIO148.012
Hotel-12STUDIO127.261
Hotel-12STUDIO127.261
Hotel-12STUDIO127.261
Hotel-12STUDIO127.261
Hotel-12STUDIO127.261
Hotel-12STUDIO127.262
Hotel-12STUDIO125.571
Hotel-12STUDIO165.472
Hotel-13STUDIO148.012
Hotel-13STUDIO127.261
Hotel-13STUDIO127.261
Hotel-13STUDIO127.261
Hotel-13STUDIO127.261
Hotel-13STUDIO127.261
Hotel-13STUDIO127.281
Hotel-13STUDIO127.262
Hotel-13STUDIO125.571
Hotel-13STUDIO165.472
Hotel-15STUDIO148.012
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.262
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO128.992
Hotel-15STUDIO128.521
Hotel-15STUDIO128.521
Hotel-15STUDIO126.362
Hotel-15STUDIO121.821
Hotel-15STUDIO125.571
Hotel-15STUDIO125.571
Hotel-15STUDIO125.571
Hotel-15STUDIO125.571
Hotel-15STUDIO166.022
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-15STUDIO127.261
Hotel-1GFOTHER138.980
Hotel-1GFOTHER1102.20
Hotel-11OTHER153.470
Hotel-12OTHER1672.70
Hotel-14OTHER11412.680

Permits & Approvals

Permit NoHOTEL/08980/GDA/BP/24-25/10780/07052025
Permit Date2025-07-29
Valid Until2030-07-28
Extendable Until2033-07-27

Documents

Filing documents

  • Proforma of Completion Certificate(Occupancy)
  • Details of Encumbrances#New(2025-11-19)
    View
  • Commencement Certificate#New(2025-10-10)
    View
  • Other Plan(If Any)#New(2025-10-10)
    View
  • Proforma of Application Form#New(2025-10-10)
    View
  • Proforma of Allotment Letter#New(2025-10-10)
    View
  • Proforma of Conveyance Deed#New(2025-10-10)
    View
  • Waste Disposal Plan#New(2025-10-10)
    View
  • Water Supply Plan#New(2025-10-10)
    View
  • Electricity Supply Plan#New(2025-10-10)
    View
  • Development Work Plan#New(2025-10-10)
    View
  • Affidavit (Form-B)#New(2025-11-09)
    View
  • CA CERTIFICATE#New(2025-10-10)
    View
  • ARCHITECT CERTIFICATE#New(2025-10-10)
    View
  • ENGINEERS CERTIFICATE#New(2025-10-10)
    View
  • Other#New(2025-11-10)
    View
  • Proforma of Agreement for Sale#New(2025-10-10)
    View

Land documents

  • Sale Deed#2802(2017-04-06)
    17786886312.pdf
    View
  • Extract of Khatauni#1427-1432(1 ST JULY 2019 TO 30 JUNE 2025)(1900-01-01)
    17786884720.pdf
    View

Project Team

Architect AddressA-244, Behind Angel Mega Mall, Kaushambi Ghaziabad, U.P.201010
Engineer Address503, SACHDEVA CORPORATE PARK, PLOT NO 18, COMMUNITY CENTRE, SEC-18, ROHINI, DELHI-110085

Developer & Contact

Developer

Promoter NameDBF INFRASTRUCTURE PVT LTD.
Promoter AddressDBF BUILDING, GARHI- GULDHAR, DELHI-MEERUT ROAD, GHAZIABAD UP.
Company TypeCompany
Mobile8130722669
Emaildbf.narendra@gmail.com
Registered AddressDBF BUILDING, GARHI- GULDHAR, DELHI-MEERUT ROAD, GHAZIABAD UP.
Contractor AddressDBF Building , Meerut Road, Ghaziabad, U.P.-201003

Bank Accounts

Account Typecollection
Account Number258826300024
Account NameDBF INFRASTRUCTURE PRIVATE LIMITED COLLECTION ACCOUNT FOR ZOOM ARCADE
Bank NameIndusind Bank
BranchRaj Nagar Extension, Ghaziabad
Branch AddressGround Floor, Shop No. 1 to 4, and 11 to 14, Raj Nagar Residency, Raj Nagar Extension, Ghaziabad, U.P.-201003
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCINDB0002090
Branch Emailyasmeen.yasarkhan@indusind.com
Account Typeseparate
Account Number258130277575
Account NameDBF INFRASTRUCTURE PVT LTD SEPARATE ACCOUNT FOR ZOOM ARCADE
Bank NameINDUSIND BANK
BranchRAJ NAGAR EXTENSION, GHAZIABAD.
Branch AddressGround Floor, Shop No. 1 to 4, and 11 to 14, Raj Nagar Residency, Raj Nagar Extension, Ghaziabad, U.P.-201003
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCINDB0002090
Account Typetransaction
Account Number258800402750
Account NameDBF INFRASTRUCTURE PVT LTD RERA TRANSACTION ACCOUNT FOR ZOOM ARCADE
Bank NameINDUSIND BANK
BranchRAJ NAGAR EXTENSION, GHAZIABAD
Branch AddressGROUND FLOOR, SHOP NO 1 TO 4 AND 11 TO 14 RAJ NAGAR RESIDENCY, RAJ NAGAR EXTENSION, GHAZIABAD, U.P.201003
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCINDB0002090

Development & Facilities

Development works

Demarcation Of PlotsPlot No. 1183m and 1185m at Village Noor Nagar, Ghaziabad, U.P. Total plot area 4213.94 sqm, Method of Demarcation -Field Work and site survey and plot boundary demarcated as per point given by the patwari.
Boundary WallTotal length -258.44M height-2.1m high boundary wall with 1.8 high brick work and 0.60m high mild steel grill between two R.C.C columns approxx 4.5m centre to centre. The boundary wall shall be earth bearing and finished with cement morter plaster and weather proof exterior paints.
Road WorkTotal road length -220M. width -6m number of lanes-2. All roads in the complex will be in M25 grade concrete. Roads will be water bound macadam with saucer drain in sides.
FootpathsNA
Water Supply Including Drinking Water FacilitiesUGT- Fire tanks-75KLx2nos Raw Water Storage Tanks -50KLDX1nos Domestic Water storage Tanks--50KLDX1nos. The daily potable domestic water requirement shall be met through municipal, tanker and augmented through bore well water supply with necessary approval from the concerned authorities. Qualty of domestic water shall be as per latest IS code 10500. The water treatment shall be through multi grade filter
Sewer SystemMain sewer line has been designed using two pipe system and polyproylene will be used in the vertical stacks in the shafts partially sewer line will be lay in basement ceiling will be finally connected to the STP, length of sewer line is approx 100 mtr in basement ceiling of 150 mm dia pipe.
DrainUnderground HDPE DWC SN4/sn8 pipeline drain will be lay in slope as per norms and collecting chambers as per the norms will be provide to collect surface rain water. Polypropylane will be used in the vertical stacks in the shafts then through basement ceiling will be finally connected to external chambers lengths of storms line is approx 250 meters of 250 mm dia pipe.
ParksGreen area 210.71 sq, M. lush green landscaped internal park will be provided and maintained. The landscaped parks will have joggings tracks, pavalion, lights and siting areas. The total park area in the project will be minimum 5 of the total plot area.
Tree PlantingOn tree for every 100 square meter (total 43 nos) of land needs to be planted within construction sites for the buildings, ensuring 5 percentage green cover for total plot area . The trees will be planted at all suitable locations of the project and along the boundary walls. The tree locations. Threes will be planted in a manner to ensure that there is no hindrance in the services/usage in the project.
Design For Electric Supply Including Street Lighting1. 2O NOS led street light fixtures has been considered with digital timer and DG backup with 625 KVA DG backup. 2. 2 nos 800 KVA transformer has been considered. 3. LED night Fixture has been considered. Electric supply provided through 33/0.415 KV transformers and by DG set supply for backup. External street lighting shall be through solar power with alternate supply through.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage Water80 KLD of MBBR+UF will be installed at basement process using PVC media and fine bubble diffused aeration system followed by send filter and activated carbon filter and chlorination for treat the sewer and treated water will be recycled for use in flushing and gardening .
Solid Waste Management And Disposal SystemApprox 300 KG Solid waster management and disposal system will be done by the external vendor by collecting the garbage from the dustbin/shops and segregate the same for the recycling the dry waste and prepare the compost from the wet waste.
Water Conservation System2 nos of cum rain water harvesting pit has plan in the open area for recharge the ground water by collect the rain water from terrace and road surface area and low flow sanitary fixtures will be used for water efficiency.
Energy Management System Including Use Of Renewable Energy1. as per GHIHA requirement 5 percentage of the total load has been consider on roof Top solar system i.e. 55 KWP. 2. 110 nos of Solar Panel is provided. 3. Grid Integration system is provided.
Fire Protection And Fire Safety System16 nos Hydrant and automatic sprinkler System will be provide as per as per the fire departments guidelines by fulfill the fire norms as per NBC. Social infrastructure and other public amenities including public health services and 2nos staircase for fire exits. As per NBC-2016, automatic fire detection and fire alarm system is provided.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFire stair case shall be provided as per approved fire drawing for evacuation to open areas.
Other Miscellaneous WorkNA

Financials

Registration Fee (₹)53000
Project Duration (months)57